Home / Browse projects / Raigarh, Maharashtra / LAKHANI GRANDEUR

Registration lapsed Litigation declared Others project

LAKHANI GRANDEUR

By LAKHANI BUILDERS PVT LTD

RG-MH-03263 · RERA P52000022289 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 12 months past the filed date
  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
4 of 11Construction stages donefurthest along: Staircases, 80%
47 of 73Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 231 documents Report an error

LAKHANI GRANDEUR is a Others project by LAKHANI BUILDERS PVT LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000022289 on 9 Sep 2019. Possession was promised by 31 Oct 2025 and is now 12 months past that date. The completion date has moved by 10 months from the original filing. 26 of the 73 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLAKHANI GRANDEUR
  • TypeOthers
  • Location
    • 30M WIDE ROAD
    • ULWE
    • Ulawe
    • Panvel
    • Raigarh
    • 400707
  • Pincode400707
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000022289
  • ReraGenie IDRG-MH-03263

Builder

  • NameLAKHANI BUILDERS PVT LTD
  • Entity typeCompany
  • CINU70102MH2009PTC197775
  • GSTIN27AABCL6926A1ZR
  • Managing DirectorVISHAN SATRAMDAS LAKHANI
  • Other registrations10 more →
  • Completed4 of 11
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

12 months past promisethis monthRegisteredSep 2019First promiseDec 2024Revised toOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Sep 2019
  • Promised completion31 Oct 2025
  • Revised completionRevised to 31 Oct 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed231 files

Current status

36%26 of 73 units booked

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKHANI GRANDEURNA141265873

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

LAKHANI GRANDEUR: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on1 Jun 2026
LandownerVillageDistrict
JANARDAN JIJABA RANADIVE & ANSHUMAN RAMRAO WAGHPune (CB)Pune

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited (CIDCO)
Permissible FSI2324.61
Proposed, not sanctioned2,325 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLiberty Housing Society, Sector 17, Vashi, Navi Mumbai, Maharashtra 400703

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerAUN ALI DELAWALA ALI DELAWALA
EngineerALI ENGINEERS & CONTRACTORS
EngineerRoshan Ramesh Mohite
Chartered AccountantB P RAKHOLIYA & CO
Chartered AccountantKPGA AND ASSOCIATES LLP
Chartered AccountantNAIR & NAIR ASSOCIATES
PartnerRole in project
LAKHANI BUILDERS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000025313Dec 2024 → Oct 2025

Reason as filed by the promoterThe Project land was allotted to original villagers by the CIDCO under 12.5% Gaothan Expansion Scheme. The Villagers had assigned the Project Land by way of lawful registered documents for valuable consideration as agreed and recorded registered documents. After approval and sanction of plan by CIDCO, the Promoters have started the construction activities and have made significant progress in the project and finishing work was going on about 1 year back. However, the said Villagers started creating hurdles in further progress of work by making illegal demands and had not allowed the worker ins

Litigation declared2

CaseCourtStatus
226/2013CIVIL COURT SD AT PANVELPENDING
405/2011CIVIL COURT SD AT PANVELPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601987ARTI BHAGWAN GOLEKARLAKHANI BUILDERS PVT LTD03/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed231

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 231 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2019-2020)File: Form 2A -2020.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 31 03 26.pdf1 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A 2021 granduer.pdf1 Jun 2026
Form 2A (FY 2021-2022)File: Form 2A 2022 granduer.pdf1 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A 2023 granduer.pdf1 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A (2025.pdf1 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 31 03 26.pdf1 Jun 2026
Form 5 (FY 2019-2020)File: Lakhani Grandeur_ Form 5_31032020.pdf31 May 2026
Form 5 (FY 2020-2021)File: Lakhani Grandeur_ Form 5_31032021.pdf31 May 2026
Form 5 (FY 2021-2022)File: Form 5 - Grandeur FY 2021-22.pdf31 May 2026
Form 5 (FY 2022-2023)File: Form5_Grandeur_22-23.pdf31 May 2026
Form 1File: 73-5-ULWE RERA (2025 MARCH).pdf29 May 2026
Form 2File: FORM 2 - GRANDEUR MAR 25.pdf29 May 2026
Form 3File: 31 03 2025 form 3 granduer.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: 31 03 2025.pdf29 May 2026
Form 1File: 73-5-ULWE RERA (2025 JUNE).pdf29 May 2026
Form 2File: FORM 2 - GRANDEUR JUN 25.pdf29 May 2026
Form 3File: Grandeur form 3 30 06 25.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2025.pdf29 May 2026
Form 1File: 73-5-ULWE RERA (2025 SEPTEMBER).pdf29 May 2026
Form 2File: FORM 2 - GRANDEUR SEP 25.pdf29 May 2026
Form 3File: 73-5-ULWE RERA (2025 SEPTEMBER).pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2025.pdf29 May 2026
Form 1File: 73-5-PUSHPAK RERA (2025 DECEMBER).pdf29 May 2026
Form 2File: FORM 2 - GRANDEUR SEP 25.pdf29 May 2026
Form 3File: 30-09-2025.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2025.pdf29 May 2026
Form 5 (FY 2024-2025)File: Form 5 (1).pdf29 May 2026
Form 5 (FY 2023-2024)File: Form 5 Grandeur.pdf28 May 2026
Form 1File: Form 1- ( 30 Sep 2019 ).pdf23 Jan 2026
Form 2File: Form 2 31-05-2019 ( 30-09-2019 ).pdf23 Jan 2026
Form 3File: 31-03-2019.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2019_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- ( 30 Sep 2019 ).pdf23 Jan 2026
Form 2File: Form 2 31-12-2019 ( 31-12-2019 ).pdf23 Jan 2026
Form 3File: 31-12-2019.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2019_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 17-01-2020 ( 31 March 2020 ).pdf23 Jan 2026
Form 2File: Form 2 31-03-2020 ( 31-03-2020 ).pdf23 Jan 2026
Form 3File: 31-03-2020.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2020_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 17-01-2020 ( 31 March 2020 ).pdf23 Jan 2026
Form 2File: Form 2 30-06-2020 ( 30-06-2020 ).pdf23 Jan 2026
Form 3File: 30-06-2020.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30 - 06-2020_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 17-01-2020 ( 31 March 2020 ).pdf23 Jan 2026
Form 2File: Form 2 30-09-2020 ( 30-09-2020 ).pdf23 Jan 2026
Form 3File: 30-09-2020.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2020_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 08-12-2020 ( 31 Dec 2020 ).pdf23 Jan 2026
Form 2File: Form 2 31-12-2020( 31-12-2020 ).pdf23 Jan 2026
Form 3File: 31-12-2020.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2020_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 08-12-2020 ( 31 Dec 2020 ).pdf23 Jan 2026
Form 2File: Form 2 31-03-2021 ( 31-03-2021 ).pdf23 Jan 2026
Form 3File: 31-03-2021.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2021_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 25-06-2021 ( 30 June 2021 ).pdf23 Jan 2026
Form 2File: 30-06-2021.pdf23 Jan 2026
Form 3File: 30-06-2021.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2021_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 25-06-2021 ( 30 June 2021 ).pdf23 Jan 2026
Form 2File: Form 2 30-09-2021 ( 30-09-2021 ).pdf23 Jan 2026
Form 3File: 30-09-2021.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2021_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 16-12-2021 ( 31 Dec 2021 ).pdf23 Jan 2026
Form 2File: Form 2 31-12-2021 ( 31-12-2021 ).pdf23 Jan 2026
Form 3File: 31-12-2021.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2021_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 03-01-2022 ( 31 March 2022 ).pdf23 Jan 2026
Form 2File: Form 2 31-12-2021 ( 31-12-2021 ).pdf23 Jan 2026
Form 3File: 31-03-2022.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-12-2022_0001_compressed.pdf23 Jan 2026
Form 1File: Form 1- 03-01-2022 ( 31 March 2022 ).pdf23 Jan 2026
Form 2File: Form 2 31-12-2021 ( 31-12-2021 ).pdf23 Jan 2026
Form 3File: 30-06-2022.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2022_compressed.pdf23 Jan 2026
Form 1File: Form 1- 23-07-2022 ( 30 Sep 2022 ).pdf23 Jan 2026
Form 2File: Form 2 30-09-2022 ( 30-09-2022 ).pdf23 Jan 2026

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
LAKHANI SIGNATURECTS NO C 826 BANDRA W16CompletedJul 2018Apr 2018
LAKHANI WHITE CASTLEPLOT NO 31 SEC 18 ULWE71CompletedFeb 2015Late, Feb 2015
LAKHANI BLUE WAVESPLOT NO 161 SEC 09 ULWE54CompletedJan 2014Late, Jan 2014

How this compares with Raigarh

36%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 10 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKHANI GRANDEUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ULWE5,900+ in Raigarh

2 kmLAKHANI GRANDEURCompleted 115Lapsed / revoked 31Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 247 registered projects within 2 km.

Builder: LAKHANI BUILDERS PVT LTD

LAKHANI BUILDERS PVT LTD has 11 registrations on MahaRERA, including SIGNATURE and LA RIVERIA. Its filings disclose 10 earlier MahaRERA projects: declares 4 of 10 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that LAKHANI GRANDEUR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LAKHANI GRANDEUR is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKHANI GRANDEUR?

The registered promoter entity is LAKHANI BUILDERS PVT LTD, a company as per the filing. Its CIN U70102MH2009PTC197775 and GSTIN 27AABCL6926A1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKHANI GRANDEUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAKHANI GRANDEUR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAKHANI GRANDEUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKHANI GRANDEUR?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: AUN ALI DELAWALA ALI DELAWALA; Engineer: ALI ENGINEERS & CONTRACTORS; Engineer: Roshan Ramesh Mohite; Chartered Accountant: B P RAKHOLIYA & CO; Chartered Accountant: KPGA AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKHANI GRANDEUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKHANI GRANDEUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKHANI GRANDEUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.