SAI SAMARTH HERITAGE

By SAI SAMARTH BUILDERS

RG-MH-28936 · RERA P52800027263 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jun 2031Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 94%
74 of 127Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

SAI SAMARTH HERITAGE is a Others project by SAI SAMARTH BUILDERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800027263 on 28 Nov 2020. Possession is promised by 1 Jun 2031. 53 of the 127 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameSAI SAMARTH HERITAGE
  • TypeOthers
  • Location
    • KORLE FATA
    • LANJA
    • Lanja (CT)
    • Ratnagiri
    • 416701
  • Pincode416701
  • RERA no.P52800027263
  • ReraGenie IDRG-MH-28936

Builder

  • NameSAI SAMARTH BUILDERS
  • Entity typePartnership
  • PartnersBHAVANA BHAGWAN DHEKANE, VIVEK NARESH MEGHANI, AKASH BHAGWAN DHEKANE, KAUSHIK DINESH PATEL

Key dates

this monthRegisteredNov 2020PromisedJun 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2020
  • Promised completion1 Jun 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed89 files

Current status

42%53 of 127 units booked
83.2%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA108231942
B WINGNA10720828
C WINGNA107391857

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 94%.

A WING80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks94%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%
B WING80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks94%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%
C WING80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks94%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes55%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes45%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed123

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots123
Closed/Covered123
BuildingClosed/CoveredTotal
A WING4343
B WING4040
C WING4040

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,390 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityLanja Nagar Panchayat
Permissible FSI6116.0
Proposed, not sanctioned6,116 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSADGURU COMPLEX, LANJA
Estimated costRs 9.44 cr
Cost incurredRs 7.85 cr
Work done83.16%
BuildingWingEstimatedIncurred
A WINGNARs 3.15 crRs 2.62 cr
B WINGNARs 3.15 crRs 2.62 cr
C WINGNARs 3.15 crRs 2.62 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIRISH S GHORPADE
EngineerSANDEEP S SHETYE
EngineerKishan D Patel
Chartered AccountantKEDAR KARAMBELKAR & CO
Chartered AccountantDhanashri Digambar Karmarkar
Chartered AccountantAaditi Ganu
PartnerRole in project
SAI SAMARTH BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jun 2031

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf21 Apr 2026
Form 5 (FY 2024-2025)File: fORM 5 24-25.pdf17 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf11 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf11 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf27 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf27 Dec 2025
Form 2A (FY 2024-2025)File: Sai Samarth Heritage Form 2a_2024-25.pdf11 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf11 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf5 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf5 Sep 2025
Form 5 (FY 2022-2023)File: form 5.pdf5 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - converted.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf23 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 SAI SAMARTH HERITAGE.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECH CRYSTALINE DECOR.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai samarth builders.pdf4 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf4 Nov 2022
OtherFile: Consent.pdf25 Jun 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE Sai Samarth Builders.pdf9 Apr 2022
CERSAI detailsFile: Cersai Report.pdf9 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold A Wing.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold B Wing.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold C Wing.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf8 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021.pdf5 Dec 2021
Layout approvalFile: SAI SAMARTH HERITAGE-1.pdf19 Mar 2021
Layout approvalFile: SAI SAMARTH HERITAGE-2.pdf19 Mar 2021
Layout approvalFile: SAI SAMARTH HERITAGE-3.pdf19 Mar 2021
Layout approvalFile: SAI SAMARTH HERITAGE-4.pdf19 Mar 2021
Copy of the legal title reportFile: Legal Title Report Revise_compressed.pdf19 Mar 2021
Copy of Layout Approval (in case of layout)File: SAI SAMARTH HERITAGE-1.pdf19 Mar 2021
Copy of Layout Approval (in case of layout)File: SAI SAMARTH HERITAGE-2.pdf19 Mar 2021
Copy of Layout Approval (in case of layout)File: SAI SAMARTH HERITAGE-3.pdf19 Mar 2021
Copy of Layout Approval (in case of layout)File: SAI SAMARTH HERITAGE-4.pdf19 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: HERITAGE NAGARPANCHAYAT ORDER_compressed.pdf19 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AERCHITECH CERTIFICATE REVISED_compressed.pdf16 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERSCERTIFACATE REVISE_compressed.pdf16 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE REVISE.pdf16 Mar 2021
Proforma of Allotment letterFile: Sathekhat Gala Blank Format.pdf16 Jan 2021
Proforma of Allotment letterFile: Flat Blank Format.pdf16 Jan 2021
Layout approvalFile: APPROVED PLAN_compressed-1_compressed.pdf24 Nov 2020
Layout approvalFile: APPROVED PLAN_compressed-2_compressed.pdf24 Nov 2020
Layout approvalFile: APPROVED PLAN_compressed-3_compressed.pdf24 Nov 2020
Layout approvalFile: APPROVED PLAN_compressed-4_compressed.pdf24 Nov 2020
Building plan approvalFile: COLLECTOR ORDER (1).pdf24 Nov 2020
PAN CardFile: PAN CARD.pdf24 Nov 2020
Copy of the legal title reportFile: legal tital report.pdf24 Nov 2020
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf24 Nov 2020
Copy of Layout Approval (in case of layout)File: APPROVED PLAN_compressed-1_compressed.pdf24 Nov 2020
Copy of Layout Approval (in case of layout)File: APPROVED PLAN_compressed-2_compressed.pdf24 Nov 2020

How this compares with Ratnagiri

42%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SAI SAMARTH HERITAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LANJA1,100+ in Ratnagiri

Builder: SAI SAMARTH BUILDERS

SAI SAMARTH BUILDERS has 1 registration on MahaRERA, including SAI SAMARTH HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SAI SAMARTH HERITAGE is delayed beyond 1 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAMARTH HERITAGE?

The registered promoter entity is SAI SAMARTH BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAMARTH HERITAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAMARTH HERITAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAMARTH HERITAGE?

The professionals named in the filing: Architect: SHIRISH S GHORPADE; Engineer: SANDEEP S SHETYE; Engineer: Kishan D Patel; Chartered Accountant: KEDAR KARAMBELKAR & CO; Chartered Accountant: Dhanashri Digambar Karmarkar; Chartered Accountant: Aaditi Ganu. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAMARTH HERITAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAMARTH HERITAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAMARTH HERITAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.