Home / Browse projects / Ratnagiri, Maharashtra / Kripalu Heights
Kripalu Heights
RG-MH-06829 · RERA P52800053631 · Last updated on MahaRERA portal: 5 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kripalu Heights is a Others project by SUNIL MANOHARLAL PURI in Ratnagiri, Maharashtra, registered with MahaRERA as P52800053631 on 21 Nov 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 0 of the 73 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameKripalu Heights
- TypeOthers
- Location
- Upshetewadi
- Mumbai-Goa Highway
- Lanja
- Ratnagiri
- 416701
- Pincode416701
- RERA no.P52800053631
- ReraGenie IDRG-MH-06829
Builder
- NameSUNIL MANOHARLAL PURI
- Entity typeIndividual
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Nov 2023
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 5 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kripalu Heights | NA | 4 | 4 | 33 | 40 | 73 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.
Kripalu Heights: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shasikant Gurudas Upshetye | Lanja (CT) | Ratnagiri |
| Kailas Gurudas Upshetye | Lanja (CT) | Ratnagiri |
| Lata Gurudas Upashetye | Lanja (CT) | Ratnagiri |
| Sunil Puri | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kripalu Heights | NA | Rs 7.68 cr | Rs 6.27 cr |
| - | NA | Rs 85.33 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhijit Pendharkar |
| Engineer | Liyakat Thakur |
| Chartered Accountant | Viral Jobanputra |
| Partner | Role in project |
|---|---|
| SUNIL MANOHARLAL PURI | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI, Sunil Manoharlal Puri, Promoter of the above-mentioned project, hereby submit this explanatory note in support of our request for an extension of the project completion date. 1. Grounds and Reasons for Delay The project has faced delays due to a combination of factors beyond our reasonable control: • Construction Challenges: The pace of RCC (Reinforced Cement Concrete) works slowed down due to logistical and manpower constraints during the initial phase. • Market Conditions: Considering prevailing real estate market trends and cautious buyer sentiment, we decided not to launch sales until s
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A FY 23-24 KD.pdf | 5 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Certified FY 24-25 KD.pdf | 5 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5 Certificate FY 23-24 KD Signed.pdf | 5 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Certificate FY 24-25 KD Signed.pdf | 5 Nov 2025 |
| Form 1File: FORM 1 CERTIFIED Q2 FY 2024-25 KD.pdf | 12 Aug 2025 |
| Form 2File: Form 2 Q2 FY 24-25 KD signed Engineer Certificate from Liyakat.pdf | 12 Aug 2025 |
| Form 3File: Form 3 Q2.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold Q3 FY 24-25 Signed Copy.pdf | 12 Aug 2025 |
| Form 1File: FORM 1 CERTIFIED Q3 FY 2024-25 KD.pdf | 12 Aug 2025 |
| Form 2File: Form 2 Q3 FY 24-25 KD signed Engineer Certificate from Liyakat.pdf | 12 Aug 2025 |
| Form 3File: KD Q3 Form 3.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold Q3 FY 24-25 Signed Copy.pdf | 12 Aug 2025 |
| Form 1File: FORM 1 CERTIFIED Q4 FY 2024-25 KD.pdf | 12 Aug 2025 |
| Form 2File: Form 2 Q4 FY 24-25 KD signed Engineer Certificate.pdf | 12 Aug 2025 |
| Form 3File: RERA - Form 3 - Q4 FY 24-25 KD.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold Q4 FY 24-25 Signed Copy.pdf | 12 Aug 2025 |
| Form 1File: Form 1 Q1.pdf | 31 Jul 2025 |
| Form 2File: Form 2 Q1 FY 24-25 KD signed Engineer Certificate from Liyakat.pdf | 31 Jul 2025 |
| Form 3File: Form 3Q1.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold2324.pdf | 31 Jul 2025 |
| Form 1File: Form 1 Q4 23-24.pdf | 31 Jul 2025 |
| Form 2File: Form 2 Q4 23-24.pdf | 31 Jul 2025 |
| Form 3File: Form 3 Q4 23-24.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold2324.pdf | 31 Jul 2025 |
| Form 1File: Form 1 Q4 23-24.pdf | 31 Jul 2025 |
| Form 2File: Form 2 Q4 23-24.pdf | 31 Jul 2025 |
| Form 3File: Form 3 Q4 23-24.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold2324.pdf | 31 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFIED KD Q3 Form 3_compressed.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFIED KD Form 3 Q1_compressed.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFIED KD Q2 Form 3_compressed.pdf | 19 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 2023-24 KD.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer - Form 2 (1).pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01 CERTIFICATE Q1.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory March 2024.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Sep 2024.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory March 2024.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 kripalu.pdf | 7 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 13 Commencement Certificate.pdf | 21 Oct 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 21 Oct 2023 |
| Proforma of Agreement for saleFile: Final Agreement.pdf | 21 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised_compressed.pdf | 20 Oct 2023 |
| Declaration in FORM BFile: Form B - Affidavit Cum Declaration FInal - Sunil Puri.pdf | 7 Oct 2023 |
| Declaration in FORM BFile: FORM B KAILASH.pdf | 6 Oct 2023 |
| Declaration in FORM BFile: FORM B LATA.pdf | 6 Oct 2023 |
| Declaration in FORM BFile: FORM B SHASHIKANT .pdf | 6 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 9 Disclosure of Annexure - A.pdf | 6 Oct 2023 |
| Proforma of Allotment letterFile: Final Allotment Letter- Kripalu.pdf | 6 Oct 2023 |
| Layout approvalFile: 5 Approved Layout.pdf | 5 Oct 2023 |
| Building plan approvalFile: 5 Approved Layout.pdf | 5 Oct 2023 |
| PAN CardFile: Sunil Puri Pan Card.pdf | 5 Oct 2023 |
| Copy of the legal title reportFile: 2 Legal Title Report.pdf | 5 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: 3 Declaration about Non encumberance.pdf | 5 Oct 2023 |
| Details of encumbrances concerned to LegalFile: 3 Declaration about Non encumberance.pdf | 5 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: 5 Approved Layout.pdf | 5 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Approved Layout.pdf | 5 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Certificate of Architect - Form 1.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Certificate of Engineer - Form 2.pdf | 5 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200282670239_For_Asset_Based_Search_05_10_2023_18_27_03_813.pdf | 5 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 12 Bank Account Declaration.pdf | 5 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: 16 Declaration Model Allotment letter.pdf | 5 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: 15 Declaration Model Agreement.pdf | 5 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kripalu Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lanja1,100+ in Ratnagiri
SAI SAMARTH MAULI
SAMARTH BUILDER
SAI SAMARTH HERITAGE
SAI SAMARTH BUILDERS
Taj City Centre and Taj Residency
K. M. DEVELOPERS
LANJA CITY PRIDE PHASE I
TECHNOBUILT INFRA
Swapnsrushti-5
Hemant Madhukar Naik
KONKAN PARK
MAHESH RAJARAM MESTRY
See every Ratnagiri project, with the district possession charts
Builder: SUNIL MANOHARLAL PURI
SUNIL MANOHARLAL PURI has 2 registrations on MahaRERA, including Puri SeleQt and Kripalu Heights. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that Kripalu Heights shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Kripalu Heights is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kripalu Heights?
The registered promoter entity is SUNIL MANOHARLAL PURI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kripalu Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kripalu Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kripalu Heights?
The professionals named in the filing: Architect: Abhijit Pendharkar; Engineer: Liyakat Thakur; Chartered Accountant: Viral Jobanputra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kripalu Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.