ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / SAI KRUPA APT.PLOT NO.8,9,10

Registration lapsed No litigation declared Residential / Group Housing project

SAI KRUPA APT.PLOT NO.8,9,10

By SHUBHAM INFRASTRUCTURE

RG-MH-22851 · RERA P52900024568 · Last updated on MahaRERA portal: 16 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

SAI KRUPA APT.PLOT NO.8,9,10 is a Residential / Group Housing project by SHUBHAM INFRASTRUCTURE in Sindhudurg, Maharashtra, registered with MahaRERA as P52900024568 on 24 Feb 2020. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameSAI KRUPA APT.PLOT NO.8,9,10
  • TypeResidential / Group Housing
  • Location
    • SINDHUDURGPORATION
    • SINDHUDURG
    • Oras Bk.
    • Kudal
    • 416603
  • Pincode416603
  • RERA no.P52900024568
  • ReraGenie IDRG-MH-22851

Builder

  • NameSHUBHAM INFRASTRUCTURE
  • Entity typePartnership
  • PartnersTUKARAM ARJUN HUMRASKAR, MANISHA TUKARAM HUMRASKAR
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

34 months past promisethis monthRegisteredFeb 2020PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Feb 2020
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUBHAM NAGARI - SAI KRUPA APT PLOT NO8,9,10NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHUBHAM NAGARI - SAI KRUPA APT PLOT NO8,9,10: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area687 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI685.19
Proposed, not sanctioned685 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSINDHUDURG

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANDAR JADHAV
EngineerJIYALAL VISHWAKARMA
Chartered AccountantD P J AND CO
PartnerRole in project
SHUBHAM INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saikrupa plot 8910 -Arch cert.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai krupa Arch cert.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai krupa architect cert apr to jun24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai kupa achitect cert jul to sep24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saikrupa plot 8910-Eng cert.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai krupa Eng cert.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai krupa engineer cert apr to jun24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saikrupa Engineer cert jul to sep24.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: saikrupa plot 8910 -QC cert.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sai krupa QC cert.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Saikrupa quality cert apr to jun24.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sai krupa quality cert jul to sep24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLOT 8910 ARCH CERT 30062023.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: plot 8910 sai krupa Arch cert.pdf18 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: plot 8910 sai krupa Eng cert.pdf18 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PLOT 8910 ENG CERT 300623.pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PLOT 8910 ENG CERT 300623.pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PLOT 8910 QUALITY CERT 300623.pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: plot 8910 sai krupa QC cert.pdf18 Dec 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10 3012022.pdf13 Jul 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10.pdf13 Jul 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10.pdf13 Jul 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10.pdf13 Jul 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10 3012022.pdf13 Jul 2023
Declaration about Commencement CertificateFile: 6 FORMAT D - CC Decleration PLOT 8,9,10.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30122022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30032022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30062022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30092022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30122022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30062022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Sai Krupa P8910 Arch Cert 30032023.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Sai Krupa P8910 Eng Cert 30122022.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Sai Krupa P8910 Eng Cert 30032023.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13 Sai Krupa P8910 QC Cert 30122022.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13 Sai Krupa P8910 QC Cert 30122022.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13 Sai Krupa P8910 QC Cert 30032023.pdf13 Jul 2023
CERSAI detailsFile: CERSAI SHUBHAM INFRA SAI KRUPA.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10 30122022.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10 30122022.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: 5 DISCLOSURE OF SOLD - UNSOLD INVENTORY PLOT 8, 9, 10.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A Disclosure of Interest in other Real Estate Organizations PLOT 8910.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A - Disclosure of Interest in other Real Estate Organizations PLOT 8,9,10.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A - Disclosure of Interest in other Real Estate Organizations PLOT 8,9,10.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A - Disclosure of Interest in other Real Estate Organizations PLOT 8,9,10.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A - Disclosure of Interest in other Real Estate Organizations PLOT 8,9,10.pdf13 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A - Disclosure of Interest in other Real Estate Organizations PLOT 8,9,10.pdf13 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 6 FORMAT D - CC Decleration PLOT 8,9,10 3012022.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng cert.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality certificate.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QC cert.pdf31 Jan 2023
Declaration about Commencement CertificateFile: PLOT 8910 DCC.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: PLOT 8910 SUS.pdf14 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_compressed.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate_compressed.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf10 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf10 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf10 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf10 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PLOT 8 TO 10_compressed.pdf3 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NO PROGRESS 8910.pdf11 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PL 8910 ENG_compressed.pdf11 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PL 8910 F2A_compressed.pdf11 Sep 2020

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep SAI KRUPA APT.PLOT NO.8,9,10 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SINDHUDURG530+ in Sindhudurg

Builder: SHUBHAM INFRASTRUCTURE

Shubham Infrastructure has 3 registrations on MahaRERA, including Shubham Nagari -Samarth Krupa Apt. Plot No.04 and SHUBHAM NAGARI - SADGURU KRUPA APT.PLOT NO.5,6,7. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that SAI KRUPA APT.PLOT NO.8,9,10 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI KRUPA APT.PLOT NO.8,9,10 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI KRUPA APT.PLOT NO.8,9,10?

The registered promoter entity is SHUBHAM INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI KRUPA APT.PLOT NO.8,9,10?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI KRUPA APT.PLOT NO.8,9,10?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI KRUPA APT.PLOT NO.8,9,10?

The professionals named in the filing: Architect: MANDAR JADHAV; Engineer: JIYALAL VISHWAKARMA; Chartered Accountant: D P J AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI KRUPA APT.PLOT NO.8,9,10?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI KRUPA APT.PLOT NO.8,9,10. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI KRUPA APT.PLOT NO.8,9,10 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.