ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / VAISHNOVI HEIGHTS

Registration lapsed No litigation declared Others project

VAISHNOVI HEIGHTS

By VAISHNOVI CONSTRUCTION COMPANY

RG-MH-53869 · RERA P52000010966 · Last updated on MahaRERA portal: 20 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 79 months past the filed date
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2020Possession promised79 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
46 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

VAISHNOVI HEIGHTS is a Others project by VAISHNOVI CONSTRUCTION COMPANY in Raigarh, Maharashtra, registered with MahaRERA as P52000010966 on 31 Aug 2017. Possession was promised by 5 Mar 2020 and is now 79 months past that date. The completion date has moved by 21 months from the original filing. 68 of the 114 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameVAISHNOVI HEIGHTS
  • TypeOthers
  • Location
    • PLOT NO 63 SEC 5
    • ULWE
    • Ulawe
    • Panvel
    • Raigarh
    • 400707
  • Pincode400707
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000010966
  • ReraGenie IDRG-MH-53869

Builder

  • NameVAISHNOVI CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnersKAMALAKAR KESHAV PATIL, SACHIN GURUNATH MHATRE

Key dates

79 months past promisethis monthRegisteredAug 2017First promiseJun 2018Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion5 Mar 2020
  • Revised completionRevised to 5 Mar 2020 (originally 30 Jun 2018)
  • Buildings2 building records
  • Documents filed42 files

Current status

60%68 of 114 units booked
100.0%Work done, per cost certificate

Figures as on 20 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WINGNA161448957
B-WINGNA161448957

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A-WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B-WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered40
Open Space19
BuildingClosed/CoveredOpen SpaceTotal
A-WING201030
B-WING20929

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,549 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Feb 2026
LandownerVillageDistrict
DATTATRAY BALKRISHNA PATILUlaweRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Ltd. (CIDCO)
Permissible FSI3823.23
Proposed, not sanctioned3,823 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALWA THANE
Estimated costRs 40.40 cr
Cost incurredRs 40.40 cr
Work done100.0%
BuildingWingEstimatedIncurred
A-WINGNARs 20.20 crRs 20.20 cr
B-WINGNARs 20.20 crRs 20.20 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFASCINATE ARCHITECTS
EngineerSHRAVANI CONSULTANTS
EngineerSiddharth Maiti
EngineerMr Siddharth Maiti
Chartered AccountantJB Patel & Associates
Chartered AccountantManish K Ramawati and Company
PartnerRole in project
VAISHNOVI CONSTRUCTION COMPANY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000001409Jun 2018 → Jun 2019

Reason as filed by the promoterSince we could not complete the project by the said completion date. We hereby request you to extend the completion date to 30/06/2019.

EA06022619751Jun 2018 → Mar 2020

Reason as filed by the promoterThe reason for seeking an extension of the project registration are as follows: 1. We have received the Occupancy Certificate (OC) for the project on 05/03/2020. We had tried to upload it but due to technical issues the same was not possible. 2. We are now in the final stage of completing the remaining compliance formalities required under MahaRERA after receiving the OC. 3. To ensure that all post-OC compliance obligations are fulfilled properly and without any errors, we request an extension until 05/03/2020. This will help us complete the process smoothly and in full compliance with the reg

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2019-2020)File: FORM 5 ALONG WITH DECLARATION.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 SIGNED.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 2 SIGNED.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 SIGNED.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 SIGNED.pdf9 Feb 2026
Withdrawal Update Form 3File: Vaishnovi Heights Form 3 final.pdf9 Feb 2026
Withdrawal Update Form 3File: Vaishnovi Heights Form 3 final.pdf9 Feb 2026
Form 1File: Form 1.pdf6 Feb 2026
Form 2File: Form 2.pdf6 Feb 2026
Form 3File: Vaishnovi Heights Form 3 final.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory of sold unsold.pdf6 Feb 2026
Form 2A (FY 2019-2020)File: Form 2A final .pdf6 Feb 2026
Certificates of CA (Form 5)File: Form 5 of Vaishnovi.pdf15 Apr 2019
Certificates of CA (Form 3)File: CA CERT NEW.pdf15 Aug 2017
Building plan approvalFile: PLAN 1.pdf2 Aug 2017
Building plan approvalFile: PLAN 2.pdf2 Aug 2017
Building plan approvalFile: PLAN 3.pdf2 Aug 2017
Building plan approvalFile: PLAN 4.pdf2 Aug 2017
Building plan approvalFile: PLAN 5.pdf2 Aug 2017
Layout approvalFile: PLAN 1.pdf2 Aug 2017
Layout approvalFile: PLAN 2.pdf2 Aug 2017
Layout approvalFile: PLAN 3.pdf2 Aug 2017
Layout approvalFile: PLAN 4.pdf2 Aug 2017
Layout approvalFile: PLAN 5.pdf2 Aug 2017
PAN CardFile: Pan Card.pdf2 Aug 2017
Copy of the legal title reportFile: TITLE REPORT.pdf2 Aug 2017
Details of encumbrancesFile: ENCUMBRANCE.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN 2.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN 3.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN 4.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN 5.pdf2 Aug 2017
Building Plan Approval (IOD)File: PLAN 1.pdf2 Aug 2017
Building Plan Approval (IOD)File: PLAN 2.pdf2 Aug 2017
Building Plan Approval (IOD)File: PLAN 3.pdf2 Aug 2017
Building Plan Approval (IOD)File: PLAN 4.pdf2 Aug 2017
Building Plan Approval (IOD)File: PLAN 5.pdf2 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT 1.pdf2 Aug 2017
Declaration in FORM BFile: FORM B.pdf2 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT.pdf2 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE FOR RERA VAISHNOVI PG1 (4 files merged).pdf2 Aug 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf2 Aug 2017

How this compares with Raigarh

60%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 21 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAISHNOVI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ULWE5,900+ in Raigarh

2 kmVAISHNOVI HEIGHTSCompleted 21Lapsed / revoked 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: VAISHNOVI CONSTRUCTION COMPANY

VAISHNOVI CONSTRUCTION COMPANY has 1 registration on MahaRERA, including VAISHNOVI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that VAISHNOVI HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VAISHNOVI HEIGHTS is delayed beyond 5 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAISHNOVI HEIGHTS?

The registered promoter entity is VAISHNOVI CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAISHNOVI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAISHNOVI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAISHNOVI HEIGHTS?

The professionals named in the filing: Architect: FASCINATE ARCHITECTS; Engineer: SHRAVANI CONSULTANTS; Engineer: Siddharth Maiti; Engineer: Mr Siddharth Maiti; Chartered Accountant: JB Patel & Associates; Chartered Accountant: Manish K Ramawati and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAISHNOVI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAISHNOVI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAISHNOVI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.