ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SAI SAVLI

Registration lapsed No litigation declared Others project

SAI SAVLI

By DEEPAK BALKRUSHNA REPALE

RG-MH-17089 · RERA P52100027937 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
2 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 93%
31 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

SAI SAVLI is a Others project by DEEPAK BALKRUSHNA REPALE in Pune, Maharashtra, registered with MahaRERA as P52100027937 on 21 Jan 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 24 months from the original filing. 15 of the 46 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI SAVLI
  • TypeOthers
  • Location
    • NARAYANGAON
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027937
  • ReraGenie IDRG-MH-17089

Builder

  • NameDEEPAK BALKRUSHNA REPALE
  • Entity typeIndividual

Key dates

4 months past promisethis monthRegisteredJan 2021First promiseJun 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Jan 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed99 files

Current status

33%15 of 46 units booked
84.2%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SAVLINA33361046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 93%.

SAI SAVLI: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Sep 2025
LandownerVillageDistrict
MARUTI CHAUDHARINarayangaonPune
SANTOSH WAJAGENarayangaonPune

Approvals and building plan

Sanctioning authorityJunnar-Ambegaon Sub Division Manchar(Pune)
Permissible FSI1854.36
Proposed, not sanctioned1,854 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON DABHADE MAHARASHTRA 410506
Estimated costRs 5.45 cr
Cost incurredRs 4.59 cr
Work done84.17%
BuildingWingEstimatedIncurred
SAI SAVLINARs 5.00 crRs 4.25 cr
-NARs 45.00 lakhRs 33.75 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY VAIDYA
EngineerNILESH GHODEKAR
Chartered AccountantGANESH KOHINKAR
Chartered AccountantRSL AND CO
PartnerRole in project
DEEPAK BALKRUSHNA REPALE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024193Jun 2024 → Dec 2024

Reason as filed by the promoterDue to non-availability of Resources

EA09102518070Jun 2024 → Jun 2026

Reason as filed by the promoterThe progress of the project has been significantly impacted by a series of unforeseen challenges, resulting in delays that have necessitated an extension of the registration period. One of the primary setbacks was due to health-related issues involving key individuals directly associated with the project. In addition to the health setbacks, the project also suffered from a severe shortage of both skilled and unskilled labor during vital construction phases. This situation was further compounded by financial constraints which slowed the project's progress and limited the continuity of essential

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer form.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer form.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer form.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Form.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Form.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Form.pdf8 Jun 2026
Form 2A (FY 2024-2025)File: repale builders 2a (1).pdf9 Oct 2025
Form 5 (FY 2024-2025)File: form 5.pdf9 Oct 2025
Form 1File: form 1 june 25.pdf25 Sep 2025
Form 2File: form 2 June 25.pdf25 Sep 2025
Form 3File: FORM3_Sai Savli_June-2025.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 25.pdf25 Sep 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quaterly Progress SAI SAVLI.pdf25 Sep 2025
Declaration about Commencement CertificateFile: Form D.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5for2021.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form522.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form23.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032021.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122021.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032022.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062022.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092022.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122022.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032023.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1 30062023.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092023.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122023.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1 30062024.pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20-21 form 2.PDF28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21-22 Q3 form 2.PDF28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032022 Q4.pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062022 Q1(22-23).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3092022 Q2(22-23).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122022(Q3 FY22-23).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032023(Q4)( FY 22-23).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062023(Q1) (FY 2023-2024).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092023(Q2) (FY 2023-2024).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122023(Q3)(FY 2023-2024).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032024 (Q4) (FY 2023-2024).pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 30062024 (Q1).pdf28 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-2021.pdf28 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2022.pdf28 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-2023.pdf28 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-2024.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31032021.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31122021.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31122021.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31032022.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 30062022.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 30092022.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31122022.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31032023.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 30062023.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 30092023.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: PDF Scan 31122023.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 310324.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 300624.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS Signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS Signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS Signed Form 3.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS signed Form 3.pdf28 Jul 2024

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SAVLI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARAYANGAON13,700+ in Pune

2 kmSAI SAVLICompleted 6Lapsed / revoked 10Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: DEEPAK BALKRUSHNA REPALE

DEEPAK BALKRUSHNA REPALE has 1 registration on MahaRERA, including SAI SAVLI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SAI SAVLI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI SAVLI is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAVLI?

The registered promoter entity is DEEPAK BALKRUSHNA REPALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAVLI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAVLI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAVLI?

The professionals named in the filing: Architect: AJAY VAIDYA; Engineer: NILESH GHODEKAR; Chartered Accountant: GANESH KOHINKAR; Chartered Accountant: RSL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAVLI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAVLI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAVLI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.