Home / Browse projects / Ahmednagar, Maharashtra / SILVEROAK GOLD COAST
SILVEROAK GOLD COAST
By SILVER OAK BUILDERS AND DEVELOPERS
RG-MH-13770 · RERA P52200028247 · Last updated on MahaRERA portal: 5 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVEROAK GOLD COAST is a Commercial project by SILVER OAK BUILDERS AND DEVELOPERS in Ahmednagar, Maharashtra, registered with MahaRERA as P52200028247 on 18 Feb 2021. Possession was promised by 23 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 36 of the 84 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete.
At a glance
Project
- NameSILVEROAK GOLD COAST
- TypeCommercial
- Location
- KANKURI ROAD
- NEAR VITTHAL RUKHMINI MANDIR
- Shirdi(N P)
- Rahta
- Ahmednagar
- 423109
- Pincode423109
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52200028247
- ReraGenie IDRG-MH-13770
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Feb 2021
- Promised completion23 Dec 2025
- Revised completionRevised to 23 Dec 2025 (originally 23 Dec 2024)
- Buildings3 building records
- Documents filed88 files
Current status
Figures as on 5 May 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 5 | 4 | 0 | 21 | 21 |
| B | NA | 2 | 2 | 0 | 21 | 21 |
| C | NA | 5 | 4 | 0 | 42 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 98%.
A47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 12% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 28% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 6 | 7 | 13 |
| B | 10 | 6 | 16 |
| C | 7 | 7 | 14 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SADASHIV MANKU SALIAN | - | Bangalore |
| SAVITREE SADASHIV SALIAN | - | Bangalore |
| SAPNA SADASHIV SALIAN | - | Bangalore |
| DROPADABAI GONDKAR | Shirdi(N P) | Ahmednagar |
| SANDEEP SADASHIV SALIAN | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JORI VIKAS ANAND |
| Architect | VSGS ARCHITECTS AND PLANNERS |
| Architect | NIKAM PATIL ASSOCIATES |
| Engineer | SAI CONSULTANTS |
| Engineer | Satish Gagare |
| Chartered Accountant | NAMRATA DHRUVE & CO |
| Chartered Accountant | Natwar D Marda and Co. |
| Partner | Role in project |
|---|---|
| SILVER OAK BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterlabor shortages and weather conditions (Heavy Rainfall ) We are actively addressing these issues and have implemented measures to minimize further delays. A revised timeline has been prepared.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 438/2019 | Rahata Court | Decision Pending from Court |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Gold Cost March25.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Gold Coast Mar 25.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Gold Cost March25.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Booking Gold Coat 2025.pdf | 5 May 2025 |
| Declaration in FORM BFile: gold cost Affidavit.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Gold Coast Q 1.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance 23 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Gold cost march24.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA gold cost jun24.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Gold cost sep24.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Goldcoast jun24.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Gold coast sep24.pdf | 26 Dec 2024 |
| CERSAI detailsFile: Booking Gold coast sep24.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Silveroak Gold Coast 1-4-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Silveroak Gold Coast1-7-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Silveroak Gold Coast1-10-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Silver oak GoldCoast 1-4-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Silver oak GoldCoast 1-7-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Silver oak GoldCoast1-10-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate SILVEROAK GOLD COATS_compressed (1).pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg 1 10 23 Silveroak Goldcoast (1).pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Goldcoast 1-7-23.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Goldcoast 2 1-7-23.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual report 23 Gold Coast.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Silveroak Goldcoast july 23.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Goldcoast Engineers certificate july 23.pdf | 7 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Goldcoast Booking july 23.pdf | 7 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F 5 Gold Coast.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F 5 Gold Coast.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Gold Coast 1 1 23.pdf | 5 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Gold Coast 1 1 23.pdf | 5 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Gold Sep22.pdf | 22 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate Goldcoast.pdf | 22 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Gold coast Sep22.pdf | 22 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Gold Booking sep22.pdf | 22 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate Goldcoast 1 4 22.pdf | 9 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Gold coast 1 7 22.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Gold coast 1 4 22.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Gold coast 1 7 22.pdf | 9 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Gold cost engg.pdf | 25 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Gold cost Quality.pdf | 25 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Booking Gold Coast.pdf | 25 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gold Coast.pdf | 25 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Gold Coast Quailty 5.pdf | 25 May 2022 |
| Disclosure of sold/ booked inventoryFile: Gold Coast Bookin.pdf | 25 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Goldcost Dec 21.pdf | 17 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gold coast Ar.pdf | 8 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Gold c.pdf | 8 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance GC.pdf | 8 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Booking GC.pdf | 8 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Silveroak Builders And Developers.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: silveroak Goldcost Sep 21.pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: gold coast sep21 booking de.pdf | 8 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Goldcoast.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Goldcoast Engineer's certificate.pdf | 7 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_SOBD_September 2021.pdf | 7 Oct 2021 |
| Declaration about Commencement CertificateFile: SOBD.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality A Platinum ph2 March21.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality A Platinum ph2 June 21.pdf | 14 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOBDGoldcoastForm 3March 2021.pdf | 13 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOBDGoldcoastForm 3June 2021.pdf | 13 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gold coast 2-4-21 4th Quarter.pdf | 9 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gold coast 2-7-21 1st Quarter.pdf | 9 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Goldcoast 1-04-2021 4th quarter.pdf | 9 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Goldcoast 1-07-2021 1st Quarter 21.pdf | 9 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Goldcoast booked.pdf | 9 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ SOBD Registration FINAL.pdf | 6 Feb 2021 |
| Building plan approvalFile: C Building.pdf | 5 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: C Building.pdf | 5 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Form 1 - Gold Coast - 1.pdf | 5 Feb 2021 |
| OtherFile: Bank NOC.pdf | 5 Feb 2021 |
| Layout approvalFile: Gold Cost Antim Layout Permission.pdf | 4 Feb 2021 |
| Details of encumbrancesFile: Encumbrances Details SOBD.pdf | 4 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Gold Cost Antim Layout Permission.pdf | 4 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Gold Coast Bandkam Parvangi.pdf | 4 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SOBD Form 2 Engg Certificate FINAL.pdf | 4 Feb 2021 |
| Proforma of Allotment letterFile: Draft Silveroak Goldcoast - RERA - Final.pdf | 4 Feb 2021 |
| Proforma of Allotment letterFile: Allotment Letter - SOBD.pdf | 4 Feb 2021 |
| OtherFile: NA Order.pdf | 4 Feb 2021 |
| Layout approvalFile: LAYOUT.pdf | 1 Feb 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SILVEROAK GREEN VIEW PH - 1 | SR NO 51 | 75 | Completed | Jun 2011 | Jun 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmednagar
Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SILVEROAK GOLD COAST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR VITTHAL RUKHMINI MANDIR490+ in Ahmednagar
SHREE SAI NIRMAN DREAM CITY
SHREE SAI NIRMAN REALTY
Ranmale Residential
Promoter name not stated in filing
GURUPRASAD RESIDENCY
NARESH SAMPATLAL PARAKH V ITAR
PLATINUM PHASE 2
SILVEROAK BUILDCON PVT. LTD.
SAI GHAR
Suwarnsparsh Infrastructure LLP
SAI HERMITAGE SHIRDI - BY ANANTA BLOCK - 4
HARIHAR INFRAVENTURE (INDIA) PRIVATE LIMIT
See every Ahmednagar project, with the district possession charts
Builder: SILVER OAK BUILDERS AND DEVELOPERS
SILVER OAK BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including SILVEROAK GOLD COAST and Shriyans 3.0. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.
Frequently asked questions
What does it mean that SILVEROAK GOLD COAST shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SILVEROAK GOLD COAST is delayed beyond 23 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVEROAK GOLD COAST?
The registered promoter entity is SILVER OAK BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVEROAK GOLD COAST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SILVEROAK GOLD COAST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVEROAK GOLD COAST?
The professionals named in the filing: Architect: JORI VIKAS ANAND; Architect: VSGS ARCHITECTS AND PLANNERS; Architect: NIKAM PATIL ASSOCIATES; Engineer: SAI CONSULTANTS; Engineer: Satish Gagare; Chartered Accountant: NAMRATA DHRUVE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVEROAK GOLD COAST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback