Home / Browse projects / Ratnagiri, Maharashtra / KONKAN PARK
KONKAN PARK
RG-MH-90502 · RERA P52800033317 · Last updated on MahaRERA portal: 26 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KONKAN PARK is a Others project by MAHESH RAJARAM MESTRY in Ratnagiri, Maharashtra, registered with MahaRERA as P52800033317 on 15 Feb 2022. Possession is promised by 31 Dec 2026. 11 of the 64 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete.
At a glance
Project
- NameKONKAN PARK
- TypeOthers
- Location
- Pangle Wadi road
- Behind Shainay Hall
- Lanja (CT)
- Lanja
- Ratnagiri
- 416701
- Pincode416701
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800033317
- ReraGenie IDRG-MH-90502
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings4 building records
- Documents filed56 files
Current status
Figures as on 26 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C WING | NA | 5 | 4 | 17 | 6 | 23 |
| D - Wing | NA | 5 | 4 | 16 | 8 | 24 |
| G - WING | NA | 5 | 4 | 14 | 0 | 14 |
| H- WING | NA | 5 | 0 | 3 | 0 | 3 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
C WING24%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 65% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D - Wing27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
G - WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
H- WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Majid Abdul Kadir Mukadam And 11 | Bhiwandi (M Corp.) | Thane |
| Wazir Yunus Vanu | Mumbai City | Mumbai City |
| Naeem Nazir Barmare | Mumbai City | Mumbai City |
| Vazir Ali Kazi | Mumbai City | Mumbai City |
| Khalil Suleman Lambe | Mumbai City | Mumbai City |
| Nisar Yunus Lambe | Satavali | Ratnagiri |
| Adam Fakir Yahu | Mumbai City | Mumbai City |
| Sagir Fakir Yahu | Mumbai City | Mumbai City |
| Ishaq Ismail Kazi | Mumbai City | Mumbai City |
| Akbar Hameed Baug | Mumbai City | Mumbai City |
| Naziya Yasin Lambe | Satavali | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| G - WING | NA | Rs 1.62 cr | - |
| H- WING | NA | Rs 1.62 cr | - |
| C WING | NA | Rs 1.49 cr | Rs 44.55 lakh |
| D - Wing | NA | Rs 1.49 cr | Rs 44.55 lakh |
| - | NA | Rs 5.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kishor R Lotlikar |
| Engineer | Manoj S Joshi |
| Chartered Accountant | S S Kamat & Associates |
| Partner | Role in project |
|---|---|
| MAHESH RAJARAM MESTRY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: DocScanner 25 May 2026 10-42 pm.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: form2 (2).pdf | 26 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 25-26_1 (1).pdf | 26 May 2026 |
| Withdrawal Update Form 1File: FORM1_CDGH 23 MARCH_26.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH -2026.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 25-26_1 (1).pdf | 25 May 2026 |
| Withdrawal Update Form 1File: form 1 june 2025.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: form 1 sep- 2025.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: Form-1 20Dec-2025.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM1_CDGH 23 MARCH_26.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM1_CDGH 23 MARCH_26.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 JUNE 25-26.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH 25-26.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 25-26.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH -2026.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH -2026.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q2.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form_3_30-09-2025_compressed.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 March-2026.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 25-26_1.pdf | 23 May 2026 |
| Declaration in FORM BFile: Form_B_Promoter_compressed.pdf | 11 Feb 2022 |
| CERSAI detailsFile: CERSAI REPORT KOKAN PARK.pdf | 29 Jan 2022 |
| Proforma of Allotment letterFile: allotment letter.pdf | 22 Jan 2022 |
| Building plan approvalFile: Building Plan Approval (IOD)(4).pdf | 21 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval (IOD)(4).pdf | 21 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Plan Approval (IOD).pdf | 21 Jan 2022 |
| Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale.pdf | 21 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final rera.pdf | 3 Jan 2022 |
| Copy of the legal title reportFile: Legal title Report.pdf | 25 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTIFICATE.pdf | 25 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: MM DEVELOPERS MAHARERA APPLICATION - LAND COST.pdf | 25 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MM DEVELOPERS MAHARERA APPLICATION - LAND COST.pdf | 25 Dec 2021 |
| Details of encumbrancesFile: Details Of Encumbrances - New.pdf | 6 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: M_M_Devloper_form_2_compressed.pdf | 6 Dec 2021 |
| Declaration about Commencement CertificateFile: Revised - Declaration About Commencement Certificate.pdf | 20 Nov 2021 |
| Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Layout approvalFile: 6 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Layout approvalFile: 7 Copy of Layout Approval (in case of layout) (1).pdf | 17 Nov 2021 |
| Layout approvalFile: 8 Copy of Layout Approval (in case of layout) (1).pdf | 17 Nov 2021 |
| Building plan approvalFile: 9 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building plan approvalFile: 10 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building plan approvalFile: 11 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building plan approvalFile: 12 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| PAN CardFile: Mahesh Mestry PAN card.pdf | 17 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 6 Copy of Layout Approval (in case of layout).pdf | 17 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 7 Copy of Layout Approval (in case of layout) (1).pdf | 17 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 8 Copy of Layout Approval (in case of layout) (1).pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 9 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 11 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 12 Building Plan Approval _ NA Order for plotted development.pdf | 17 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Nov 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Dwarka Residency Phase1 | Dwarka Residency Phase1 Satavali Road Opp Mahilashram Lanja City Dist Ratnagiri Maharashtra | 25 | Completed | Nov 2016 | Nov 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KONKAN PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Behind Shainay Hall1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
SAI SAMARTH MAULI
SAMARTH BUILDER
SAI SAMARTH HERITAGE
SAI SAMARTH BUILDERS
Taj City Centre and Taj Residency
K. M. DEVELOPERS
LANJA CITY PRIDE PHASE I
TECHNOBUILT INFRA
Kripalu Heights
SUNIL MANOHARLAL PURI
Swapnsrushti-5
Hemant Madhukar Naik
See every Ratnagiri project, with the district possession charts
Builder: MAHESH RAJARAM MESTRY
MAHESH RAJARAM MESTRY has 3 registrations on MahaRERA, including KOKAN PARK and DEVINE MERCY SRA CHS PROP.. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if KONKAN PARK is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KONKAN PARK?
The registered promoter entity is MAHESH RAJARAM MESTRY, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KONKAN PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KONKAN PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KONKAN PARK?
The professionals named in the filing: Architect: Kishor R Lotlikar; Engineer: Manoj S Joshi; Chartered Accountant: S S Kamat & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KONKAN PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.