ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Brahmgiri Park-2

Registered No litigation declared Mixed project

Brahmgiri Park-2

By SHREEVASTU BUILDCON

RG-MH-83271 · RERA PM1220002501162 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
265 of 831Construction stages doneacross 92 buildings; furthest along: Internal walls, 70%
42 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 13 documents Report an error

Brahmgiri Park-2 is a Mixed project by SHREEVASTU BUILDCON in Nashik, Maharashtra, registered with MahaRERA as PM1220002501162 on 9 Oct 2025. Possession is promised by 31 Mar 2028. 61 of the 103 units on this registration are recorded sold or booked, and 265 of 831 construction stages are filed complete.

At a glance

Project

  • NameBrahmgiri Park-2
  • TypeMixed
  • Location
    • pimpalgaon bahula shiwar
    • Nashik
    • Satpur
    • 422012
  • Pincode422012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1220002501162
  • ReraGenie IDRG-MH-83271

Builder

  • NameSHREEVASTU BUILDCON
  • Entity typePartnership
  • GSTIN27AFBFS8502B1ZA
  • PartnersSHAILA SUBHASH MATE, DIPAK BHIKAN DHADIWAL
  • PartnerADITYA DHANIRAM MEHARBAN
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Oct 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings92 building records
  • Documents filed13 files

Current status

59%61 of 103 units booked
41.8%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIT NO 1NA11101
UNIT NO 2NA11101
UNIT NO 3NA11101
UNIT NO 4NA11101
UNIT NO 5NA11101
UNIT NO 6NA11101
UNIT NO 7NA11101
UNIT NO 8NA11101
UNIT NO 9NA11101
UNIT NO 10NA11101
UNIT NO 11NA11101
UNIT NO 12NA11101
UNIT NO 13NA11101
UNIT NO 14NA11101
UNIT NO 15NA11101
UNIT NO 16NA11101
UNIT NO 17NA11101
UNIT NO 18NA11101
UNIT NO 19NA11101
UNIT NO 20NA11101
UNIT NO 21NA11101
UNIT NO 22NA11101
UNIT NO 23NA11101
UNIT NO 24NA11101
UNIT NO 25NA11101
UNIT NO 26NA11101
UNIT NO 27NA11101
UNIT NO 28NA11101
UNIT NO 29NA11101
UNIT NO 30NA11101
UNIT NO 31NA11101
UNIT NO 32NA11101
UNIT NO 33NA11101
UNIT NO 34NA11101
UNIT NO 35NA11101
UNIT NO 36NA11101
UNIT NO 37NA11101
UNIT NO 38NA11101
UNIT NO 39NA11101
UNIT NO 40NA11101
UNIT NO 41NA11101
UNIT NO 42NA11101
UNIT NO 43NA11101
UNIT NO 44NA11101
UNIT NO 45NA11101
UNIT NO 46NA11101
UNIT NO 47NA11101
UNIT NO 48NA11101
UNIT NO 49NA11101
UNIT NO 50NA11101
UNIT NO 51NA11101
UNIT NO 52NA11101
UNIT NO 53NA11101
UNIT NO 54NA11101
UNIT NO 55NA11101
UNIT NO 56NA11101
UNIT NO 57NA11101
UNIT NO 58NA11101
UNIT NO 59NA11101
UNIT NO 60NA11101
UNIT NO 61NA11101
UNIT NO 62NA11101
UNIT NO 63NA11101
UNIT NO 64NA11101
UNIT NO 65NA11101
UNIT NO 66NA11101
UNIT NO 67NA11101
UNIT NO 68NA11101
UNIT NO 69NA11101
UNIT NO 70NA11101
UNIT NO 71NA11101
UNIT NO 72NA11101
UNIT NO 73NA11101
UNIT NO 74NA11101
UNIT NO 75NA11101
UNIT NO 76NA11101
UNIT NO 77NA11101
UNIT NO 78NA11101
UNIT NO 79NA11101
UNIT NO 80NA11101
UNIT NO 81NA11101
UNIT NO 82NA11101
UNIT NO 83NA11101
UNIT NO 84NA11101
UNIT NO 85NA11101
UNIT NO 86NA11101
UNIT NO 87NA11101
UNIT NO 88NA11101
UNIT NO 89NA11101
UNIT NO 90NA11101
UNIT NO 91NA11101
Amenity BuildingNA1101212

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 92 buildings; the table lists the first 20.

265 of 831 construction stages are filed complete across 92 buildings. The stage furthest along is Internal walls, at 70%.

UNIT NO 149%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 249%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 349%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 449%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 549%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 657%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 749%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 849%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 957%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1057%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1157%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1257%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1353%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1457%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1553%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1657%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1757%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1857%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 1957%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT NO 2053%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo70%
Sewerage (Chamber, Lines, Septic Tank , STP)No70%
Storm Water DrainsNo70%
Landscaping & Tree PlantingNo20%
Street LightingNo50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Open Space113
BuildingOpen SpaceTotal
UNIT NO 122
UNIT NO 211
UNIT NO 311
UNIT NO 411
UNIT NO 511
UNIT NO 611
UNIT NO 711
UNIT NO 811
UNIT NO 911
UNIT NO 1011
UNIT NO 1111
UNIT NO 1211
UNIT NO 1311
UNIT NO 1411
UNIT NO 1511
UNIT NO 1611
UNIT NO 1711
UNIT NO 1811
UNIT NO 1911
UNIT NO 2011
UNIT NO 2111
UNIT NO 2211
UNIT NO 2311
UNIT NO 2411
UNIT NO 2511
UNIT NO 2611
UNIT NO 2711
UNIT NO 2811
UNIT NO 2911
UNIT NO 3011
UNIT NO 3111
UNIT NO 3211
UNIT NO 3311
UNIT NO 3411
UNIT NO 3511
UNIT NO 3611
UNIT NO 3711
UNIT NO 3811
UNIT NO 3911
UNIT NO 4011
UNIT NO 4111
UNIT NO 4211
UNIT NO 4311
UNIT NO 4411
UNIT NO 4511
UNIT NO 4611
UNIT NO 4711
UNIT NO 4811
UNIT NO 4911
UNIT NO 5011
UNIT NO 5111
UNIT NO 5211
UNIT NO 5311
UNIT NO 5411
UNIT NO 5511
UNIT NO 5611
UNIT NO 5711
UNIT NO 5811
UNIT NO 5911
UNIT NO 6011
UNIT NO 6111
UNIT NO 6211
UNIT NO 6311
UNIT NO 6411
UNIT NO 6511
UNIT NO 6611
UNIT NO 6711
UNIT NO 6811
UNIT NO 6911
UNIT NO 7011
UNIT NO 7111
UNIT NO 7211
UNIT NO 7311
UNIT NO 7411
UNIT NO 7511
UNIT NO 7611
UNIT NO 7711
UNIT NO 7811
UNIT NO 7911
UNIT NO 8011
UNIT NO 8111
UNIT NO 8211
UNIT NO 8311
UNIT NO 8411
UNIT NO 8511
UNIT NO 8611
UNIT NO 8711
UNIT NO 8811
UNIT NO 8911
UNIT NO 9011
UNIT NO 9111
Amenity Building2121

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,625 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Sep 2025

Approvals and building plan

Sanctioning authorityNashik municipal Corporation
Permissible FSI8000.0
Proposed, not sanctioned2,837 sq m
Buildings approved103
Buildings sanctioned92

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD FLR ASMITA BUSINES CENTER PLOTNO19 GATNO 488 BHD PAPAYA NURS SATPUR CLY NASHIK MAHARSHTRA 422007
Estimated costRs 6.18 cr
Cost incurredRs 2.58 cr
Work done41.79%
BuildingWingEstimatedIncurred
Amenity BuildingNARs 76.00 lakhRs 13.26 lakh
-NARs 27.00 lakh-
UNIT NO 91NARs 12.14 lakhRs 2.86 lakh
UNIT NO 85NARs 12.14 lakhRs 2.86 lakh
UNIT NO 86NARs 12.14 lakhRs 2.86 lakh
UNIT NO 87NARs 12.14 lakhRs 2.86 lakh
UNIT NO 88NARs 12.14 lakhRs 2.86 lakh
UNIT NO 89NARs 12.14 lakhRs 2.86 lakh
UNIT NO 90NARs 12.14 lakhRs 2.86 lakh
UNIT NO 1NARs 5.69 lakhRs 4.03 lakh
UNIT NO 2NARs 5.69 lakhRs 4.03 lakh
UNIT NO 3NARs 5.69 lakhRs 4.03 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH PRABHAKAR Jadhav
EngineerVIJAY B AMESUR
Chartered AccountantHARSHA KIRTIKUMAR JAIN
Chartered AccountantS Bramhecha & company
PartnerRole in project
SHREEVASTU BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed13

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 arcttict certifacte-park-2 -Final.pdf15 Jul 2026
Withdrawal Update Form 2File: ENGEENEAR CERTIFICATE -Park-2 -Final.pdf15 Jul 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICAT -Park-2 -Final.pdf15 Jul 2026
Form 2A (FY 2025-2026)File: form 2a park 2.pdf4 May 2026
Withdrawal Update Form 1File: form 1 park 2.pdf30 Apr 2026
Withdrawal Update Form 2File: form 2 park 2.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE-Jan-mar-26-park-2.pdf30 Apr 2026
Withdrawal Update Form 1File: Form-1 -arctict-park-2-oct-dec-25.pdf3 Feb 2026
Withdrawal Update Form 2File: ENGEENEAR CERTIFICATE Form-2 Sep-dec-25.pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICAT 02-01-2026 (1).pdf3 Feb 2026
Declaration and undertaking (Annexure A)File: declaration cum undertaking -Order-50.pdf19 Sep 2025
Building plan approvalFile: 182-2-2 commencement certificate.pdf13 Sep 2025
Layout approvalFile: 182-2-2 LAYOUT-merged_compressed.pdf10 Sep 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
BRAHMGIRI PARKP51600055245SATPUR, Nashik106Mar 2024OngoingDec 2028Not due yet

How this compares with Nashik

59%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Brahmgiri Park-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmBrahmgiri Park-2Completed 27Lapsed / revoked 10Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: SHREEVASTU BUILDCON

SHREEVASTU BUILDCON has 2 registrations on MahaRERA, including BRAHMGIRI PARK and Brahmgiri Park-2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Brahmgiri Park-2 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Brahmgiri Park-2?

The registered promoter entity is SHREEVASTU BUILDCON, a partnership as per the filing. Its GSTIN 27AFBFS8502B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Brahmgiri Park-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Brahmgiri Park-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Brahmgiri Park-2?

The professionals named in the filing: Architect: MANISH PRABHAKAR Jadhav; Engineer: VIJAY B AMESUR; Chartered Accountant: HARSHA KIRTIKUMAR JAIN; Chartered Accountant: S Bramhecha & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brahmgiri Park-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brahmgiri Park-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brahmgiri Park-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.