RG-MH-88006 · RERA P52100048512 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 85%
76 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Vizion Bliss is a Residential / Group Housing project by VIZION CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100048512 on 3 Jan 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 36 of the 112 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameVizion Bliss
  • TypeResidential / Group Housing
  • Location
    • Pune Nashik Road
    • Near ST Stand
    • Narayangaon
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048512
  • ReraGenie IDRG-MH-88006

Builder

  • NameVIZION CONSTRUCTION
  • Entity typePartnership
  • GSTIN27AAJFV2433M1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPragati Shankar Pate, Vilas Parasmal Surana
  • Other registrations5 more →
  • Completed4 of 6
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed75 files

Current status

32%36 of 112 units booked
79.8%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIZION BLISS ANA8756056
VIZION BLISS BNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.

VIZION BLISS A53%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VIZION BLISS B40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed284

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots284
Closed/Covered48
Open Space236
BuildingClosed/CoveredOpen SpaceTotal
VIZION BLISS A24118142
VIZION BLISS B24118142

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,000 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 May 2026
LandownerVillageDistrict
Ashok Bansilal GandhiNarayangaonPune
Nirmala Chandrakant GandhiNarayangaonPune
Sachin Chandrakant GandhiNarayangaonPune
Suhas Chandrakant GandhiNarayangaonPune
Atul Vallabh BenkeNarayangaonPune
Amit Vallabh BenkeNarayangaonPune
Amol Vallabh BenkeNarayangaonPune
Vijay Barku GhogareNarayangaonPune

Approvals and building plan

Sanctioning authorityTown Planning
Permissible FSI7654.0
Proposed, not sanctioned7,654 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch692/2A Pune Satara road
Estimated costRs 22.03 cr
Cost incurredRs 17.58 cr
Work done79.79%
BuildingWingEstimatedIncurred
VIZION BLISS ANARs 11.01 crRs 9.51 cr
VIZION BLISS BNARs 11.01 crRs 8.07 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAkshata Galande Pate
EngineerRoshan Pate
Chartered AccountantSanjay P Kaswa
Chartered AccountantSANJAY KASWA
PartnerRole in project
VIZION CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25112518431Dec 2025 → Jun 2026

Reason as filed by the promoterThe construction work was delayed due to continuous heavy rainfall, which caused waterlogging and high moisture levels at the site. Essential activities such as RCC, masonry, plastering, waterproofing, and finishing work could not be carried out since they require dry weather for proper curing and quality. Labour operations and material deliveries were also disrupted. These weather conditions were beyond our control and directly impacted the project timeline.

EA10072621718Dec 2025 → Dec 2026

Reason as filed by the promoterThe project experienced a 2-month delay in completion due to force majeure supply chain disruptions. Ongoing geopolitical conflicts and war conditions led to a severe global natural gas shortage. This directly caused an acute energy crisis and subsequent mass shutdown of tile manufacturing factories in Morbi, Gujarat, the primary sourcing hub for our project's finishing materials. The complete unavailability of tiles during this 2-month factory closure halted internal flooring and finishing works, impacting the overall construction timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT FORM 1 QPR1 2627.pdf10 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 QPR1 2627.pdf10 Jul 2026
Withdrawal Update Form 3File: CA FORM 3 QPR1 2627.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A QPR1 2627.pdf10 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 2526.pdf10 Jul 2026
Building plan approvalFile: A Bldg Sanction plan with Highlight.pdf22 Jun 2026
Building plan approvalFile: B Bldg Sanction plan with Highlight.pdf22 Jun 2026
Withdrawal Update Form 1File: Architect Form 1 QPR 4 Bliss.pdf16 May 2026
Withdrawal Update Form 2File: Engineer Form 2 QPR 4 Bliss.pdf16 May 2026
Withdrawal Update Form 3File: CA Form 3 QPR 4 Bliss.pdf16 May 2026
Withdrawal Update Form 1File: Architect Certificate Q3.pdf17 Feb 2026
Withdrawal Update Form 1File: Withdrawal Form 1 Q3.pdf17 Feb 2026
Withdrawal Update Form 1File: Withdrawal Form 1 Q3.pdf17 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Q3.pdf17 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Q3.pdf17 Feb 2026
Withdrawal Update Form 2File: Withdrawal Form 2 Q3.pdf17 Feb 2026
Withdrawal Update Form 3File: CA Form 3 Cert Q3.pdf17 Feb 2026
Withdrawal Update Form 3File: Withdrawal Form 3 Q3.pdf17 Feb 2026
Withdrawal Update Form 3File: Withdrawal Form 3 Q3.pdf17 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Q3.pdf22 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q3.pdf22 Dec 2025
Withdrawal Update Form 3File: CA Form 3 Cert Q3.pdf22 Dec 2025
Withdrawal Update Form 1File: Architect Certificate Q3.pdf20 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q3.pdf20 Dec 2025
Withdrawal Update Form 3File: CA Form 3 Cert Q3.pdf20 Dec 2025
Withdrawal Update Form 1File: Withdrawal Vizion Bliss.pdf19 Nov 2025
Withdrawal Update Form 1File: Withdrawal Vizion Bliss.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer 3132023.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer 3132023.pdf19 Nov 2025
Withdrawal Update Form 3File: CA FORM 3 .pdf19 Nov 2025
Withdrawal Update Form 3File: CA FORM 3 .pdf19 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects letter Form 1.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIZION BLISS CA FORM 3.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's letter Form 2.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: VIZION BLISS FORM 5.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects letter Form 1.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Form 2.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 232424062024.pdf24 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 232424062024.pdf24 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: bliss form 5 22 2313032024.pdf13 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: bliss form 5 22 2313032024.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: compressed bliss Plan 1 2332023.pdf20 May 2023
Building Plan Approval / NA Order for plotted developmentFile: compressed Bliss Plan 2 2332023.pdf20 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Bliss NA 2332023.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect 3132023.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer 3132023.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA 3132023.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIZION BLISS FORM 3.pdf15 Dec 2022
Proforma of Agreement for saleFile: ---REVISED MASTER DRAFT- VIZION BLISS.pdf24 Nov 2022
Copy of the legal title reportFile: vision format A .pdf21 Nov 2022
Copy of the legal title reportFile: BLISS SEARCH REPORT08112022_compressed (2).pdf19 Nov 2022
Details of encumbrances concerned to FinanceFile: self declaration19112022.pdf19 Nov 2022
Details of encumbrances concerned to LegalFile: self declaration19112022.pdf19 Nov 2022
Declaration in FORM BFile: form B 19112022.pdf19 Nov 2022
Declaration in FORM BFile: form B owner declaration19112022.pdf19 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_.pdf19 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A seperate bank account19112022.pdf19 Nov 2022
Deviation Report with respect to model copy of AgreementFile: deviation report revised.pdf19 Nov 2022
Other - LegalFile: Scan SEARCH REPORT-compressed-1 new (1).pdf8 Nov 2022
Details of encumbrances concerned to FinanceFile: encumberance 07112022.pdf7 Nov 2022
Details of encumbrances concerned to LegalFile: encumberance 07112022.pdf7 Nov 2022
Proforma of Allotment letterFile: DRAFT OF ALLOTMENT LETTER07112022.pdf7 Nov 2022
Deviation Report with respect to Allotment letterFile: DV REPORT ALLOTMENT LETTER07112022.pdf7 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 ARCHITECT02112022.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 ENGINEER29102022.pdf31 Oct 2022
Layout approvalFile: COMPRESSED A BUILDING.pdf29 Oct 2022
Building plan approvalFile: COMPRESSED A BUILDING.pdf29 Oct 2022
Building plan approvalFile: COMPRESSED B BUILDING.pdf29 Oct 2022
PAN CardFile: VIZION PAN06082020.pdf29 Oct 2022
Copy of Layout Approval (in case of layout)File: COMPRESSED A BUILDING.pdf29 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: COMPRESSED A BUILDING.pdf29 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: COMPRESSED B BUILDING.pdf29 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: NA BLISS26102022.pdf29 Oct 2022
Declaration about Commencement CertificateFile: DECLARATION FORMAT D29102022.pdf29 Oct 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ANAND PLAZAS no 420-1-2 to 5 Alephata Tal Junnar Dist Pune3CompletedDec 2016Late, Mar 2017
SHIVAIS no 13-1 Narayangaon Warulwadi Tal Junnar Dist Pune2CompletedDec 2013Late, Feb 2014

How this compares with Pune

32%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vizion Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near ST Stand13,700+ in Pune

2 kmVizion BlissCompleted 7Lapsed / revoked 10Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: VIZION CONSTRUCTION

VIZION CONSTRUCTION has 6 registrations on MahaRERA, including Vizion Galaxy B and Vizion Galaxy A. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vizion Bliss is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vizion Bliss?

The registered promoter entity is VIZION CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AAJFV2433M1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vizion Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vizion Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vizion Bliss?

The professionals named in the filing: Architect: Akshata Galande Pate; Engineer: Roshan Pate; Chartered Accountant: Sanjay P Kaswa; Chartered Accountant: SANJAY KASWA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vizion Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vizion Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vizion Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.