Completed No litigation declared Others project

SAI NIRVANA

By Shanklesha Constructions

RG-MH-11389 · RERA P51700003913 · Last updated on MahaRERA portal: 19 Dec 2024

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Completion date moved by 51 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
8Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SAI NIRVANA is a Others project by Shanklesha Constructions in Thane, Maharashtra, registered with MahaRERA as P51700003913 on 6 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2024. The completion date has moved by 51 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NameSAI NIRVANA
  • TypeOthers
  • Location
    • shahad mohane road
    • SHAHAD
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700003913
  • ReraGenie IDRG-MH-11389

Builder

  • NameShanklesha Constructions
  • Entity typePartnership
  • PartnersMANISH PRAKASH MUTHA, ASHOK MOHANRAJ CHHAJED, BHUSHAN GHISULAL JAIN, sharat mohanraj chajjed, VIJAY BHOLANATH SHARMA, MANISH PRAKASH MUTHA, sharat mohanraj chajjed, VIJAY BHOLANATH SHARMA, ASHOK MOHANRAJ CHHAJED, BHUSHAN GHISULAL JAIN

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1 MMRDA RentalNA240000
BUILDING 2NA370000
BUILDING 3NA370000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Building 1 MMRDA Rental100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed379

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots379
Closed/Covered379
BuildingClosed/CoveredTotal
BUILDING 2307307
BUILDING 37272

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,722 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI30087.9
Proposed, not sanctioned24,587 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHUPENDRA PATRAWALA
PartnerRole in project
Shanklesha Constructions-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700003829Dec 2019 → Dec 2020

Reason as filed by the promoterThe Project commenced under MMRDA Rental Housing Scheme whereby developers were offered additional FSI in return for providing tenements of 160 sq. ft. carpet area to MMRDA free of cost. The FSI of the free sale area is released in proportion to the construction of the rental housing units. In November 2016, demonetisation policy was announced which impacted the project. Material supply became irregular and unreliable. Labors rushed to their home town in panic resulting in almost complete halt of work at site. Due to the overall economic situation customers were avoiding making large purchases

EXT51700015210Dec 2019 → Mar 2024

Reason as filed by the promoter1) We have obtained the RERA registration number on 06/08/2017. 2) We are law abiding firm. We have voluntarily applied for RERA and got the RERA number. 3) The project is completed. 4) In COVID-19 pandemic, we handed over the building to the government for treatment of patients suffering from COVID-19. 5) We have not sold/booked the units to any customers. 6) We have already applied for an occupation certificate from local authority and the same is awaited. 7) Since the occupancy certificate from local authority is awaited, we are forced to take an extension of the project till 31/03/2024

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000193950Surendranath Rai and AnrM/s Shanklesha Constructions through its Partners09/09/2020
CC006000000197571Sadanand Madhukar KasarShanklesha Constructions11/07/2021
CC006000000198326Mrs. Leela SodhiMr. Manish Prakash Mutha14/09/2021
CC006000000209719IMRAN MUMTAZ KHANSHANKLESHA CONSTRUCTION22/01/2022
CC006000000429210Vikrant Udhao Lokhandem/s shanklesh constructions13/02/2024
CC12500333AVP PartnersShanklesha Constructions30/01/2025
CC12500334AVP PartnersK K MISHRA30/01/2025
CC12500335AVP PartnersVandana Mishra31/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jul 2024

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 20072024.pdf19 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 20072024.pdf18 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form-4 (3).pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2nd Oc Commercial.pdf20 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3rd Oc.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Declaration June 23.pdf31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration June 23.pdf31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration Sep 23.pdf31 Oct 2023
Certificates of CA (Form 3)File: Form-3 22-23_compressed.pdf31 Oct 2023
Certificates of CA (Form 3)File: Declaration June 23.pdf31 Oct 2023
Certificates of CA (Form 3)File: Declaration Sep 23.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-22-23.pdf31 Oct 2023
Declaration in FORM BFile: Form B.pdf3 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech Certificate 2023.pdf3 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 20 - Sai Nirvana.pdf3 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 21 - Sai Nirvana.pdf3 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 22 - Sai Nirvana.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form-3- Mar 18.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form-3-Mar 19.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form-3-mar-20.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form 2 Mar 21 - Sai Nirvana.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form-3-Mar 22.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2020 Form 5.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021 Form 5.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2022 Form 5.pdf3 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MMRDA Part OC.pdf15 Jul 2023
Declaration about Commencement CertificateFile: REVISED DECLARATION ABOUT COMMENCEMENT CERTIFICATE FORMAT D(1).pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Building 1 MMRDA Rental (3 files merged) (1).pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Flat Details.pdf11 Jun 2021
Disclosure of sold/ booked inventoryFile: Shop Details.pdf11 Jun 2021
Layout approvalFile: Latest Approved Plan.pdf29 Jan 2021
Copy of Layout Approval (in case of layout)File: Latest Approved Plan.pdf29 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2020.pdf24 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cerfificate March 2018_compressed.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cerfificate March 2018_compressed.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cerfificate March 2019_compressed.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cerfificate March 2019_compressed.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cerfificate March 2019_compressed.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit 18-19.pdf20 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: New CC-min.pdf21 Aug 2018
Certificates of CA (Form 3)File: CA Certificate1.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate3.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate4.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate5.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate6.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate7.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate8.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate9.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate10.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate11.pdf22 Aug 2017
Certificates of CA (Form 3)File: CA Certificate2.pdf22 Aug 2017
Certificates of CA (Form 5)File: CA Certificate2.pdf22 Aug 2017
Layout approvalFile: Sai Nirvana Plan.pdf31 Jul 2017
Building plan approvalFile: Sai Nirvana Plan.pdf31 Jul 2017
PAN CardFile: Shanklesha Pan card.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf31 Jul 2017
Details of encumbrancesFile: Details Of Encumbrances Shanklesha.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Sai Nirvana Plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: Sai Nirvana Plan.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2017
Declaration in FORM BFile: FORM B SHANKLESHA.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE SHANKLESHA.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate1.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate2.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate3.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate4.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate5.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate6.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate7.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate8.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate9.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate10.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate11.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement Document.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotmentletter_nirvana.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 51 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI NIRVANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHAHAD7,600+ in Thane

2 kmSAI NIRVANACompleted 93Lapsed / revoked 54Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Shanklesha Constructions

Shanklesha Constructions has 1 registration on MahaRERA, including SAI NIRVANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI NIRVANA is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI NIRVANA?

The registered promoter entity is Shanklesha Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI NIRVANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI NIRVANA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI NIRVANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI NIRVANA?

The professionals named in the filing: Architect: BHUPENDRA PATRAWALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI NIRVANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI NIRVANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI NIRVANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.