Home / Browse projects / Aurangabad, Maharashtra / SAI NIVARA RESIDENCY
SAI NIVARA RESIDENCY
By AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED
RG-MH-86746 · RERA P51500027995 · Last updated on MahaRERA portal: 4 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 37 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI NIVARA RESIDENCY is a Residential / Group Housing project by AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED in Aurangabad, Maharashtra, registered with MahaRERA as P51500027995 on 25 Jan 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 37 months from the original filing. 32 of the 46 units on this registration are recorded sold or booked, and 42 of 55 construction stages are filed complete.
At a glance
Project
- NameSAI NIVARA RESIDENCY
- TypeResidential / Group Housing
- Location
- WALUJ MAHANAGAR - 1
- AURANGABAD
- Tisgaon
- 431102
- Pincode431102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500027995
- ReraGenie IDRG-MH-86746
Builder
- NameAMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- DirectorRATNAKAR BAJIRAO MHASKE
- Managing DirectorSAGAR SUNIL BIRARI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Jan 2021
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Nov 2022)
- Buildings5 building records
- Documents filed60 files
Current status
Figures as on 4 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A -TYPE BUILDING | NA | 4 | 2 | 6 | 0 | 6 |
| B - TYPE BUILDING | NA | 4 | 2 | 12 | 0 | 12 |
| C - TYPE BUILDING | NA | 4 | 2 | 6 | 0 | 6 |
| D - TYPE BUILDING | NA | 4 | 2 | 12 | 0 | 12 |
| E - TYPE BUILDING | NA | 4 | 0 | 10 | 0 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 4 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
42 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.
A -TYPE BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B - TYPE BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C - TYPE BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D - TYPE BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
E - TYPE BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A -TYPE BUILDING | 6 | 6 |
| B - TYPE BUILDING | 12 | 12 |
| C - TYPE BUILDING | 6 | 6 |
| D - TYPE BUILDING | 12 | 12 |
| E - TYPE BUILDING | 10 | 10 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S. SONALI CO-OP. HOUSING SOCIETY LTD. | Aurangabad (CB) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A -TYPE BUILDING | NA | Rs 7.12 cr | Rs 7.05 cr |
| B - TYPE BUILDING | NA | Rs 7.12 cr | Rs 7.05 cr |
| C - TYPE BUILDING | NA | Rs 7.12 cr | Rs 7.05 cr |
| D - TYPE BUILDING | NA | Rs 7.12 cr | Rs 7.05 cr |
| E - TYPE BUILDING | NA | Rs 7.12 cr | Rs 7.05 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR B V RAUT |
| Engineer | D A DESHPANDE |
| Chartered Accountant | CA Kedar S Pande |
| Chartered Accountant | CA SARANG SARAF |
| Chartered Accountant | CA ASHISH A BAHETI |
| Partner | Role in project |
|---|---|
| AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe extension of a specific RERA-registered project (RERA NO. P51500027995) timeline may be due to various reasons such as delays in construction, unforeseen challenges, or force majeure events. It allows us to fulfill their obligations and ensures that homebuyers are provided with the property as per the agreed terms. Extension reasons are typically communicated to regulatory authorities, and transparency is maintained to protect the interests of both developers and buyers.
Reason as filed by the promoterAS OUR PROJECT CONSIDERING 2 BUILDING PERMISSION 1 ONE PLOT NO 4 AND 1 ON PLOT NO 2 AND 3 AS ON DATE WE COMPLETED TOTAL BUILDING CONSTRUCTION ON PLOT NO 4 AND PROCESS IS ONGOING FOR OCCUPENCY CERTIFICATE AND ON PLOT NO 2 AND 3 1 BUILDING COMPLETED OVER 95% AND OTHER BUILDING CONSIDERING WORK FOR 60% SO WE WANT SOME MORE EXTENSION
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: form 1 .pdf | 4 Mar 2026 |
| Form 2File: form2.pdf | 4 Mar 2026 |
| Form 3File: form 3 .pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 4 Mar 2026 |
| Disclosure of sold/ booked inventoryFile: disclouser of sold booked inventory.pdf | 25 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: disclouser of sold booked inventory 1.pdf | 25 Mar 2024 |
| Proforma of Allotment letterFile: PERFORMA allotment letter.pdf | 25 Mar 2024 |
| Declaration in FORM BFile: FORM B NOTRY.pdf | 22 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2023.pdf | 22 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 2023.pdf | 22 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 22 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 22 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-2023.pdf | 22 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 2019-2020.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 2020-2021.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 2021-2022.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022-2023.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 31-12-2023.pdf | 20 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 31-12-2023.pdf | 20 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: inventory sold booked.pdf | 20 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: LEGAL NOC.pdf | 19 Mar 2024 |
| Details of encumbrances concerned to LegalFile: LEGAL NOC.pdf | 19 Mar 2024 |
| Declaration about Commencement CertificateFile: form D(2).pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS.pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf | 19 Mar 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200301078502_For_Asset_Based_Search_19_03_2024_17_51_52_396.pdf | 19 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf | 19 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Maha Rera FY 21-22.pdf | 19 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Maha Rera FY 22-23.pdf | 19 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Maha Rera FY 22-23.pdf | 19 Mar 2024 |
| Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf | 19 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 19 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf | 19 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS.pdf | 19 Mar 2024 |
| Other - FinanceFile: FINANCE NOC.pdf | 19 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CRTIFICATE 10-12-2022.pdf | 15 Dec 2022 |
| Details of encumbrancesFile: NOC.pdf | 16 Jan 2021 |
| OtherFile: Incorporation Certificate.pdf | 15 Jan 2021 |
| OtherFile: LAND REGISTRY DOCUMENTS.pdf | 30 Dec 2020 |
| OtherFile: LAND REGISTRY PART 1.pdf | 26 Dec 2020 |
| OtherFile: LAND REGISTRY PART 2.pdf | 26 Dec 2020 |
| Building plan approvalFile: PLOT NO 2 AND 3 GUT NO 183 PERMISSION LAYOUT.pdf | 15 Dec 2020 |
| Building plan approvalFile: PLOT NO 4 PERMISSION LAYOUT NEW 1.pdf | 15 Dec 2020 |
| Layout approvalFile: PLOT NO 2 AND 3 GUT NO 183 PERMISSION LAYOUT.pdf | 15 Dec 2020 |
| Layout approvalFile: PLOT NO 4 PERMISSION LAYOUT NEW 1.pdf | 15 Dec 2020 |
| PAN CardFile: COMPANY PAN.pdf | 15 Dec 2020 |
| Copy of the legal title reportFile: search report.pdf | 15 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: PLOT NO 2 AND 3 GUT NO 183 PERMISSION LAYOUT.pdf | 15 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: PLOT NO 4 PERMISSION LAYOUT NEW 1.pdf | 15 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PLOT NO 2 AND 3 GUT NO 183 PERMISSION LAYOUT.pdf | 15 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PLOT NO 4 PERMISSION LAYOUT NEW 1.pdf | 15 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: PLOT NO 2 AND 3 GUT NO 183 COMMENCE CERTIFICATE.pdf | 15 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: PLOT NO 4 COMMENCE CERTIFICATE.pdf | 15 Dec 2020 |
| Declaration in FORM BFile: FORM B.pdf | 15 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_architect_-01 _10-12-2020_(birari).pdf | 15 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 enginees - BIRARI.pdf | 15 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 15 Dec 2020 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE.pdf | 15 Dec 2020 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 15 Dec 2020 |
| OtherFile: deed of declaration NEW.pdf | 15 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI NIVARA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AURANGABAD1,400+ in Aurangabad
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
PMAY U Tisgaon 227 B
Unity Developers
PMAY U Tisgaon 225 B
Sahakar JV
PMAY U Tisgaon 227 C
Unity Developers
PMAY U Tisgaon 225 A
Sahakar JV
PMAY U Tisgaon 227 A
Unity Developers
Trillium Tower
Ramesh Sohanlal Sarda
See every Aurangabad project, with the district possession charts
Builder: AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED
AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including SAI NIVARA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that SAI NIVARA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAI NIVARA RESIDENCY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI NIVARA RESIDENCY?
The registered promoter entity is AMRUT VIHAR BUILDERS AND LAND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI NIVARA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI NIVARA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI NIVARA RESIDENCY?
The professionals named in the filing: Architect: MR B V RAUT; Engineer: D A DESHPANDE; Chartered Accountant: CA Kedar S Pande; Chartered Accountant: CA SARANG SARAF; Chartered Accountant: CA ASHISH A BAHETI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI NIVARA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback