NANDANVAN
RG-MH-24539 · RERA P52900006148 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 144 months
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NANDANVAN is a Others project by KALPAK DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900006148 on 14 Aug 2017. Possession is promised by 30 Dec 2028. The completion date has moved by 144 months from the original filing. 12 of the 12 units on this registration are recorded sold or booked, and 30 of 77 construction stages are filed complete.
At a glance
Project
- NameNANDANVAN
- TypeOthers
- Location
- Osargaon
- Kankavli
- Sindhudurg
- 416603
- Pincode416603
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900006148
- ReraGenie IDRG-MH-24539
Builder
- NameKALPAK DEVELOPERS
- Entity typePartnership
- PartnerDINANATH YASHWANT KAMAT
- Other registrations5 more →
- Completed2 of 6
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion30 Dec 2028
- Revised completionRevised to 30 Dec 2028 (originally 31 Dec 2016)
- Buildings7 building records
- Documents filed97 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Twin bunglow 21-22 | NA | 2 | 2 | 2 | 0 | 2 |
| Twin bunglow 25-26 | NA | 2 | 2 | 2 | 0 | 2 |
| Twin bunglow 30A-30B | NA | 2 | 2 | 2 | 0 | 2 |
| Twin Bunglow 31-32 | NA | 2 | 2 | 2 | 0 | 2 |
| Twin bunglow 33-34 | NA | 2 | 2 | 2 | 0 | 2 |
| Twin bunglow 35-36 | NA | 2 | 2 | 2 | 0 | 2 |
| DEVAKI | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 95%.
Twin bunglow 21-2273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Twin bunglow 25-2682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Twin bunglow 30A-30B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Twin Bunglow 31-3250%
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Twin bunglow 33-3482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Twin bunglow 35-3657%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
DEVAKI0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | Yes | 90% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Twin bunglow 21-22 | 4 | 4 |
| Twin bunglow 25-26 | 4 | 4 |
| Twin bunglow 30A-30B | 4 | 4 |
| Twin Bunglow 31-32 | 4 | 4 |
| Twin bunglow 33-34 | 4 | 4 |
| Twin bunglow 35-36 | 4 | 4 |
| DEVAKI | 6 | 6 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MILIND KANDALGAONKAR |
| Architect | Rupesh Narayan Tawate |
| Engineer | RUPESH N TAWATE |
| Engineer | Kapil Namdeo Dalvi |
| Chartered Accountant | Sagar Gajanan Teli |
| Chartered Accountant | Pramod K Patel |
| Partner | Role in project |
|---|---|
| KALPAK DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Nandanvan 07 Form 1 - 31Mar2026.pdf | 23 Jun 2026 |
| Form 2File: Nandanvan Form 2 07- 31Mar2026.pdf | 23 Jun 2026 |
| Form 3File: Form 3 CA Certificate 06 31Mar26 Nandanvan.pdf | 23 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 01 31Mar2026.pdf | 23 Jun 2026 |
| Form 1File: Nandanvan 06 Form 1 - 31Dec2025.pdf | 22 Jun 2026 |
| Form 2File: Nandanvan Form 2 06- 31Dec2025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 01 31Dec2025.pdf | 22 Jun 2026 |
| Form 3File: Form 3 CA Certificate 05 31Dec25 Nandanvan.pdf | 22 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf | 22 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A March 2026.pdf | 22 Jun 2026 |
| Form 5 (FY 2024-2025)File: RERA Annual Certificate 2025 Nandanvan1.pdf | 22 Jun 2026 |
| Form 1File: Nandanvan 01 Form 1 - 31Mar2024.pdf | 17 Jun 2026 |
| Form 2File: Nandanvan Form 2 01- 31Mar2024.pdf | 17 Jun 2026 |
| Form 3File: Form 3 CA Certificate 01 31Mar24 Nandanvan.pdf | 17 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 01 31Mar2024.pdf | 17 Jun 2026 |
| Form 1File: Nandanvan 03 Form 1 - 31Mar2025.pdf | 17 Jun 2026 |
| Form 2File: Nandanvan Form 2 03- 31Mar2025.pdf | 17 Jun 2026 |
| Form 3File: Form 3 CA Certificate 02 31Mar25 Nandanvan.pdf | 17 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 01 31Mar2025.pdf | 17 Jun 2026 |
| Form 1File: Nandanvan 04 Form 1 - 30June2025.pdf | 17 Jun 2026 |
| Form 2File: Nandanvan Form 2 04- 30June2025.pdf | 17 Jun 2026 |
| Form 3File: Form 3 CA Certificate 03 30Jun25 Nandanvan.pdf | 17 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 01 30Jun2025.pdf | 17 Jun 2026 |
| Form 1File: Nandanvan 05 Form 1 - 30Sep2025.pdf | 17 Jun 2026 |
| Form 2File: Nandanvan Form 2 05- 30Sep2025.pdf | 17 Jun 2026 |
| Form 3File: Form 3 CA Certificate 04 30Sep25 Nandanvan.pdf | 17 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 04 30Sep2025.pdf | 17 Jun 2026 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Nandanvan.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: 13 Form 3 CA Certificate - Nandanvan Mar 23.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: 14 Form 3 CA Certificate - Nandanvan June 23.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: 15 Form 3 CA Certificate - Nandanvan Sep 23.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: 16 Form 3 CA Certificate - Nandanvan Dec 23.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Annual Certificate 2023 Nandanvan.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 Form 1 Architect - Nandanvan Mar 23.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 Form 1 Architect - Nandanvan June 23.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 Form 1 Architect - Nandanvan Sep 23.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 Form 1 Architect - Nandanvan Dec 23.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Form 2 Engineers - Nandanvan Mar 23.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Form 2 Engineers - Nandanvan June 23.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Form 2 Engineers - Nandanvan Sep 23.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Form 2 Engineers - Nandanvan Dec 23.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Nandanvan 22-23.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 05 Nandanvan - Annual Report 21-22.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 01 Form 3 -31Mar2018.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 02 Form 3 -31Mar2019.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 03 Form 3 -31Mar2020.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 04 Form 3 -31Mar2021.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 05 Form 3 -30Jun2021.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 06 Form 3 -30Sep2021.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 07 Form 3 -31Dec2021.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 08 Form 3 -31Mar2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 09 Form 3 -30Jun2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 10 Form 3 -30Sep2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Nandanvan 11 Form 3 -31Dec2022.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 01 Nandanvan - Annual Report 17-18.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 02 Nandanvan - Annual Report 18-19.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 03 Nandanvan - Annual Report 19-20.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 04 Nandanvan - Annual Report 20-21.pdf | 19 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 01 Form 1 - 31Mar2018.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 02 Form 1 - 31Mar2019.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 03 Form 1 - 31Mar2020.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 04 Form 1 - 31Mar2021.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 11 Form 1 - 31Dec2022.pdf | 4 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Nandanvan Form 2 31032018.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Nandanvan Form 2 31032019.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Nandanvan Form 2 31032020.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Nandanvan Form 2 31032021.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Nandanvan Form 2 30062021.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Nandanvan Form 2 30092021.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Nandanvan Form 2 31122021.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 08 Nandanvan Form 2 31032022.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 09 Nandanvan Form 2 30062022.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Nandanvan Form 2 30092022.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Nandanvan Form 2 31122022.pdf | 1 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 05 Form 1 - 30Jun2021.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 06 Form 1 - 30Sep2021.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 07 Form 1 - 31Dec2021.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 08 Form 1 - 31Mar2022.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 09 Form 1 - 30Jun2022.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandanvan 10 Form 1 - 30Sep2022.pdf | 29 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NANDANVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Osargaon530+ in Sindhudurg
LAXMAN GOPAL RESIDENCY
TATHASTU ENTERPRISES PRIVATE LIMITED
SAI KRUPA APT.PLOT NO.8,9,10
SHUBHAM INFRASTRUCTURE
SANDHYANAND HOMES
ANAND LAXMAN DICHOLKAR
SHUBHAM NAGARI - SADGURU KRUPA APT.PLOT NO.5,6
SHUBHAM INFRASTRUCTURE
Shubham Nagari -Samarth Krupa Apt. Plot No.04
Shubham Infrastructure
GOA 2
SANSKRUTI LANDMARKS
See every Sindhudurg project, with the district possession charts
Builder: KALPAK DEVELOPERS
KALPAK DEVELOPERS has 6 registrations on MahaRERA, including NILKANTH and NANDANVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if NANDANVAN is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NANDANVAN?
The registered promoter entity is KALPAK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NANDANVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NANDANVAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NANDANVAN?
The professionals named in the filing: Architect: MILIND KANDALGAONKAR; Architect: Rupesh Narayan Tawate; Engineer: RUPESH N TAWATE; Engineer: Kapil Namdeo Dalvi; Chartered Accountant: Sagar Gajanan Teli; Chartered Accountant: Pramod K Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NANDANVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback