Home / Browse projects / Ahmednagar, Maharashtra / PLATINUM PHASE 2
PLATINUM PHASE 2
By SILVEROAK BUILDCON PVT. LTD.
RG-MH-13815 · RERA P52200028721 · Last updated on MahaRERA portal: 26 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PLATINUM PHASE 2 is a Residential / Group Housing project by SILVEROAK BUILDCON PVT. LTD. in Ahmednagar, Maharashtra, registered with MahaRERA as P52200028721 on 25 Mar 2021. Possession was promised by 23 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NamePLATINUM PHASE 2
- TypeResidential / Group Housing
- Location
- PIMPALWADI ROAD
- NEAR HP GAS SHIRDI
- Shirdi(N P)
- Rahta
- Ahmednagar
- 423109
- Pincode423109
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52200028721
- ReraGenie IDRG-MH-13815
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Mar 2021
- Promised completion23 Dec 2025
- Revised completionNone
- Buildings6 building records
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TWIN BUNGALOW - S1A AND S1B | NA | 2 | 0 | 0 | 0 | 0 |
| TWIN BUNGALOW - S2A AND S2B | NA | 2 | 0 | 0 | 0 | 0 |
| TWIN BUNGALOW - S3A AND S3B | NA | 2 | 0 | 0 | 0 | 0 |
| TWIN BUNGALOW - S4A AND S4B | NA | 2 | 0 | 0 | 0 | 0 |
| TWIN BUNGALOW - S5A AND S5B | NA | 2 | 0 | 0 | 0 | 0 |
| TWIN BUNGALOW - S6A AND S6B | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
35 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 97%.
TWIN BUNGALOW - S1A AND S1B77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
TWIN BUNGALOW - S2A AND S2B39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TWIN BUNGALOW - S3A AND S3B62%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TWIN BUNGALOW - S4A AND S4B67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TWIN BUNGALOW - S5A AND S5B73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TWIN BUNGALOW - S6A AND S6B41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TWIN BUNGALOW - S1A AND S1B | 2 | 2 |
| TWIN BUNGALOW - S2A AND S2B | 2 | 2 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MR KONDAJI SAKHARAM GONDKAR | Shirdi(N P) | Ahmednagar |
| MR SANTOSH KONDAJI GONDKAR | Shirdi(N P) | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR JORI VIKAS |
| Architect | V S G S |
| Engineer | SAI CONSULTANTS |
| Chartered Accountant | Namrata Kalpesh Dhruve and co |
| Chartered Accountant | Natwar D murda |
| Partner | Role in project |
|---|---|
| SILVEROAK BUILDCON PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA platinum jun24.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA platinum sep24.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Platinum Ph 2 jun24.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Platinum ph 2 Sep24.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Platinum Phase II 1-07-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Platinum Phase II 1-10-24.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PLatinumph2 Sep24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AR Sai Chintan 1-07-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Platinum Phase II 1-7-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Platinum Phase II 1-10-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Platinum April 24.pdf | 26 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Platinum ph2 april24.pdf | 26 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Booking ph2 1 april 24.pdf | 26 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate PLATINUM PHASE 2_compressed.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg 1 10 23 Silver Oak Platinum.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Platinum 1-7-23.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Platinum 1-10-23.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Report 23 platinum ph2.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Platinum Phase II.pdf | 6 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum phase2 Engineers certificaicate C.pdf | 6 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Platinum Phase 2 Booking july23.pdf | 6 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Platinum Phase 2 Booking july23.pdf | 6 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ Platinum _December 2022 CA.pdf | 15 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F 5 Platinum.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F 5 Platinum.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F 5 Platinum.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar platinum 1 1 23.pdf | 5 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg platinum ph2 1 1 23.pdf | 5 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Platinum Sep 22.pdf | 22 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate platinum ph 2.pdf | 22 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality platinum ph2.pdf | 22 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Booking Platinum ph2.pdf | 22 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar platinum 2 14 22.pdf | 9 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR platinum ph2 1 7 22.pdf | 9 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Engg.pdf | 25 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Platinum.pdf | 25 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Booking P2.pdf | 25 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Phase 2 c.pdf | 25 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Platinum Phase 2 Quailty 5.pdf | 25 May 2022 |
| Disclosure of sold/ booked inventoryFile: Platinum Phase 2 Bokking.pdf | 25 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Platinum Dec21.pdf | 17 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar platinum ph2.pdf | 8 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Platinum 2.pdf | 8 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Engineer platinum.pdf | 8 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Booked platinum.pdf | 8 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Silveroak Buildcon Private 2021.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: silveroak platinum 2 Sep21.pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: platinum sep21 booking.pdf | 8 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: platinum 2 Ar sep21.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: platinum 2.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum 2 Engineer's certificate.pdf | 7 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Platinum_September 2021.pdf | 7 Oct 2021 |
| Declaration about Commencement CertificateFile: Platinum2.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality A Platinum ph2 June 21.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality A Platinum ph2 June 21.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality A Platinum ph2 March21.pdf | 14 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOBPLPlatinum Bunglow Form 3 March 2021.pdf | 13 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOBPLPlatinum BunglowForm 3 June 2021.pdf | 13 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum ph 2 4th quarter.pdf | 9 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum ph 2 1st quarter 2021.pdf | 9 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: platinum PH2 02-04-2021 1st Quarter.pdf | 9 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: platinum Ph2 01-07-2021 1st Quarter.pdf | 9 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: platinum Ph2 01-07-2021 1st Quarter.pdf | 9 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Platinum ph2 booked.pdf | 9 Aug 2021 |
| Copy of the legal title reportFile: legal title Report-.pdf | 24 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate Twin.pdf | 11 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Platinum Ph II.pdf | 11 Mar 2021 |
| Details of encumbrancesFile: encumbrance.pdf | 10 Mar 2021 |
| Declaration in FORM BFile: FORM B LANDOWNER.pdf | 10 Mar 2021 |
| Declaration in FORM BFile: FORM B LANDOWNER.pdf | 10 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate Twin bunglow(3)_reduce.pdf | 10 Mar 2021 |
| Layout approvalFile: Layout.pdf | 9 Mar 2021 |
| Building plan approvalFile: PLAN.pdf | 9 Mar 2021 |
| PAN CardFile: PAN-SOBPL.pdf | 9 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 9 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf | 9 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Construction Permission.pdf | 9 Mar 2021 |
| Declaration in FORM BFile: FORM B SOBPL.pdf | 9 Mar 2021 |
| Proforma of Allotment letterFile: Allotment Letter Platinum 2.pdf | 9 Mar 2021 |
| Proforma of Allotment letterFile: Platinum II Agreement to Sale.pdf | 9 Mar 2021 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SONCHAFA | GAT 686 1 NAGAR HIGHWAY WAGHOLI | 90 | Completed | Dec 2017 | Jul 2017 |
| SAICHINTAN PHASE1 | GAT NO 2 2 AND 2 4 AT NIGHOJ TAL RAHATA DIST AHMEDNAGAR | 97 | Completed | Jul 2017 | Jul 2017 |
| PLATINUM1 | S NO 15 9 AT SHIRDI TAL RAHATA DIST AHMEDNAGAR | 115 | Completed | Mar 2016 | Mar 2016 |
| PLATINUM 2 PHASE 1 | S NO 15 2 P PLOT NO 1 AT SHIRDI TAL RAHATA DIST AHMEDNAGAR | 24 | Completed | Jun 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmednagar
Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PLATINUM PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR HP GAS SHIRDI490+ in Ahmednagar
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
SHREE SAI NIRMAN DREAM CITY
SHREE SAI NIRMAN REALTY
SILVEROAK GOLD COAST
SILVER OAK BUILDERS AND DEVELOPERS
Ranmale Residential
Promoter name not stated in filing
GURUPRASAD RESIDENCY
NARESH SAMPATLAL PARAKH V ITAR
SAI GHAR
Suwarnsparsh Infrastructure LLP
SAI HERMITAGE SHIRDI - BY ANANTA BLOCK - 4
HARIHAR INFRAVENTURE (INDIA) PRIVATE LIMIT
See every Ahmednagar project, with the district possession charts
Builder: SILVEROAK BUILDCON PVT. LTD.
SILVEROAK BUILDCON PVT. LTD. has 2 registrations on MahaRERA, including SAICHINTAN PHASE 2 and PLATINUM PHASE 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.
Frequently asked questions
What does it mean that PLATINUM PHASE 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PLATINUM PHASE 2 is delayed beyond 23 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PLATINUM PHASE 2?
The registered promoter entity is SILVEROAK BUILDCON PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PLATINUM PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PLATINUM PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PLATINUM PHASE 2?
The professionals named in the filing: Architect: MR JORI VIKAS; Architect: V S G S; Engineer: SAI CONSULTANTS; Chartered Accountant: Namrata Kalpesh Dhruve and co; Chartered Accountant: Natwar D murda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PLATINUM PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback