SAI PUSHP

By SAI SWASTIK DEVELOPERS

RG-MH-21853 · RERA P51500052823 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
3 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

SAI PUSHP is a Others project by SAI SWASTIK DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500052823 on 5 Oct 2023. Possession is promised by 31 Dec 2026. 23 of the 26 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI PUSHP
  • TypeOthers
  • Location
    • SATARA PARISAR
    • BEED BY PASS
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431010
  • Pincode431010
  • RERA no.P51500052823
  • ReraGenie IDRG-MH-21853

Builder

  • NameSAI SWASTIK DEVELOPERS
  • Entity typePartnership
  • PartnersPRADEEP BABURAO KUMAWAT, SANDEEP BABURAO KUMAWAT, SACHIN RATANLAL LOHADE, SANDEEP RATANLAL LOHADE

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Current status

88%23 of 26 units booked
57.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI PUSHPNA6622426

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SAI PUSHP: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Open Space56

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area595 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI1887.79
Proposed, not sanctioned1,888 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBeed Bypass, Aurangabad
Estimated costRs 3.33 cr
Cost incurredRs 1.92 cr
Work done57.67%
BuildingWingEstimatedIncurred
SAI PUSHPNARs 3.33 crRs 1.92 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN PATHRIKAR
EngineerAKASH PATHRIKAR
Chartered AccountantSVS & Associates
Chartered AccountantAnand Lodha & Associates
Chartered AccountantSNGP & Company
PartnerRole in project
SAI SWASTIK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2024-25 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2024-25 Q1.pdf30 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q2.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q3.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q2_.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3_.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q2.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q4.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q4.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf16 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q4.pdf16 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q1.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2023-24 Q4.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation.pdf21 Sep 2023
Declaration about Commencement CertificateFile: _Declaration About Commencement Certificate_page-0001.pdf5 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf23 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: _Sepreate Bank Deceration.pdf4 Aug 2023
Copy of the legal title reportFile: Search report-Sai Swastik_11zon.pdf2 Aug 2023
Building plan approvalFile: Building Plan_11zon.pdf1 Aug 2023
Layout approvalFile: Layout.pdf1 Aug 2023
Details of encumbrances concerned to FinanceFile: ilovepdf_merged.pdf1 Aug 2023
Details of encumbrances concerned to LegalFile: ilovepdf_merged.pdf1 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf1 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_11zon.pdf1 Aug 2023
CERSAI detailsFile: _Cersai Decleration.pdf1 Aug 2023
Declaration in FORM BFile: FORM-B FINAL.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINAL.pdf20 Apr 2023
PAN CardFile: company kyc.pdf17 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A_0001_compressed.pdf17 Apr 2023
Proforma of Allotment letterFile: allotment letter proforma.pdf17 Apr 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf17 Apr 2023
Deviation Report with respect to Allotment letterFile: deviation report.pdf17 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report agreement to sale.pdf17 Apr 2023

How this compares with Aurangabad

88%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SAI PUSHP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEED BY PASS1,400+ in Aurangabad

Builder: SAI SWASTIK DEVELOPERS

SAI SWASTIK DEVELOPERS has 1 registration on MahaRERA, including SAI PUSHP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SAI PUSHP is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI PUSHP?

The registered promoter entity is SAI SWASTIK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI PUSHP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI PUSHP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI PUSHP?

The professionals named in the filing: Architect: PAWAN PATHRIKAR; Engineer: AKASH PATHRIKAR; Chartered Accountant: SVS & Associates; Chartered Accountant: Anand Lodha & Associates; Chartered Accountant: SNGP & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI PUSHP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI PUSHP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI PUSHP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.