Completed No litigation declared Residential / Group Housing project

SAI SANJEEVANI

By Suresh Basawanappa Fatate

RG-MH-03372 · RERA P52000021128 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SAI SANJEEVANI is a Residential / Group Housing project by Suresh Basawanappa Fatate in Raigarh, Maharashtra, registered with MahaRERA as P52000021128 on 10 Jun 2019. The registration is recorded completed; possession was promised by 31 Mar 2025. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameSAI SANJEEVANI
  • TypeResidential / Group Housing
  • Location
    • SECTOR NO 59
    • VILLAGE DRONAGIRI TALUKA URAN
    • Dongari
    • Uran
    • Raigarh
    • 400707
  • Pincode400707
  • RERA no.P52000021128
  • ReraGenie IDRG-MH-03372

Builder

  • NameSuresh Basawanappa Fatate
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2019First promiseJun 2023Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jun 2019
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SANJEEVANINA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

SAI SANJEEVANI: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes98%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area550 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI822.71
Proposed, not sanctioned823 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2002 PAUD ROAD PUNE BRANCH SARASWATI BHAVAN S NO 46 1 PAUD ROAD NEAR MORE VIDYALAYA PUNE 411038

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKALPAK ARCHITECTS
EngineerMr Samarth Agarwal
Chartered AccountantMR YUNUS MUKKERI
Chartered AccountantPhule Wagh & Associates LLP
PartnerRole in project
Suresh Basawanappa Fatate-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000016815Jun 2023 → Jun 2024

Reason as filed by the promotera) Our Project- ‘SAI SANJEEVANI’ bearing Reg. No. P52100017946 has its registration valid till 30th June, 2023. b) We are currently in the position of applying for completion certificate subject to pending completion work, from our respective authority (CIDCO), but we were facing COVID-19 disruptions and hurdles for 2 years, also there was non availability of electricity from CIDCO in our sector (which has been currently restored), moreover there was administrative delay in getting the NOC of CRZ from the respective authorities. Due to all these factors we are facing a delay in completing our

EXT52000024985Jun 2023 → Mar 2025

Reason as filed by the promoter1. Our Project- ‘SAI SANJEEVANI’ bearing Reg. No. P52000021128 has its registration valid till 29th June, 2024. 2. We are currently in the position of applying for completion certificate subject to pending completion work, from our respective authority (CIDCO), but we were facing COVID-19 disruptions and hurdles for 2/3 years, also there was non availability of electricity from CIDCO in our sector (which has been currently restored), moreover there was administrative delay in getting the NOC of CRZ from the respective authorities. 3. Due to all these factors we are facing a delay in completing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2025

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Inventory Declaration Sold Unsold_Q3_FY 24-25.pdf27 Feb 2025
Building plan approvalFile: PERT CHART dronagiri-signed.pdf8 Nov 2024
Declaration in FORM BFile: Form B Promoter.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PERT CHART dronagiri-signed.pdf8 Nov 2024
Building Plan Approval (IOD)File: PERT CHART dronagiri-signed.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_2023-2024_Signed.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Oct 2024
Certificates of CA (Form 3)File: Form 3_Sai Sanjeevani.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration Sold Unsold.pdf25 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Suresh Fatate.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Suresh Fatate.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_0001.pdf14 Oct 2023
Declaration in FORM BFile: Form B -Affidavit cum Declaration.pdf20 Jun 2023
Layout approvalFile: Sanctioned Plan 1-3 com.pdf16 Jun 2023
Building plan approvalFile: Sanctioned plan 2-3 com.pdf16 Jun 2023
Building plan approvalFile: Sanctioned Plan 3-3 com.pdf16 Jun 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Ecumbrances - Legal_0001.pdf16 Jun 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Ecumbrances - Finance_0001.pdf16 Jun 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Ecumbrances - Legal_0001.pdf16 Jun 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Ecumbrances - Finance_0001.pdf16 Jun 2023
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1-3 com.pdf16 Jun 2023
Building Plan Approval (IOD)File: Sanctioned plan 2-3 com.pdf16 Jun 2023
Building Plan Approval (IOD)File: Sanctioned Plan 3-3 com.pdf16 Jun 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate- Form D_0001.pdf16 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Sanjeevani.pdf16 Jun 2023
Form 2AFile: Form 2A _2019-2020.pdf16 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A _2020-2021.pdf16 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _2021-2022.pdf16 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_2022-2023.pdf16 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory_0001.pdf16 Jun 2023
Certificates of CA (Form 3)File: Form 3_.pdf16 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account- Form A_0001.pdf16 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLOT 43 SEC 59 DRONAGIRI RERA.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-20.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21_.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021-22_.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA.pdf12 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpak_compressed.pdf14 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 plint completion.pdf17 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Plinth completion.pdf17 Sep 2019
Declaration in FORM BFile: FORM B.pdf30 May 2019
Form 2AFile: scan0002.PDF30 May 2019
PAN CardFile: Suresh Sir Pan Card Copy.PDF24 May 2019
Building plan approvalFile: Sanction Plan 3.pdf16 May 2019
Building plan approvalFile: Sanction Plan 2 (1).pdf16 May 2019
Building plan approvalFile: Sanction Plan 1 (1).pdf16 May 2019
Layout approvalFile: Sanction Plan 3.pdf16 May 2019
Layout approvalFile: Sanction Plan 2 (1).pdf16 May 2019
Layout approvalFile: Sanction Plan 1 (1).pdf16 May 2019
Copy of the legal title reportFile: TITLE REPORT URAN.pdf16 May 2019
Details of encumbrancesFile: TITLE REPORT URAN.pdf16 May 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan 3.pdf16 May 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan 2 (1).pdf16 May 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan 1 (1).pdf16 May 2019
Building Plan Approval (IOD)File: Sanction Plan 3.pdf16 May 2019
Building Plan Approval (IOD)File: Sanction Plan 2 (1).pdf16 May 2019
Building Plan Approval (IOD)File: Sanction Plan 1 (1).pdf16 May 2019
Commencement Certificates / NA Order for plotted developmentFile: CC-compressed_compressed_page-0004.pdf16 May 2019
Certificates of CA (Form 3)File: Cacertificate (1)_compressed.pdf16 May 2019
Proforma of Allotment letterFile: Dronagiri new agrement (1).pdf16 May 2019
Proforma of Allotment letterFile: Allotment letter.pdf16 May 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 21 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SANJEEVANI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE DRONAGIRI TALUKA URAN5,900+ in Raigarh

Builder: Suresh Basawanappa Fatate

Suresh Basawanappa Fatate has 1 registration on MahaRERA, including SAI SANJEEVANI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI SANJEEVANI is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SANJEEVANI?

The registered promoter entity is Suresh Basawanappa Fatate, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SANJEEVANI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SANJEEVANI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SANJEEVANI?

The professionals named in the filing: Architect: KALPAK ARCHITECTS; Engineer: Mr Samarth Agarwal; Chartered Accountant: MR YUNUS MUKKERI; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SANJEEVANI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SANJEEVANI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SANJEEVANI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.