Home / Browse projects / Thane, Maharashtra / SAI KANHUJIPOLICE SANKUL

Registration lapsed No litigation declared Residential / Group Housing project

SAI KANHUJIPOLICE SANKUL

By HARSHAD BALU GAWADE

RG-MH-72279 · RERA P51700016588 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
20 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 222 documents Report an error

SAI KANHUJIPOLICE SANKUL is a Residential / Group Housing project by HARSHAD BALU GAWADE in Thane, Maharashtra, registered with MahaRERA as P51700016588 on 23 May 2018. Possession was promised by 29 May 2026 and is now 5 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameSAI KANHUJIPOLICE SANKUL
  • TypeResidential / Group Housing
  • Location
    • TITWALA ROAD TAL KALYAN
    • BALYANI GAON
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016588
  • ReraGenie IDRG-MH-72279

Builder

  • NameHARSHAD BALU GAWADE
  • Entity typeIndividual

Key dates

5 months past promisethis monthRegisteredMay 2018First promiseMay 2024Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 May 2018
  • Promised completion29 May 2026
  • Revised completionRevised to 29 May 2026 (originally 30 May 2024)
  • Buildings5 building records
  • Documents filed222 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA240000
Building BNA250000
Building CNA290000
Building ENA350000
Building DNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 95%.

Building A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Building B80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Building C80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Building E80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Building D80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84
BuildingClosed/CoveredTotal
Building A1313
Building B1414
Building C1818
Building E2424
Building D1515

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on7 Jun 2025
LandownerVillageDistrict
MUKHTAR GULAMAMBIYA GUZAR AND OTHERKalyanThane

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI11793.4
Proposed, not sanctioned9,513 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK CHOWK OPP MALALAXMI MANDIR KALYAN WEST 421301

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHOBHANA JAYANT DESHPANDE OF CREATIONS
EngineerSHANTI CONSULTANTS
EngineerAniruddha Consultant
Chartered AccountantVans & Associate LLP
Chartered AccountantAM Patil&Associates
PartnerRole in project
Harshad Balu Gawade-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019706May 2024 → May 2025

Reason as filed by the promoterPRMOTER BALU GAWADE WAS EXPIRE. SO PROJECT WAS DELAYED. BUT WITHIN 6-8 MONTHS PROJECT WILL BE COMPLETED.

EA28072502212May 2024 → May 2026

Reason as filed by the promoterConstruction quality assurance and financial difficulties resulted in the delay

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed222

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 222 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: architect form 1.pdf26 May 2026
Form 2File: Engineer form 2.pdf26 May 2026
Form 3File: C A form 3_compressed.pdf26 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold_compressed.pdf26 May 2026
Form 1File: Architect Dec 2025.pdf5 Mar 2026
Form 2File: Engineer Dec 2025.pdf5 Mar 2026
Form 3File: CA Dec 2025-compressed.pdf5 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 31 Dec 2025-compressed.pdf5 Mar 2026
Form 1File: form 1 architect sep 2025.pdf12 Dec 2025
Form 2File: form 2 engineer sep 2025.pdf12 Dec 2025
Form 3File: form 3 C A sep 2025.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Quality assurance 24-25.pdf12 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf8 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf5 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf5 Sep 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025
Form 1File: Form 1.pdf25 Jul 2025
Form 2File: Form 2.pdf25 Jul 2025
Form 3File: Form 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf25 Jul 2025

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI KANHUJIPOLICE SANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALYANI GAON7,600+ in Thane

2 kmSAI KANHUJIPOLICE SANKULCompleted 49Lapsed / revoked 11Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: HARSHAD BALU GAWADE

HARSHAD BALU GAWADE has 1 registration on MahaRERA, including SAI KANHUJIPOLICE SANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SAI KANHUJIPOLICE SANKUL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI KANHUJIPOLICE SANKUL is delayed beyond 29 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI KANHUJIPOLICE SANKUL?

The registered promoter entity is HARSHAD BALU GAWADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI KANHUJIPOLICE SANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI KANHUJIPOLICE SANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI KANHUJIPOLICE SANKUL?

The professionals named in the filing: Architect: SHOBHANA JAYANT DESHPANDE OF CREATIONS; Engineer: SHANTI CONSULTANTS; Engineer: Aniruddha Consultant; Chartered Accountant: Vans & Associate LLP; Chartered Accountant: AM Patil&Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI KANHUJIPOLICE SANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI KANHUJIPOLICE SANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI KANHUJIPOLICE SANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.