Sai Proviso Emporis Phase 1

By EMPORIS INFORMATION TECHNOLOGIES LLP

RG-MH-16319 · RERA P52100025711 · Last updated on MahaRERA portal: 22 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 6%
5 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Sai Proviso Emporis Phase 1 is a Commercial project by EMPORIS INFORMATION TECHNOLOGIES LLP in Pune, Maharashtra, registered with MahaRERA as P52100025711 on 3 Jul 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 16 of the 21 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Proviso Emporis Phase 1
  • TypeCommercial
  • Location
    • plot no 27-1 and 30
    • hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025711
  • ReraGenie IDRG-MH-16319

Builder

  • NameEMPORIS INFORMATION TECHNOLOGIES LLP
  • Entity typePartnership
  • Partnerskashish brijmohan gupta, anil mohanlal gandhi, MS SANDEECON INFRA TECH SERVICES PVT LTD SANDEECON, SAMIR PAREKH PAREKH, ALPA GANDHI, BHAVESH GANDHI, BHAVINI GANDHI, NILESH GANDHI, JATIN shantilal shah, SHEETAL GANDHI, RAVINDRA JANGAM, BHARATI JANGAM and 8 more
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2020First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed114 files

Current status

76%16 of 21 units booked
85.7%Work done, per cost certificate

Figures as on 22 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI PROVISO EMPORIS IT PARKNA4202121

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 6%.

SAI PROVISO EMPORIS IT PARK: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed388

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots388
Closed/Covered358
Open Space30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,137 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI3412.41
Proposed, not sanctioned3,412 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchpersipolis plot no 74 sector 17 vashi navi mumbai
Estimated costRs 28.00 cr
Cost incurredRs 24.00 cr
Work done85.71%
BuildingWingEstimatedIncurred
SAI PROVISO EMPORIS IT PARKNARs 25.00 crRs 22.00 cr
-NARs 3.00 crRs 2.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectkiran kale
EngineerDilipkumar K Savaliya
Chartered Accountantpadwal and associates
Chartered AccountantE A Patil & Associates LLP
Chartered AccountantNilam Darne
PartnerRole in project
EMPORIS INFORMATION TECHNOLOGIES LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018525Dec 2023 → Dec 2024

Reason as filed by the promoterI, Sanjay Motilal Gawande, Designated Partner/Partner of M/s. EMPORIS INFORMATION TECHNOLOGIES LLP (PAN: AAFFE5354E), having its registered office address at Plot No.27/1 & 30, MIDC, Rajiv Gandhi Infotech Park Phase II, Hinjawadi, Maan, Pune 400 057 do hereby solemnly declare, undertake and state as under:- 1. The Promoter proposes to develop ‘Private IT / ITES Park’ namely “Sai Proviso Emporis” comprising of Basement floor plus Ground floor plus Thirteen (13) Upper Floors on leasehold land bearing Plot No.27/1 and 30 situated at Rajiv Gandhi Infotech Park, Hinjewadi, Phase-II, Taluka - Mulshi

EXT52100026032Dec 2023 → Dec 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 31-12-2026 to complete the project and fulfil all regulatory requirements.

EA15122518689Dec 2023 → Dec 2026

Reason as filed by the promoterThe primary reason for the delay is pursuant to the Stop Work Notice issued by MIDC on 13/06/2025. We were directed to: (a) Immediately halt all construction of the Project; (b) Ensure proper rainwater flow; (c) Inform the MIDC office within 3 days otherwise building plans approved building plans dated 31/01/2019 will be revoked. This Stop Work Notice caused further delay in the completion of the Project as non-compliance would have led to revocation of approved plans. Thereafter, the MIDC issued a Provisional No-Objection Certificate (“Provisional NOC”) on 19/01/2026 subject to compliance wit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sai_Proviso_Emporis_Phase_1_Form1_Q1_2026-27_20-07-2026_12-56.pdf22 Aug 2026
Withdrawal Update Form 2File: Sai_Proviso_Emporis_Phase_1_Form2_Q1_2026-27_10-07-2026_13-42.pdf22 Aug 2026
Withdrawal Update Form 3File: Sai_Proviso_Emporis_Phase_1_Form3_Q1_2026-27_10-07-2026_13-42_doc1.pdf22 Aug 2026
Withdrawal Update Form 1File: Sai_Proviso_Emporis_Phase_1_Form1_Q1_2026-27_20-07-2026_12-56.pdf20 Jul 2026
Withdrawal Update Form 2File: Sai_Proviso_Emporis_Phase_1_Form2_Q1_2026-27_10-07-2026_13-42.pdf20 Jul 2026
Withdrawal Update Form 3File: Sai_Proviso_Emporis_Phase_1_Form3_Q1_2026-27_10-07-2026_13-42_doc1.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sai Proviso Emporis Phase 1 as on Mar 2026.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 - Sai Proviso Emporis Phase 1 as on Mar 2026.pdf14 Apr 2026
Withdrawal Update Form 3File: Form 3 - Sai Proviso Emporis Phase 1 as on Mar 2026.pdf14 Apr 2026
Withdrawal Update Form 1File: Form 1 - Emporis Phase I as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 - Emporis Phase I as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 3File: Form 3 - Emporis Phase I as on Dec 2025.pdf18 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A - Sai Proviso Emporis Phase I FY24-25.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - Sai Proviso Emporis FY 2024-25.pdf12 Dec 2025
Withdrawal Update Form 1File: Form 1 - Sai Proviso Emporis Phase 1 as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 1File: Form 1 - Sai Proviso Emporis Phase 1 as on Sep 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - Sai Proviso Emporis Phase 1 as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - Sai Proviso Emporis Phase 1 as on Sep 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - Sai Proviso Emporis Phase 1 as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - Sai Proviso Emporis Phase 1 as on Sep 2025.pdf18 Nov 2025
Form 1File: Form 1 ARCHITECT CERTIFICATE.pdf24 Jun 2025
Form 3File: Form 3.pdf24 Jun 2025
Form 2File: Form 2 - Emporis.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf24 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Emporis.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24_compressed.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24_compressed.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Emporis.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Emporis.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Emporis.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Emporis.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Emporis_.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf14 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf7 Jun 2024
Declaration in FORM BFile: Form B.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-20-21 (1).pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-21-22 (1).pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A -22-23 (1).pdf3 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold (1).pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_5_RERA-2022-23.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep'23 (1).pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec'23 (1).pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20231218-ARCHITECT CERTIFICATE.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER_CERTIFICATE Sept 23.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER_CERTIFICATE Dec 23.pdf26 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200291000767_For_Asset_Based_Search_22_12_2023_16_19_03_769.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BRIJ GUPTA.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: KASHISH GUPTA.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SANJAY GAWANDE.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SIDDHANT GAWANDE.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SUMAN BRIJ GUPTA.pdf26 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank Acc.pdf26 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Emporis- Commencement.pdf22 Dec 2023
Declaration about Commencement CertificateFile: Declaration.pdf22 Dec 2023
Proforma of Agreement for saleFile: AFS.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE MAR'23.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC-22.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DEC 22.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emporis Form 3 Dec'22.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep'22.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Emporis.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22.pdf9 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE -.pdf22 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Emporis.pdf22 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf22 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf21 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 May 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Proviso HeightsPlot no 179 sector 17 Ulwe Navi Mumbai135CompletedJun 2016May 2016
Proviso CornerPlot No 224 Sector 23 Ulwe Navi Mumbai62CompletedJun 2016Late, Aug 2016
Galaxy CarinaPlot no.10 Sector 15 Kharghar89CompletedDec 2015May 2015
Proviso ComplexPlot No 5 6 7 Sector 35E Kharghar Navi Mumbai159CompletedSep 2014Jul 2013
Galaxy OrionSector 35D Kharghar93CompletedDec 2013Jul 2013
Galaxy NebulaKharghar sector 1080CompletedJun 2013Jul 2012

How this compares with Pune

76%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Proviso Emporis Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near hinjewadi13,700+ in Pune

2 kmSai Proviso Emporis PhasCompleted 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: EMPORIS INFORMATION TECHNOLOGIES LLP

EMPORIS INFORMATION TECHNOLOGIES LLP has 1 registration on MahaRERA, including Sai Proviso Emporis Phase 1. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sai Proviso Emporis Phase 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Proviso Emporis Phase 1?

The registered promoter entity is EMPORIS INFORMATION TECHNOLOGIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Proviso Emporis Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Proviso Emporis Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Proviso Emporis Phase 1?

The professionals named in the filing: Architect: kiran kale; Engineer: Dilipkumar K Savaliya; Chartered Accountant: padwal and associates; Chartered Accountant: E A Patil & Associates LLP; Chartered Accountant: Nilam Darne. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Proviso Emporis Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Proviso Emporis Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Proviso Emporis Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.