BRAHMGIRI PARK
RG-MH-57574 · RERA P51600055245 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BRAHMGIRI PARK is a Residential / Group Housing project by SHREEVASTU BUILDCON in Nashik, Maharashtra, registered with MahaRERA as P51600055245 on 14 Mar 2024. Possession is promised by 31 Dec 2028. 79 of the 106 units on this registration are recorded sold or booked, and 846 of 859 construction stages are filed complete.
At a glance
Project
- NameBRAHMGIRI PARK
- TypeResidential / Group Housing
- Location
- PIMPALGAON BAHULA
- SATPUR
- Nashik
- 422012
- Pincode422012
- RERA no.P51600055245
- ReraGenie IDRG-MH-57574
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Mar 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings95 building records
- Documents filed89 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UNIT NO 1 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 2 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 3 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 4 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 5 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 6 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 7 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 8 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 9 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 10 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 11 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 12 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 13 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 14 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 15 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 16 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 17 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 18 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO-19 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO-20 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO-21 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 22 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 23 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 24 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 25 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 26 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 27 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 28 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 29 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 30 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 31 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 32 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 33 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO-34 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 35 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 36 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 37 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 38 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 39 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 40 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 41 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 42 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 43 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 44 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 45 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 46 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 47 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 48 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 49 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 50 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 51 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 52 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 53 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 54 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 55 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 56 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 57 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 58 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 59 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 60 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 61 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 62 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 63 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 64 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 65 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 66 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 67 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 68 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 69 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 70 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 71 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 72 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 73 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 74 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 75 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 76 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 77 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 78 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 79 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 80 | NA | 2 | 2 | 1 | 0 | 1 |
| UNIT NO 81 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 82 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 83 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 84 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 85 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 86 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 87 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 88 | NA | 2 | 2 | 1 | 0 | 1 |
| UNIT NO 89 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 90 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 91 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 92 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 93 | NA | 1 | 1 | 1 | 0 | 1 |
| UNIT NO 94 | NA | 1 | 1 | 1 | 0 | 1 |
| Amenity Building-Shop 12 | NA | 2 | 2 | 0 | 12 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 95 buildings; the table lists the first 20.
846 of 859 construction stages are filed complete across 95 buildings. The stage furthest along is Slabs of Super Structure, at 30%.
UNIT NO 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 6100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 12100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 13100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 14100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 15100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 16100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 17100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO 18100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO-19100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
UNIT NO-20100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 70% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | Not applicable |
| Open Parking | Yes | Not applicable |
Parking filed96
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| UNIT NO 1 | 1 | 1 |
| UNIT NO 2 | 1 | 1 |
| UNIT NO 3 | 1 | 1 |
| UNIT NO 4 | 1 | 1 |
| UNIT NO 5 | 1 | 1 |
| UNIT NO 6 | 1 | 1 |
| UNIT NO 7 | 1 | 1 |
| UNIT NO 8 | 1 | 1 |
| UNIT NO 9 | 1 | 1 |
| UNIT NO 10 | 1 | 1 |
| UNIT NO 11 | 1 | 1 |
| UNIT NO 12 | 1 | 1 |
| UNIT NO 13 | 1 | 1 |
| UNIT NO 14 | 1 | 1 |
| UNIT NO 15 | 1 | 1 |
| UNIT NO 16 | 1 | 1 |
| UNIT NO 17 | 1 | 1 |
| UNIT NO 18 | 1 | 1 |
| UNIT NO-19 | 1 | 1 |
| UNIT NO-20 | 1 | 1 |
| UNIT NO-21 | 1 | 1 |
| UNIT NO 22 | 1 | 1 |
| UNIT NO 23 | 1 | 1 |
| UNIT NO 24 | 1 | 1 |
| UNIT NO 25 | 1 | 1 |
| UNIT NO 26 | 1 | 1 |
| UNIT NO 27 | 1 | 1 |
| UNIT NO 28 | 1 | 1 |
| UNIT NO 29 | 1 | 1 |
| UNIT NO 30 | 1 | 1 |
| UNIT NO 31 | 1 | 1 |
| UNIT NO 32 | 1 | 1 |
| UNIT NO 33 | 1 | 1 |
| UNIT NO-34 | 1 | 1 |
| UNIT NO 35 | 1 | 1 |
| UNIT NO 36 | 1 | 1 |
| UNIT NO 37 | 1 | 1 |
| UNIT NO 38 | 1 | 1 |
| UNIT NO 39 | 1 | 1 |
| UNIT NO 40 | 1 | 1 |
| UNIT NO 41 | 1 | 1 |
| UNIT NO 42 | 1 | 1 |
| UNIT NO 43 | 1 | 1 |
| UNIT NO 44 | 1 | 1 |
| UNIT NO 45 | 1 | 1 |
| UNIT NO 46 | 1 | 1 |
| UNIT NO 47 | 1 | 1 |
| UNIT NO 48 | 1 | 1 |
| UNIT NO 49 | 1 | 1 |
| UNIT NO 50 | 1 | 1 |
| UNIT NO 51 | 1 | 1 |
| UNIT NO 52 | 1 | 1 |
| UNIT NO 53 | 1 | 1 |
| UNIT NO 54 | 1 | 1 |
| UNIT NO 55 | 1 | 1 |
| UNIT NO 56 | 1 | 1 |
| UNIT NO 57 | 1 | 1 |
| UNIT NO 58 | 1 | 1 |
| UNIT NO 59 | 1 | 1 |
| UNIT NO 60 | 1 | 1 |
| UNIT NO 61 | 1 | 1 |
| UNIT NO 62 | 1 | 1 |
| UNIT NO 63 | 1 | 1 |
| UNIT NO 64 | 1 | 1 |
| UNIT NO 65 | 1 | 1 |
| UNIT NO 66 | 1 | 1 |
| UNIT NO 67 | 1 | 1 |
| UNIT NO 68 | 1 | 1 |
| UNIT NO 69 | 1 | 1 |
| UNIT NO 70 | 1 | 1 |
| UNIT NO 71 | 1 | 1 |
| UNIT NO 72 | 1 | 1 |
| UNIT NO 73 | 1 | 1 |
| UNIT NO 74 | 1 | 1 |
| UNIT NO 75 | 1 | 1 |
| UNIT NO 76 | 1 | 1 |
| UNIT NO 77 | 1 | 1 |
| UNIT NO 78 | 1 | 1 |
| UNIT NO 79 | 1 | 1 |
| UNIT NO 80 | 1 | 1 |
| UNIT NO 81 | 1 | 1 |
| UNIT NO 82 | 1 | 1 |
| UNIT NO 83 | 1 | 1 |
| UNIT NO 84 | 1 | 1 |
| UNIT NO 85 | 1 | 1 |
| UNIT NO 86 | 1 | 1 |
| UNIT NO 87 | 1 | 1 |
| UNIT NO 88 | 1 | 1 |
| UNIT NO 89 | 1 | 1 |
| UNIT NO 90 | 1 | 1 |
| UNIT NO 91 | 1 | 1 |
| UNIT NO 92 | 1 | 1 |
| UNIT NO 93 | 1 | 1 |
| UNIT NO 94 | 1 | 1 |
| Amenity Building-Shop 12 | 2 | 2 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Amenity Building-Shop 12 | NA | Rs 85.00 lakh | Rs 13.99 lakh |
| - | NA | Rs 30.00 lakh | - |
| UNIT NO 91 | NA | Rs 6.00 lakh | Rs 6.00 lakh |
| UNIT NO 92 | NA | Rs 6.00 lakh | Rs 6.00 lakh |
| UNIT NO 93 | NA | Rs 6.00 lakh | Rs 6.00 lakh |
| UNIT NO 94 | NA | Rs 6.00 lakh | Rs 6.00 lakh |
| UNIT NO 61 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
| UNIT NO 62 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
| UNIT NO 63 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
| UNIT NO 64 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
| UNIT NO 65 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
| UNIT NO 66 | NA | Rs 5.95 lakh | Rs 5.95 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANISH PRABHAKAR Jadhav |
| Engineer | VIJAY B AMESUR |
| Chartered Accountant | HARSHA JAIN |
| Chartered Accountant | S Bramhecha & company |
| Partner | Role in project |
|---|---|
| SHREEVASTU BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICTE-park-1-final.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE -park-1-Final.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: FORM3 CA CERTIFICATE -park-1-Final.pdf | 15 Jul 2026 |
| Form 2A (FY 2025-2026)File: form 2a park 1.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: form 1 park 1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: form 2 park 1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: FORM3 CA CERTIFICATE -JAN-MAR-2026-PARK-1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICTE Oct-dec-25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE-Oct-dec-25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE-Oct-dec-25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1- ARCHITECT CERTIFICATE -July-Sep-25.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 31 OCTOBER 2025 (1).pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: FORM3 CA CERTIFICATE 05th OCTOBER 2025 (2).pdf | 11 Nov 2025 |
| Building plan approvalFile: Combined Revised plan-182-2-3_compressed.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 23 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 23 Aug 2025 |
| Withdrawal Update Form 3File: Form -3-Ammedement-Final_compressed.pdf | 23 Aug 2025 |
| Building plan approvalFile: 182-2-3 LAYOUT revised_compressed (1).pdf | 5 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERIFICATE AS PER RERA FOR JUNE 2025_compressed (3).pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINNER CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE FOR JUNE 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: ARCHITECT WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: ARCHITECT WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: ARCHITECT WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 30 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 30 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 30 Jul 2025 |
| Form 5 (FY 2024-2025)File: Scan 20 Jun 2025 (1).pdf | 20 Jun 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A (1)-2_merged.pdf | 9 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT JAN 2025 TO MARCH 2025 (1).pdf | 3 Jun 2025 |
| Form 2File: FORM 2 ENGINEAR JAN 2025 TO MARCH 2025.pdf | 3 Jun 2025 |
| Form 3File: FORM3 CA - HARSHA JAIN JAN 2025 TO MARCH 2025.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD - BOOKED INVENTORY (1).pdf | 3 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self decalartion of Quateraly Progess Report.pdf | 3 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Form 3 Oct 2024 To Dec 2024_compressed.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICAT OCT 2024 TO DES 2024.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICAT OCT 2024 TO DES 2024.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCITECH CERTIFICAT 1 JULY 2024 TO 30 SEP 2024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 1 JULY 2024 TO 30 SPT 2024_20241231.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICAT 1 JULY 2024 TO 30 SEP 2024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 1ST JAN 2024 TO 31ST MARCH 2024.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 1ST APRIL 24 TO 30TH JUNE 24.pdf | 19 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WORK COMPLITION CERTIFICATE 15-05-24_20240720_0001.pdf | 31 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER WORK COMPLITION CERTIFICATE 15-05-24_20240720_0001.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER WORK COMPLITION CERTIFICATE 19-07-24_20240720_0001.pdf | 31 Jul 2024 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 28 Feb 2024 |
| Other - TechnicalFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf | 26 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Self- Declaration regarding Encumbrances.pdf | 16 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Self- Declaration regarding Encumbrances.pdf | 16 Feb 2024 |
| Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER-1.pdf | 16 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: SELF-DELARATION REGARDING DEVIATION REPORT WITH ALLOTMENT.pdf | 16 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Self- Declaration regarding Deviation Report with Model Agreement.pdf | 16 Feb 2024 |
| Copy of the legal title reportFile: LEGAL TILTLE REPORT.pdf | 15 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGNIZATION.pdf | 11 Feb 2024 |
| Other - LegalFile: Shreevastu Buildcon-Land Agrrement_11zon.pdf | 11 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o | 6 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 1 Feb 2024 |
| PAN CardFile: ShreeVastu buildcon pan card .pdf | 29 Jan 2024 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcticate Certificate-Form-1.pdf | 29 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BRAHMGIRI PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SATPUR4,100+ in Nashik
MOULE CITY
DEEPAK BHAGWAN MOULE
Brahmgiri Park-2
SHREEVASTU BUILDCON
Shree Vastu Heights
Swastik Developers
GANRAJ SANKUL
TRIDENT DEVELOPERS
Thorat Heights
Nandkumar Bhagirath Jadhav
KIRAN VERTEX
SEVA DEVELOPERS
See every Nashik project, with the district possession charts
Builder: SHREEVASTU BUILDCON
SHREEVASTU BUILDCON has 2 registrations on MahaRERA, including BRAHMGIRI PARK and Brahmgiri Park-2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if BRAHMGIRI PARK is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BRAHMGIRI PARK?
The registered promoter entity is SHREEVASTU BUILDCON, a partnership as per the filing. Its GSTIN 27AFBFS8502B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BRAHMGIRI PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BRAHMGIRI PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BRAHMGIRI PARK?
The professionals named in the filing: Architect: MANISH PRABHAKAR Jadhav; Engineer: VIJAY B AMESUR; Chartered Accountant: HARSHA JAIN; Chartered Accountant: S Bramhecha & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BRAHMGIRI PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback