ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / FLORINA RESIDENCY

Registration lapsed No litigation declared Others project

FLORINA RESIDENCY

By DEEPALI BUILDCON

RG-MH-96721 · RERA P52100055419 · Last updated on MahaRERA portal: 25 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
17 of 29Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
32 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

FLORINA RESIDENCY is a Others project by DEEPALI BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100055419 on 22 Mar 2024. Possession was promised by 30 Mar 2026 and is now 7 months past that date. 62 of the 94 units on this registration are recorded sold or booked, and 17 of 29 construction stages are filed complete.

At a glance

Project

  • NameFLORINA RESIDENCY
  • TypeOthers
  • Location
    • -
    • Varulwadi
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055419
  • ReraGenie IDRG-MH-96721

Builder

  • NameDEEPALI BUILDCON
  • Entity typePartnership
  • GSTIN27AAUFD9313P1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSWAPNIL RAMESH JUNNARKAR, PRASHANT SUBHASH GUNJAL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredMar 2024PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Mar 2024
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed48 files

Current status

66%62 of 94 units booked
99.0%Work done, per cost certificate

Figures as on 25 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA6636945
WING BNA6636945
WING CNA11044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 29 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

WING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed270

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots270
Closed/Covered48
Open Space222
BuildingClosed/CoveredOpen SpaceTotal
WING A23108131
WING B23108131
WING C268

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jan 2026
LandownerVillageDistrict
ANIL GHAMAJI MEHERVarulwadiPune
MONIKA ANIL MEHERVarulwadiPune
RUSHIKESH ANIL MEHERVarulwadiPune
RUTUPARNA ANIL MEHERVarulwadiPune
RUJIT ANIL MEHERVarulwadiPune

Approvals and building plan

Sanctioning authoritySUB DIVISIONAL OFFICER JUNNAR AMBEGAON SUBDIVISION MANCHAR PUNE
Permissible FSI10549.63
Proposed, not sanctioned5,550 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE NASHIK HIGHWAY NARAYANGAON, FULSUNDER SUPER MARKET NARAYANGAON TAL JUNNAR DIST PUNE
Estimated costRs 8.50 cr
Cost incurredRs 8.42 cr
Work done99.04%
BuildingWingEstimatedIncurred
WING ANARs 3.50 crRs 3.48 cr
WING BNARs 3.50 crRs 3.47 cr
-NARs 1.00 crRs 98.00 lakh
WING CNARs 49.26 lakhRs 49.26 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL PARASHAR
EngineerANIKET LAXMAN PAWALE
Chartered AccountantAMIR TAMBOLI
PartnerRole in project
DEEPALI BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: C A Form 5 24-24.pdf25 Feb 2026
Form 5 (FY 2024-2025)File: C A Annual Report 24-25 Florina residency.pdf25 Feb 2026
Form 1File: Architects Certificate.pdf2 Jun 2025
Form 2File: Engineering Certificate.pdf2 Jun 2025
Form 3File: Final CA Certificate.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Final sold unsold.pdf2 Jun 2025
Form 1File: Architect certificate (11).pdf26 May 2025
Form 2File: Engineering Certificate.pdf26 May 2025
Form 3File: CA certificate (10)_compressed.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory.pdf26 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate (2).pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (10)_compressed.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Discolsure Of Sold and Booked Inventory.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate (1).pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered accountant Certificate.pdf9 Aug 2024
Proforma of Agreement for saleFile: Final RERA DRAFT Florina 31 07 2024.pdf31 Jul 2024
Proforma of Agreement for saleFile: MARATHI RERA DRAFT Florina - Final Uplod 29072024.pdf29 Jul 2024
Proforma of Agreement for saleFile: MARATHI RERA DRAFT Florina Demo in Shreelipi (1) (2).pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate(3)_compressed.pdf8 Mar 2024
Other - TechnicalFile: Annexure A Declaration cum Undertaking.pdf8 Mar 2024
Copy of the legal title reportFile: G (2) (1)_compressed.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf7 Mar 2024
Proforma of Allotment letterFile: Allotment letter (2).pdf7 Mar 2024
Proforma of Agreement for saleFile: Florina AFS.pdf7 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allot Letter.pdf7 Mar 2024
Deviation Report with respect to model copy of AgreementFile: AFS - Dev Report.pdf7 Mar 2024
Layout approvalFile: TP Plan 1.pdf27 Feb 2024
Building plan approvalFile: TP Plan 2.pdf27 Feb 2024
Building plan approvalFile: TP Plan 3.pdf27 Feb 2024
PAN CardFile: Deepali Buildcon - Pan.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate (1).pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate (1).pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: TP Plan 1.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: TP Plan 2.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: TP Plan 3.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Florina NA order.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Florina CC Verification.pdf27 Feb 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf27 Feb 2024
Declaration in FORM BFile: Notary From-B Promoter.pdf27 Feb 2024
CERSAI detailsFile: Cersai Report (1).pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure Of In Other Real Estate Organizations.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure Of Interest In Other Real Estate Organizations.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration About Separate Bank Account For Real Estate Project.pdf27 Feb 2024

How this compares with Pune

66%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORINA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmFLORINA RESIDENCYCompleted 7Lapsed / revoked 8Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: DEEPALI BUILDCON

DEEPALI BUILDCON has 2 registrations on MahaRERA, including FLORINA RESIDENCY and FLORINA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that FLORINA RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if FLORINA RESIDENCY is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORINA RESIDENCY?

The registered promoter entity is DEEPALI BUILDCON, a partnership as per the filing. Its GSTIN 27AAUFD9313P1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORINA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORINA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORINA RESIDENCY?

The professionals named in the filing: Architect: SWAPNIL PARASHAR; Engineer: ANIKET LAXMAN PAWALE; Chartered Accountant: AMIR TAMBOLI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORINA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORINA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORINA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.