Home / Browse projects / Ahmednagar, Maharashtra / SAICHINTAN PHASE 2

Registration lapsed No litigation declared Residential / Group Housing project

SAICHINTAN PHASE 2

By SILVEROAK BUILDCON PVT. LTD.

RG-MH-01849 · RERA P52200004232 · Last updated on MahaRERA portal: 26 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 29 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
60 of 88Construction stages doneacross 8 buildings; furthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

SAICHINTAN PHASE 2 is a Residential / Group Housing project by SILVEROAK BUILDCON PVT. LTD. in Ahmednagar, Maharashtra, registered with MahaRERA as P52200004232 on 9 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 29 months from the original filing.

At a glance

Project

  • NameSAICHINTAN PHASE 2
  • TypeResidential / Group Housing
  • Location
    • RUI ROAD
    • NIMGAON SHIV
    • Nighoj
    • Rahta
    • Ahmednagar
    • 423109
  • Pincode423109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200004232
  • ReraGenie IDRG-MH-01849

Builder

  • NameSILVEROAK BUILDCON PVT. LTD.
  • Entity typeCompany
  • Managing DirectorNIKHIL PRAKASH NIKAM
  • ChairpersonsJITENDRA GANPATRAO SHELKE, PRAKASH RAMRAO NIKAM
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseJan 2023Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jan 2023)
  • Buildings8 building records
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA50000
ENA50000
HNA50000
INA50000
BUNGLOW OB1NA20000
BUNGLOW OB2NA20000
PLOT NO 3 PARTANA20000
PLOT NO 3 PART BNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Staircases, at 95%.

D85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
E86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
H83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
I86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUNGLOW OB175%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
BUNGLOW OB275%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
PLOT NO 3 PARTA32%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PLOT NO 3 PART B74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes50%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered4
Open Space48
BuildingClosed/CoveredOpen SpaceTotal
D189
E189
H189
I189
PLOT NO 3 PARTA088
PLOT NO 3 PART B088

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,238 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
CHANDRAKANT BABURAO MATENighojAhmednagar
VASANT BABURAO MATENighojAhmednagar

Approvals and building plan

Permissible FSI7857.2
Proposed, not sanctioned4,982 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIRDI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIKAM PATIL ASSOCIATES
EngineerTECH CONSULTING ENGINEER
PartnerRole in project
SILVEROAK BUILDCON PVT. LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52200018412Jan 2023 → Jun 2025

Reason as filed by the promoterDue to large unsold inventories the construction activities will be taking time to get complete. hence. the extension is required and the consent of the clients of sold units is attached herewith.

EXT52200013114Jan 2023 → Dec 2023

Reason as filed by the promoterThe reason behind delay is because there is no sale of any unit in our building D, E, H, I, BUNGLOW ONE (OB1), BUNGLOW TWO (OB2 and Also heavy Rain fall in this Year construction activity was stop.( Due to uncertain supply of goods/ unavailable labor)

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: CA saichintan jun24.pdf26 Dec 2024
Certificates of CA (Form 3)File: CA saichintan sep24.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Booking Saichintan Ph 2 jun24.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: BookingSaichintan Ph 2 Sep24.pdf26 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Sai Chintan 1-07-24.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ER Sai Chintan 1-10-24.pdf21 Dec 2024
Certificates of CA (Form 3)File: CA Saichintan Sep24_compressed.pdf21 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Sai Chintan 1jul24.pdf21 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Sai Chintan 1-10-24.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Saichintan April 24.pdf27 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Saichintan april24.pdf27 Jun 2024
Disclosure of sold/ booked inventoryFile: Booking Saichintan April 24.pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate SAICHINTAN (1)_compressed.pdf28 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg 110 23 Saichintan.pdf28 Nov 2023
Certificates of CA (Form 3)File: CA Saichintan 1-7-23.pdf28 Nov 2023
Certificates of CA (Form 3)File: CA Saichintan 1-10-23.pdf28 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Annual Report Saichinta.pdf28 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar saichintan july 23.pdf7 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Chintan Engg july 23.pdf7 Aug 2023
Disclosure of sold/ booked inventoryFile: Saichintan Phase 2 Bokking july23.pdf7 Aug 2023
Certificates of CA (Form 3)File: Form 3 _ Sai Chintan _December 2022 CA.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F 5 Saichitan.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Saichintan 1 1 23.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Saichintan 1 1 23.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Saichintan Sep22_c.pdf22 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate saichintan_compressed.pdf22 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality SAICHINTA Sep22.pdf22 Oct 2022
Disclosure of sold/ booked inventoryFile: Booking Saichitan Sep22.pdf22 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar certificate Goldcoast 1 4 22.pdf9 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Gold coast 1 7 22.pdf9 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar certificate Goldcoast 1 4 22.pdf9 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Gold coast 1 7 22.pdf9 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saichintan Engg.pdf25 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: saichintan Quality.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: Booking Sai chintan ph2.pdf25 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Chitan Phase 2.pdf25 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sai Chitan Quailty 5.pdf25 May 2022
Disclosure of sold/ booked inventoryFile: Sai Chintan Bokking.pdf25 May 2022
Certificates of CA (Form 3)File: CA saichintan Dec21.pdf17 Jan 2022
Certificates of CA (Form 3)File: CA saichintan Dec21.pdf17 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar saichitan Dec21.pdf8 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg saichintan Dec.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Qualityengineer Saihintan.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: Book Saichintan.pdf8 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Silveroak Buildcon Private.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Silveroak Buildcon Private.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Silveroak Buildcon Private.pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saichintan-Ar Sep21.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Saichintan Quality sep 21.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: sai chinta phase 2Booking details.pdf8 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saichintan Engineer's certificate Sep.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3_Saichintan_September 2021.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3_Sai Chintan_Annexure A.pdf7 Oct 2021
Declaration about Commencement CertificateFile: Saichintan Commencement.pdf21 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saichintan ARCHITEH'S CERTIFICATE.pdf21 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate saichatain.pdf21 Sep 2021
Building plan approvalFile: scan374.pdf18 Sep 2021
Building Plan Approval (IOD)File: scan374.pdf18 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Row House Construction Permission-.pdf18 Sep 2021
Certificates of CA (Form 3)File: Form 3_Sai Chintan_June 2021.pdf21 Aug 2021
Certificates of CA (Form 3)File: Form 3_Sai Chintan_Mar 2021.pdf21 Aug 2021
Declaration about Commencement CertificateFile: Saichintan.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality A Saichintan March21.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality A Saichintan June21.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saichintan 2-4-21 1st 4th Quarter 20-21.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: saichintan 2-7-21 1st Quarter 21.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saichintan 2-4-21 1st 4th Quarter 20-21.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: saichintan 2-7-21 1st Quarter 21.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saichintan 2-4-21 1st 4th Quarter 20-21.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: saichintan 2-7-21 1st Quarter 21.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saichintan 02-04-2021 1st Quarter.pdf13 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saichintan 02-07-2021 2nd quarter.pdf13 Jul 2021
Disclosure of sold/ booked inventoryFile: Saichintan 2 booked.pdf13 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA annual report.pdf10 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certificate April20.pdf30 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certificate April20.pdf30 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate April20.pdf30 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate April20.pdf30 Nov 2020
Certificates of CA (Form 3)File: Shirdi CA Cerificate Q4th Jan,Feb,Mar2020.pdf30 Nov 2020
Certificates of CA (Form 3)File: Shirdi CA Cerificate Q1 Apri,May,Jun 2020.pdf30 Nov 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SONCHAFAGAT 686 1 NAGAR HIGHWAY WAGHOLI90CompletedDec 2017Jul 2017
SAICHINTAN PHASE1GAT NO 2 2 AND 2 4 AT NIGHOJ TAL RAHATA DIST AHMEDNAGAR97CompletedJul 2017Jul 2017
PLATINUM1S NO 15 9 AT SHIRDI TAL RAHATA DIST AHMEDNAGAR115CompletedMar 2016Mar 2016
PLATINUM 2 PHASE 1S NO 15 2 P PLOT NO 1 AT SHIRDI TAL RAHATA DIST AHMEDNAGAR24CompletedJun 2015Jun 2015

How this compares with Ahmednagar

7%of Ahmednagar projects moved their completion datethis one moved by 29 months
28%of Ahmednagar registrations have lapsed or been cancelledthis one is among them

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep SAICHINTAN PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIMGAON SHIV490+ in Ahmednagar

Builder: SILVEROAK BUILDCON PVT. LTD.

SILVEROAK BUILDCON PVT. LTD. has 2 registrations on MahaRERA, including SAICHINTAN PHASE 2 and PLATINUM PHASE 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What does it mean that SAICHINTAN PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAICHINTAN PHASE 2 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAICHINTAN PHASE 2?

The registered promoter entity is SILVEROAK BUILDCON PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAICHINTAN PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAICHINTAN PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAICHINTAN PHASE 2?

The professionals named in the filing: Architect: NIKAM PATIL ASSOCIATES; Engineer: TECH CONSULTING ENGINEER. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAICHINTAN PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAICHINTAN PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAICHINTAN PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.