Sai Sanskruti

By ANIL SHANKAR AHER

RG-MH-15006 · RERA P51600033681 · Last updated on MahaRERA portal: 16 Aug 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 11 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
66 of 66Construction stages doneacross 6 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Sai Sanskruti is a Others project by ANIL SHANKAR AHER in Nashik, Maharashtra, registered with MahaRERA as P51600033681 on 2 Mar 2022. The registration is recorded completed; possession was promised by 10 Oct 2025. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameSai Sanskruti
  • TypeOthers
  • Location
    • Gangapur Road
    • Nashik
    • Near Motiwala College
    • Dhruv Nagar
    • Gangapur Road
    • Nashik
    • Nashik (M Corp.)
    • Nashik
    • 422012
  • Pincode422012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600033681
  • ReraGenie IDRG-MH-15006

Builder

  • NameANIL SHANKAR AHER
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed4 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredMar 2022First promiseApr 2025Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Mar 2022
  • Promised completion10 Oct 2025
  • Revised completionRevised to 10 Oct 2025 (originally 10 Apr 2025)
  • Buildings6 building records
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai Sanskruti Wing A1NA110000
Sai Sanskruti Wing A2NA110000
Sai Sanskruti Wing A3NA110000
Sai Sanskruti Wing B1NA110000
Sai Sanskruti Wing B2NA110000
Sai Sanskruti Wing B3NA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 16 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 66 construction stages are filed complete across 6 buildings.

Sai Sanskruti Wing A1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Sanskruti Wing A2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Sanskruti Wing A3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Sanskruti Wing B1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Sanskruti Wing B2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Sanskruti Wing B3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered134
BuildingClosed/CoveredTotal
Sai Sanskruti Wing A12222
Sai Sanskruti Wing A22222
Sai Sanskruti Wing A32222
Sai Sanskruti Wing B12323
Sai Sanskruti Wing B22323
Sai Sanskruti Wing B32222

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025
LandownerVillageDistrict
Vinay Dattatray BirariNashik (M Corp.)Nashik
Deepali Vinay BirariNashik (M Corp.)Nashik
Sanjay Walchand KokaneNashik (M Corp.)Nashik
Rajendra Madhukar KothawadeNashik (M Corp.)Nashik
Rajendra Madhukar Kothawade HUFNashik (M Corp.)Nashik
Rupali Rajendra KothawadeNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityANIL SHANKAR AHER
Permissible FSI11217.47
Proposed, not sanctioned11,217 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Kulkarni Garden Sharanpur Road Nashik

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay K Sanap
EngineerAnil C Kadbhane
Chartered AccountantParesh Sabadra
PartnerRole in project
ANIL SHANKAR AHER-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600028403Apr 2025 → Oct 2025

Reason as filed by the promoter1) The excavation work took more than expected as there was hard rock and we were forced to do manual work along with small machines with due care in such a way that there should not be vibrations in the residential area around the site which takes considerably more time than the conventional methods. 2) While excavation and lowering of water level we were supposed to take care since the project land is already surrounded by residential premises and therefore this activity went slowly and took time. 3) The area is which project is to be constructed and completed is entirely a residential area,

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Sai Sanskruti Completion Certificate.pdf16 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A F Y 23-24-Sai Sanskruti.pdf25 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate Bank Account Declaration.pdf18 Jul 2025
Other - TechnicalFile: Form 2A-Quality Assurance Certificate- FY23-24.pdf18 Jul 2025
Other - TechnicalFile: Form 2A-Quality Assurance Certificate- FY24-25.pdf18 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: JUN 23.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: Sept 23.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: DEC 23.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: MARCH 24.pdf5 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 May 2025
Declaration in FORM BFile: Form B- (1).pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec-24.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-March-25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Dec-24.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-March-25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-March-25.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti_compressed.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Sai Sanskruti.pdf14 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti_compressed.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Sept -24.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Sept 24Sai Sanskruti-New.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate ( SS ) - Sept-24.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure- Sai Sanskruti.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti - converted.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecth Certificate June-24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June-24.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June-24 Signed Copy.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Mar 24 Final.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar-24 Final.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar 24.pdf17 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Sai Sanskruti.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti_compressed.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Dec-23.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec-23.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec-23- final.pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_22-23_Sai sanskruti sign copy received.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Sept-23_compressed.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Sept -23_compressed.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept 23_compressed.pdf4 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti (1).pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate (form-1).pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (form-2).pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar'23_Signed.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Perfect Buildcon-1.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Mar-23.pdf1 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 June-23.pdf1 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Mar-23.pdf1 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 June-23.pdf1 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Sai Sanskruti_March 23_signed.pdf1 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Sai Sanskruti_June 23_signed.pdf1 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf25 Apr 2023
Other - TechnicalFile: Quality Assurance Certificate Form 2A- MH - Sai Sanskruti.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Sanskruti DEC22.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Sanskruti JUN22.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Sanskruti MAR22.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Sanskruti SEP22.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Sanskruti DEC22.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Sanskruti JUN22.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Sanskruti MAR22.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Sanskruti SEP22.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Sanskruti_31 03 2022.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_30 09 2022.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_31 12 2022.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit 21-22.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Sai Sanskruti (1).pdf9 Jan 2023
Building plan approvalFile: Building Plan 1.pdf16 Feb 2022
Building plan approvalFile: Building Plan 2.pdf16 Feb 2022
Building plan approvalFile: Building Plan 3.pdf16 Feb 2022
Building plan approvalFile: Building Plan 4.pdf16 Feb 2022
Building plan approvalFile: Building Plan 5.pdf16 Feb 2022
Building plan approvalFile: Building Plan 6.pdf16 Feb 2022
Building plan approvalFile: Building Plan 7.pdf16 Feb 2022
Building plan approvalFile: Building Plan 8.pdf16 Feb 2022
Building plan approvalFile: Building Plan 9.pdf16 Feb 2022
Layout approvalFile: Building Plan 1.pdf16 Feb 2022
Layout approvalFile: Building Plan 2.pdf16 Feb 2022
Layout approvalFile: Building Plan 3.pdf16 Feb 2022

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAI YASHP51600021903HANUMANWADI, Nashik-Aug 2019CompletedDec 2022Oct 2020
SAI SHAP51600007241OPP PARKSIDE RESIDENCE, INDIRA NAGAR, PATHARDI ROAD, Nashik-Aug 2017CompletedOct 2022May 2019
SAI MEGHDOOTP51600013390HANUMANWADI, Nashik-Oct 2017CompletedOct 2022Mar 2019
NA0--CompletedAug 2019Aug 2019
Sai EmbassyGangapur Naka Makhamalabad Road Link Road Bhavbandhan Karyalay Hanumanwadi Panchavati Nashik24-CompletedJan 2018Jul 2017
SAI GREEN MINDBeside Dream City Near Poddar International School Dwarka Nashik Pune Highway Nashik20-CompletedJan 2018Jul 2017
SAI KALASHEH NAGAR BAJARANG SOCY INDIRA NAGAR NASHIK11-CompletedFeb 2014Feb 2014
SAI DATTAHANUMANWADI PANCHAVATI NASHIK17-CompletedJan 2013Jan 2013
SAI SRUSHTISAI SHIV NAGAR NEAR RASBIHARI SCHOOL MERI LINK ROAD NASHIK24-CompletedApr 2012Apr 2012
SAI SHILPPROFESSOR COLONY NEAR RACCAS LAWNS MAKHAMALABAD ROAD PANCHAVATI NASHIK20-CompletedApr 2012Apr 2012
SAI KRISHNANEAR IRRIGATION COLONY OPP UMANG HOTEL MAKHAMALABAD ROAD NASHIK9-CompletedMar 2012Mar 2012

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Sanskruti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Motiwala College, Dhruv Nagar, Gangapur Road, Nashik4,100+ in Nashik

2 kmSai SanskrutiCompleted 34Lapsed / revoked 11Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: ANIL SHANKAR AHER

ANIL SHANKAR AHER has 5 registrations on MahaRERA, including SAI MEGHDOOT and SAI SHA. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Sai Sanskruti is delayed beyond 10 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Sanskruti?

The registered promoter entity is ANIL SHANKAR AHER, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Sanskruti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Sanskruti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Sanskruti?

The professionals named in the filing: Architect: Vijay K Sanap; Engineer: Anil C Kadbhane; Chartered Accountant: Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Sanskruti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Sanskruti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Sanskruti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.