Home / Browse projects / Pune, Maharashtra / Vaishnavi Vastu A and B

Registered No litigation declared Residential / Group Housing project

Vaishnavi Vastu A and B

By VAISHNAVI PROMOTERS AND DEVELOPERS

RG-MH-55092 · RERA P52100056342 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
15 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
79 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Vaishnavi Vastu A and B is a Residential / Group Housing project by VAISHNAVI PROMOTERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100056342 on 29 May 2024. Possession is promised by 31 Dec 2027. 19 of the 98 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.

At a glance

Project

  • NameVaishnavi Vastu A and B
  • TypeResidential / Group Housing
  • Location
    • Varulwadi
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056342
  • ReraGenie IDRG-MH-55092

Builder

  • NameVAISHNAVI PROMOTERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSANDEEP VITTHAL KATE, SANTOSH VITTHAL KATE
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

19%19 of 98 units booked
99.0%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA88281442
B WingNA7756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

A Wing81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B Wing81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes5%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
A Wing156
B Wing055

Land and ownership45

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners45
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025
LandownerVillageDistrict
Dinkar Haribhau ShindeVarulwadiPune
Sharda Dinkar ShindeNarayangaonPune
Anil Dinkar ShindeVarulwadiPune
Ashok Dinakar ShindeVarulwadiPune
Atul DInkar ShindeNarayangaonPune
Kantadevi Sudhakar ShindeNarayangaonPune
Mandakini Sharad ShindeVarulwadiPune
Madhukar Haribhau ShindeVarulwadiPune
Sushila Madhukar ShindeVarulwadiPune
Sangita Madhukar ShindeVarulwadiPune
Prabhakar Haribhau ShindeVarulwadiPune
Surekha Prabhakar ShindeNarayangaonPune
Mangesh Prabhakar ShindeVarulwadiPune
Gauri Prabhakar ShindeVarulwadiPune
Babanrao Dattatray MeherVarulwadiPune
Minakshi Babanrao MeherVarulwadiPune
Pritam Babanrao MeherVarulwadiPune
Poonam Babanrao MeherNarayangaonPune
Shital Babanrao MeherVarulwadiPune
Baburao Dattatray MeherVarulwadiPune
Sunita Baburao MeherNarayangaonPune
Rupesh Babaurao MeherVarulwadiPune
Rupali Baburao MeherVarulwadiPune
Rekha Bhanudas MeherVarulwadiPune
Sitabai Rakhamaji MeherVarulwadiPune
Kishor Rakhmaji MeherVarulwadiPune
Megha Kishor MeherNarayangaonPune
Namdev Bhaguji MeherVarulwadiPune
Surekha Namdev MeherVarulwadiPune
Yogesh Namdev MeherVarulwadiPune
Mangal Namdev MeherVarulwadiPune
Taibai Bhaguji MeherVarulwadiPune
Bhamabai Baburao MeherVarulwadiPune
Vikas Vilas Bhalgat proprietor of Kuber propertiesVarulwadiPune
Arvind Krishnaji MeherVarulwadiPune
Anita Arvind MeherVarulwadiPune
Parag Arvind MeherVarulwadiPune
Amrita Parag MeherVarulwadiPune
Sharad Sudhakar ShindeVarulwadiPune
Ratnamala Sudhakar ShindeVarulwadiPune
Nayana Sudhakar ShindeVarulwadiPune
Santosh Madhukar ShindeVarulwadiPune
Sandeep Madhukar ShindeVarulwadiPune
Kalpana Madhukar ShindeVarulwadiPune
Shubham Bhanudas MeherVarulwadiPune

Approvals and building plan

Sanctioning authorityJunnar Ambegaon SDO
Permissible FSI4925.42
Proposed, not sanctioned4,924 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 10 /213 Jachak Chambers Near Sai Vaibhav Pimplesaudgar Pune 411027
Estimated costRs 15.91 cr
Cost incurredRs 15.75 cr
Work done99.0%
BuildingWingEstimatedIncurred
A WingNARs 7.85 crRs 7.78 cr
B WingNARs 7.85 crRs 7.78 cr
-NARs 20.48 lakhRs 20.10 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Panchal and Associates
EngineerAardhya Engineers
Chartered AccountantMahavir Parakh and Co
Chartered AccountantVaibhav Bhise and Associates
PartnerRole in project
VAISHNAVI PROMOTERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1.pdf14 May 2026
Withdrawal Update Form 1File: FORM1.pdf14 May 2026
Withdrawal Update Form 2File: FORM2.pdf14 May 2026
Withdrawal Update Form 2File: FORM2.pdf14 May 2026
Withdrawal Update Form 3File: FORM3 CA CERTIFICATE.pdf14 May 2026
Withdrawal Update Form 3File: FORM3 CA CERTIFICATE.pdf14 May 2026
Withdrawal Update Form 1File: FORM 1-Milinda panchal Associates.pdf3 Feb 2026
Withdrawal Update Form 2File: FORM 2-Aaradhya.pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3-CA certificate o.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: FORM 2A-Aaradhya engineer ce.pdf3 Feb 2026
Withdrawal Update Form 1File: Arch Cert.pdf5 Jan 2026
Withdrawal Update Form 2File: form 2 wastu.pdf5 Jan 2026
Withdrawal Update Form 3File: Form 3 - June 2025.pdf5 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Vaishnavi Vastu A & B.pdf11 Dec 2025
Withdrawal Update Form 1File: FORM 1Updated.pdf21 Nov 2025
Withdrawal Update Form 2File: form 2 wastu.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 - June 2025.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 - June 2025.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2 - June 2025.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 - June 2025.pdf21 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- Dec 24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Dec 24.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Sep 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sep 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sep 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- June 24.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- June 24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- June 24.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2024compressed.pdf21 May 2024
Copy of the legal title reportFile: Format A Legal search VD 2504.pdf25 Apr 2024
Copy of the legal title reportFile: 2mb Legal search report 2404compressed.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: nilesh.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: sandee.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: santosh.pdf27 Feb 2024
Layout approvalFile: 1 Copy of Layout Approval in case of layoutompressed.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: QEncumbrances letter Finance V.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: QEncumbrances letter Finance V.pdf9 Feb 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval in case of layoutompressed.pdf9 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth checking certificate.pdf9 Feb 2024
Other - LegalFile: VAISHNAVI PARTNERSHIP DEED.pdf9 Feb 2024
Other - TechnicalFile: V A B Annex.pdf9 Feb 2024
Other - TechnicalFile: EMAIL VAI.pdf9 Feb 2024
Declaration about Commencement CertificateFile: 5Declaration about commencement certificate.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects certificatecompressed.pdf24 Jan 2024
Proforma of Agreement for saleFile: Model agreement to sale.pdf24 Jan 2024
Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf24 Jan 2024
Building plan approvalFile: 2 NARAYANGAON NEW PLAN TWOcompressed.pdf23 Jan 2024
Building plan approvalFile: 3 PLAN 03 NARAYANGAON 3compressed.pdf23 Jan 2024
Building plan approvalFile: 4.pdf23 Jan 2024
Building plan approvalFile: 5.pdf23 Jan 2024
Building plan approvalFile: 6.pdf23 Jan 2024
Building plan approvalFile: 7.pdf23 Jan 2024
PAN CardFile: Pan card VAISHNAVI PROMOTERS DEVELOPERS.pdf23 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrances letter legalrotated.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances letter legalrotated.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 NARAYANGAON NEW PLAN TWOcompressed.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 PLAN 03 NARAYANGAON 3compressed.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NARAYANGAON NEW NA COMMNECEMENT.pdf23 Jan 2024
Declaration in FORM BFile: Form B Builder_compressed.pdf23 Jan 2024
CERSAI detailsFile: CERSAI report.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank letter.pdf23 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation allotment letter_rotated.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation agreement letter.pdf23 Jan 2024

How this compares with Pune

19%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vaishnavi Vastu A and B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Varulwadi13,700+ in Pune

2 kmVaishnavi Vastu A and BCompleted 7Lapsed / revoked 9Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: VAISHNAVI PROMOTERS AND DEVELOPERS

VAISHNAVI PROMOTERS AND DEVELOPERS has 10 registrations on MahaRERA, including SAHIL VIGHNESH RESIDENCY and SAHIL HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vaishnavi Vastu A and B is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vaishnavi Vastu A and B?

The registered promoter entity is VAISHNAVI PROMOTERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vaishnavi Vastu A and B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vaishnavi Vastu A and B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vaishnavi Vastu A and B?

The professionals named in the filing: Architect: Milind Panchal and Associates; Engineer: Aardhya Engineers; Chartered Accountant: Mahavir Parakh and Co; Chartered Accountant: Vaibhav Bhise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vaishnavi Vastu A and B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vaishnavi Vastu A and B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vaishnavi Vastu A and B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.