New projects and RERA data in Ahmednagar district, Maharashtra

497 projects are registered in Ahmednagar district: 6,288 units across them, 30 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

497Projects covered
30Registered, last 12 months
6,288Units declared
4,916Units not yet booked
36Completion dates revised
0With declared litigation

Of the 497 covered registrations, 36 have revised their promised completion date and 0 declare litigation. The median project here is 10% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Ahmednagar projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 497 projects with a promised date, 234 are recorded delivered, 119 are still on the register and 144 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 2 projects, delivered’172018: 33 projects, delivered2018: 3 projects, registration lapsed or cancelled’182019: 28 projects, delivered2019: 8 projects, registration lapsed or cancelled’192020: 14 projects, delivered2020: 9 projects, registration lapsed or cancelled’202021: 21 projects, delivered2021: 13 projects, registration lapsed or cancelled’212022: 24 projects, delivered2022: 17 projects, registration lapsed or cancelled’222023: 26 projects, delivered2023: 26 projects, registration lapsed or cancelled’232024: 30 projects, delivered2024: 18 projects, registration lapsed or cancelled’242025: 23 projects, delivered2025: 32 projects, registration lapsed or cancelled’252026: 21 projects, delivered2026: 30 projects, on the register2026: 18 projects, registration lapsed or cancelled’262027: 9 projects, delivered2027: 37 projects, on the register’272028: 1 projects, delivered2028: 19 projects, on the register’282029: 2 projects, delivered2029: 12 projects, on the register’292030: 14 projects, on the register’302031: 5 projects, on the register’312032: 1 projects, on the register’322035: 1 projects, on the register’35

170 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05001,0001,5002,000today’172018: 94 flats, delivered (only 1 of 36 projects filed a flat count)’18’19’202021: 116 flats, delivered (only 3 of 34 projects filed a flat count)’21’222023: 67 flats, registration lapsed or cancelled (only 2 of 52 projects filed a flat count)’232024: 147 flats, delivered (only 6 of 48 projects filed a flat count)2024: 53 flats, registration lapsed or cancelled (only 6 of 48 projects filed a flat count)’242025: 249 flats, registration lapsed or cancelled (only 6 of 55 projects filed a flat count)’252026: 167 flats, delivered (only 25 of 69 projects filed a flat count)2026: 1,330 flats, on the register (only 25 of 69 projects filed a flat count)2026: 219 flats, registration lapsed or cancelled (only 25 of 69 projects filed a flat count)’262027: 90 flats, delivered2027: 1,137 flats, on the register’272028: 116 flats, delivered2028: 697 flats, on the register’282029: 27 flats, delivered2029: 538 flats, on the register’292030: 781 flats, on the register’302031: 380 flats, on the register’312032: 8 flats, on the register’322035: 72 flats, on the register’35

5,562 flats are promised in 2026 or later, across the 54% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Ahmednagar possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 36 of 497 projects (7%) have moved at least once; the median move is 24 months and the longest is 126 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 2 projects kept the original date, 100% of the year’17Originally due 2018: 36 projects kept the original date, 86% of the yearOriginally due 2018: 4 projects moved by under 2 years, 10% of the yearOriginally due 2018: 2 projects moved by 2 years or more, 5% of the year’18Originally due 2019: 34 projects kept the original date, 83% of the yearOriginally due 2019: 1 projects moved by under 2 years, 2% of the yearOriginally due 2019: 6 projects moved by 2 years or more, 15% of the year’19Originally due 2020: 19 projects kept the original date, 83% of the yearOriginally due 2020: 1 projects moved by under 2 years, 4% of the yearOriginally due 2020: 3 projects moved by 2 years or more, 13% of the year’20Originally due 2021: 30 projects kept the original date, 86% of the yearOriginally due 2021: 2 projects moved by under 2 years, 6% of the yearOriginally due 2021: 3 projects moved by 2 years or more, 9% of the year’21Originally due 2022: 37 projects kept the original date, 100% of the year’22Originally due 2023: 51 projects kept the original date, 91% of the yearOriginally due 2023: 2 projects moved by under 2 years, 4% of the yearOriginally due 2023: 3 projects moved by 2 years or more, 5% of the year’23Originally due 2024: 44 projects kept the original date, 90% of the yearOriginally due 2024: 2 projects moved by under 2 years, 4% of the yearOriginally due 2024: 3 projects moved by 2 years or more, 6% of the year’24Originally due 2025: 51 projects kept the original date, 93% of the yearOriginally due 2025: 2 projects moved by under 2 years, 4% of the yearOriginally due 2025: 2 projects moved by 2 years or more, 4% of the year’25Originally due 2026: 62 projects kept the original date, 100% of the year’26Originally due 2027: 45 projects kept the original date, 100% of the year’27Originally due 2028: 18 projects kept the original date, 100% of the year’28Originally due 2029: 12 projects kept the original date, 100% of the year’29Originally due 2030: 13 projects kept the original date, 100% of the year’30Originally due 2031: 5 projects kept the original date, 100% of the year’31Originally due 2032: 1 projects kept the original date, 100% of the year’32Originally due 2035: 1 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05001,0001,5002,000’17Originally due 2018: 94 flats kept the original date, 86% of the year (only 1 of 42 projects filed a flat count)’18’19Originally due 2020: 6 flats moved by under 2 years, 4% of the year (only 2 of 23 projects filed a flat count)Originally due 2020: 46 flats moved by 2 years or more, 13% of the year (only 2 of 23 projects filed a flat count)’20Originally due 2021: 110 flats kept the original date, 86% of the year (only 3 of 35 projects filed a flat count)Originally due 2021: 5 flats moved by 2 years or more, 9% of the year (only 3 of 35 projects filed a flat count)’21’22Originally due 2023: 67 flats kept the original date, 91% of the year (only 3 of 56 projects filed a flat count)Originally due 2023: 108 flats moved by 2 years or more, 5% of the year (only 3 of 56 projects filed a flat count)’23Originally due 2024: 200 flats kept the original date, 90% of the year (only 10 of 49 projects filed a flat count)Originally due 2024: 84 flats moved by under 2 years, 4% of the year (only 10 of 49 projects filed a flat count)Originally due 2024: 621 flats moved by 2 years or more, 6% of the year (only 10 of 49 projects filed a flat count)’24Originally due 2025: 165 flats kept the original date, 93% of the year (only 9 of 55 projects filed a flat count)Originally due 2025: 89 flats moved by under 2 years, 4% of the year (only 9 of 55 projects filed a flat count)Originally due 2025: 93 flats moved by 2 years or more, 4% of the year (only 9 of 55 projects filed a flat count)’25Originally due 2026: 968 flats kept the original date, 100% of the year (only 19 of 62 projects filed a flat count)’26Originally due 2027: 1,190 flats kept the original date, 100% of the year (only 22 of 45 projects filed a flat count)’27Originally due 2028: 692 flats kept the original date, 100% of the year’28Originally due 2029: 565 flats kept the original date, 100% of the year’29Originally due 2030: 725 flats kept the original date, 100% of the year’30Originally due 2031: 380 flats kept the original date, 100% of the year’31Originally due 2032: 8 flats kept the original date, 100% of the year’32Originally due 2035: 72 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Ahmednagar

Who sanctions building in Ahmednagar

106 of the 497 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Ahmednagar Municipal Corporation22
AHILYANAGAR MUNICIPAL CORPORATION15
SHRIRAMPUR MUNICIPAL COUNCIL11
Kopargaon Municipal Council10
37 other bodies48

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 497 registrations on this page answers this: on 333 the promoter is the only owner named; on 150 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 14 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Ahmednagar: projects by taluka

497 of the 497 registrations on this page name their taluka.

TalukaProjectsShare
Nagar24349%
Shrirampur4910%
Kopargaon439%
Rahta337%
Sangamner337%
Shrigonda224%
Parner214%
8 other talukas5311%

Projects in Ahmednagar

Showing 1 to 60 of 497 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
SHREE SAI NIRMAN DREAM CITYSHIRDI, 423109SHREE SAI NIRMAN REALTY43531%12 Dec 2019Registered
SampurnamDholewadi, 422605KAMALGANGA BUILDCON26143%20 Apr 2022Registered
CROWN PLAZABHISTABAUG CHOWK SAVEDI, 414001MAHAVIR INFRA PLUS LLP25540%30 May 2023Registered
PLATINUM PLAZADELHI GATE, 414001SPY DEVELOPERS BUILDERS AND SUPPLIERS2390%18 Mar 2026Registered
ARUNAM HIGH STREET & RESIDENCESSAVEDI, 414003HARSHAL SANTOSH BHANDARI1873%5 Mar 2026Registered
Sandal Suites ShirdiNighoj, 414001Sandal Lands Private Limited1630%6 Jan 2026Registered
Mauli Green Park Phase-1Near Tata Motors, 414301Mauli Developers14210%7 Nov 2020Registered
SUKHSAGAR NAGAR PHASE 2MAUJE JAMKHED, 413201ICON ENTERPRISES1320%9 Jun 2026Registered
SHRI SAI SINDHU PARK DEVELOPERSLONI BK, 413736SHRI SAI SINDHU PARK DEVELOPERS12613%10 May 2021Registered
JAY BHADRA RESIDENCYGUNJALWADI, 422605Santosh Ramesh Fatangare1220%12 Mar 2026Registered
SKY COURTSAWEDI, 414003ASPIRE CONSTRUCTIONS LLP11630%28 Jun 2017Completed
INDU PAVILIONSAVEDI, 414003SOLUTIIONEYES CONSULTANCY SERVICESS & CONSTRUCTIONS PRIVATE LIMITED10812%12 Dec 2019Registration lapsed
BABA BUSINESS CENTREKopargaon (M Cl), 423601BABA BUSINESS CENTRE990%16 Sep 2025Registered
R M Dhariwal Township Rashin PlottingRashin, 414403Dhariwal And Chhoriya Buildcon Pvt Ltd9498%9 Aug 2017Completed
Sai TowersKopargaon, 423601SAI CITY PROMOTERS AND DEVELOPERS9427%31 Jan 2025Registered
REGENTSUKKAR CHOWK, 414001RISELIFE SPACES882%15 May 2023Registered
SILVEROAK GOLD COASTNEAR VITTHAL RUKHMINI MANDIR, 423109SILVER OAK BUILDERS AND DEVELOPERS8443%18 Feb 2021Registration lapsed
Shiv Tirth HeightsTaluka Parner, 414302Global Infrastructure8121%10 Oct 2024Registered
NATURE VALLEYJATEGAON, 414301RADHAKRUSHNA MADHUKAR KALE7933%16 Dec 2020Completed
Balaji HeightsJamkhed, 413201JSM DEVELOPERS774%2 May 2024Registered
YUVRAJ RESIDENCYSURVEY NO 66/3/1 MALIWADA, 414001ASHOK LALCHAND DESARDA7679%14 Jan 2020Registration lapsed
CHINTAMANI RESIDENCYSakur, 422622VISHAL VISHWAS KALE720%3 Sep 2026Registered
PARTH HEIGHTS PHASE 3KEDGAON, 414005RAJENDRA RAMCHANDRA PAWAR7232%24 Jul 2023Registered
TRIDENTSAVEDI, 414003Makarand Madhav Kulkarni720%13 Nov 2024Registered
IVAAN TOWERShrirampur, 413709Gaurav Vishwanath Awati7017%10 Sep 2025Registered
Unicorn Nest IISangamner, 422605Unicorn Developers7070%3 Jun 2020Registration lapsed
SAI AGASTYA PRIDEAKOLE, 422601MILIND SAINATH NAIKWADI686%18 Mar 2026Registered
ELITE 18PIPELINE ROAD, 414003NILAYA GROUP640%14 Jul 2025Registered
Navdurga HeightsShrirampur, 413709GENIOTIVE LIFESPACE LLP630%10 Apr 2026Registered
RAOJI HEIGHTSRAHATA, 423107BABA ENTERPRISES636%7 Jul 2023Registered
HARSH NAGARNEAR KARJAT ST STAND, 414402Harshkumar Bhikulal Shah620%26 Dec 2017Completed
Saitej ApartmentKedgaon, 414005GDPS CONSTRUCTION LLP613%23 Feb 2026Registered
SHAM SUNDER PALACESAVEDI, 414003KRUSHNA CONSTRUCTION AND LAND DEVELOPERS612%23 Jun 2023Registered
ArabellaNalegaon, 414001Marc Developers6070%8 Dec 2022Completed
RAJRAJESHWARI APPARTMENTAHMEDNAGAR, 414001SHANKARLEELA DEVELOPERS602%31 May 2024Registered
YAMUNA ENCLAVEShrigonda(MCL), 413701Deepali Dattu Nawale5812%9 Oct 2025Registered
MORYA GANGAISANGAMNER, 422605MORYA CONSTRUCTION5739%26 Sep 2022Registered
MadhubanNagar Manmad Road Ahmednagar, 423107Prasad Developers560%28 Jun 2020Registered
SKYLINE TOWERJamkhed (CT), 413201SHEELADIP ENTERPRISES560%29 Apr 2026Registered
GANGOTRI PHASE 2GAT NO. 1107/1, 413701RAJENDRA BHAU GANJURE, VILAS SANJAY GANJURE, ROHIT SANJAY GANJURE540%10 Jun 2026Registered
SARASWATI TOWEREKNATH NAGAR, 414001SARASWATI DEVELOPERS5353%10 Oct 2023Completed
HARISH ENCLAVEKAWADE NAGAR, 414001M V REALITIES5242%26 Apr 2021Registered
Arihant PearlSupa, 414301Madan Nemichand Bafana5070%24 Jul 2023Registered
Adinath SocietyNEW S.NO 66/1 TO 10/97, CTS NO 2056/E, DP ,SHRIRAMPUR, 413709ADINATH DEVELOPERS490%15 Jun 2026Registered
MOHAN NAGARKarjat, 414402MOHAN BHIKULAL SHAH480%8 Jan 2018Completed
ROYAL WOODSBhistabag, 414003KPGC Ventures Private Ltd.4831%3 Jan 2024Registered
SAI GREENWOOD - BSAI CITY, 423601SAIKRIPA PROMOTERS AND DEVELOPERS4825%31 Jul 2024Registered
CHAITANYA RESIDENCYNAV NAGAPUR, 414003GURUKRUPA PROMOTERS AND BUILDERS4615%19 Jul 2019Registered
Shiv-Pushpa SerenityDasre Nagar, 414003Space Buildcon4639%19 Jul 2019Registered
DHOLE COMPLEXOPP. VYAPARI MANGAL KARYALAY, WARD NO. 5, 413709GAURAV VISHWANATH AWATI4425%1 Apr 2023Completed
SAMARTHA PLAZASANGAMNER, 422605YASHASHRI BUILDCON440%2 May 2024Registered
SAI AJINKYAS. NO. 112/2/4 PLOT NO 2, 423601A.R.K. DEVELOPERS4347%16 Oct 2019Registration lapsed
LANDMARK OASISS. NO. 207/3/11, PLOT 11, SAI HARMONY, 423601SANJASWA BUILDCON420%18 Nov 2025Registered
Navrang HeightsSangamner, 422605Navrang Corporation420%23 Jan 2026Registered
NEELKANTH PRIDE PARKNA, 413709Neelkanth Developers4229%24 Jan 2025Registered
SATYABHAMA TOWERSOPP. VIJAY HOTEL, 413709GAURAV VISHVANATH AWATI4245%23 Oct 2024Completed
GIRIRAJShrigonda(MCL), 413701S K DEVELOPERS410%18 Mar 2026Registered
SANGAMNER CENTRALSANGAMNER BK, 422605FORTUNE DEVELOPERS4110%2 May 2024Registered
ARIHANT HILLSSupa, 414301Madan Nemichand Bafana400%9 Sep 2026Registered
SAFALYA HEIGHTSWARD NO. 06, 413709GAURAV VISHVANATH AWATI4040%4 Dec 2024Registered
Planning a launch in Ahmednagar? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Ahmednagar

Neelkanth Developers (11), Prasad Subhash Naik (11), Gaurav Vishwanath Awati (10), Madan Nemichand Bafana (9), Makarand Madhav Kulkarni (6), Madhumalti Costruction Pvt Ltd (6). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Ahmednagar projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 10% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Ahmednagar project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Ahmednagar district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Ahmednagar registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Ahmednagar project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Ahmednagar district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.