ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Sai Omkar Square

Registered No litigation declared Residential / Group Housing project

Sai Omkar Square

By Annapurna Buildcon

RG-MH-76978 · RERA P51700046230 · Last updated on MahaRERA portal: 1 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
49 of 109Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Sai Omkar Square is a Residential / Group Housing project by Annapurna Buildcon in Thane, Maharashtra, registered with MahaRERA as P51700046230 on 20 Jun 2022. Possession is promised by 30 Jun 2027. 60 of the 109 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameSai Omkar Square
  • TypeResidential / Group Housing
  • Location
    • Subhash Nagar
    • Village -Belavali
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700046230
  • ReraGenie IDRG-MH-76978

Builder

  • NameAnnapurna Buildcon
  • Entity typePartnership
  • PartnersMehul Kantilal Patel, Nishant Nangin Patel, Premji Shivgan Patel, Kavita Ramesh Rathod, Shubh Manish Patel, Harshit Mansih Patel, Keval Gopal Patel, Sagar Jayantilal Patel, Amrutlal Premji Patel, Mehul Kumar Rasiklal Patel, Anilbhai Jethabhai Patel

Key dates

this monthRegisteredJun 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Current status

55%60 of 109 units booked

Figures as on 1 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA7749756
B WINGNA77421153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

A Wing72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 1 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered8
Open Space42

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,482 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
Deepak Ramchandra NaladkarBadlapur (M Cl)Thane
Mahadev Laxman KubalPune (CB)Pune
Kalpana Deepak NaladkarBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Nagarparishad
Permissible FSI4081.89
Proposed, not sanctioned4,082 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREEJ ARCADE PHADKE ROAD

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaj Associates
EngineerRaj Associates
EngineerAtul Kudtarkar & Associates
Chartered AccountantPATEL SENGHANI AND PARVADIYA
Chartered AccountantRITESH DEVJI PATEL
PartnerRole in project
Annapurna Buildcon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf1 Oct 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1).pdf1 Oct 2025
Form 5 (FY 2024-2025)File: Annapurna Buildcon Form 5 2024-25.pdf29 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 22-23 Q3.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3 22-23.pdf4 Sep 2025
Form 1File: FROM 1.pdf4 Sep 2025
Form 2File: FROM 2.pdf4 Sep 2025
Form 3File: Form 3 22-23 Q4.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4 22-23.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 23-24 Q1.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q1 23-24.pdf4 Sep 2025
Form 1File: FROM 1.pdf4 Sep 2025
Form 2File: FROM 2.pdf4 Sep 2025
Form 3File: Form 3 23-24 Q2.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 23-24.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 23-24 Q3.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3 23-24.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 23-24 Q4.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4 23-24.pdf4 Sep 2025
Form 1File: Form 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 24-25 Q1.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q1 24-25.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: Form 2.pdf4 Sep 2025
Form 3File: Form 3 24-25 Q2.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 24-25.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 24-25 Q3.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3 24-25.pdf4 Sep 2025
Form 1File: From 1.pdf4 Sep 2025
Form 2File: From 2.pdf4 Sep 2025
Form 3File: Form 3 24-25 Q4.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4 24-25.pdf4 Sep 2025
Form 1File: FORM 1.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Form 3File: Form 3 Q1 22-23 C.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q1 22-23.pdf3 Sep 2025
Form 1File: From 1.pdf3 Sep 2025
Form 2File: Form 2.pdf3 Sep 2025
Form 3File: Form 3 22-23 Q2.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 22-23.pdf3 Sep 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Omkar Square 1.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 2_.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 upto 31-12-2023.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Invetry List .pdf2 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA AUDIT CERTIFICATE 2022-23.pdf28 Sep 2023
Declaration in FORM BFile: Deepak _R_Naladkar.pdf11 Jun 2022
Declaration in FORM BFile: Kalpana_D_Naladkar.pdf11 Jun 2022
Declaration in FORM BFile: Mahadev_L_Kubal.pdf11 Jun 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf11 Jun 2022
PAN CardFile: PAN Card.pdf8 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate.pdf8 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold_Unsold Inventory Details.pdf8 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1)_merged - Signed_compressed.pdf8 Jun 2022
Layout approvalFile: Muncipalplan.pdf7 Jun 2022
Building plan approvalFile: Muncipalplan.pdf7 Jun 2022
Copy of the legal title reportFile: Title Report Plot No-17.pdf7 Jun 2022
Copy of the legal title reportFile: Title Report Plot No-18.pdf7 Jun 2022
Copy of the legal title reportFile: Title Report Plot No-19.pdf7 Jun 2022
Copy of the legal title reportFile: Title Report PLot No-20.pdf7 Jun 2022
Details of encumbrancesFile: Non Encumbrance Certificate.pdf7 Jun 2022
Copy of Layout Approval (in case of layout)File: Muncipalplan.pdf7 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Muncipalplan.pdf7 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: IOD-CC.pdf7 Jun 2022
Declaration about Commencement CertificateFile: Declaration of CC.pdf7 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200235732894_For_Asset_Based_Search_23_04_2022_17_36_16_641.pdf7 Jun 2022
Proforma of Allotment letterFile: Agreement for sales.pdf7 Jun 2022

How this compares with Thane

55%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Omkar Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village -Belavali7,600+ in Thane

Builder: Annapurna Buildcon

Annapurna Buildcon has 1 registration on MahaRERA, including Sai Omkar Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sai Omkar Square is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Omkar Square?

The registered promoter entity is Annapurna Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Omkar Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Omkar Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Omkar Square?

The professionals named in the filing: Architect: Raj Associates; Engineer: Raj Associates; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: PATEL SENGHANI AND PARVADIYA; Chartered Accountant: RITESH DEVJI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Omkar Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Omkar Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Omkar Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.