ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SAI HEAVEN

Registered No litigation declared Residential / Group Housing project

SAI HEAVEN

By MORYA ENTERPRISES

RG-MH-05978 · RERA P51700052714 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 6%
140 of 141Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SAI HEAVEN is a Residential / Group Housing project by MORYA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700052714 on 22 Sep 2023. Possession is promised by 31 Dec 2027. 1 of the 141 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI HEAVEN
  • TypeResidential / Group Housing
  • Location
    • GOLIVALI
    • DOMBIVILI E
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052714
  • ReraGenie IDRG-MH-05978

Builder

  • NameMORYA ENTERPRISES
  • Entity typePartnership
  • PartnersMANIK V BHANE, PRAKASH A BHANE, ROHIT P GUDHKA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredSep 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Current status

1%1 of 141 units booked
16.9%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building no 28 - Sai HeavenNA14131410141

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 6%.

Building no 28 - Sai Heaven: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed183

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots183
Open Space183

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,850 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
VALLABHBHAI G DESHMUKHKalyan-Dombivali (M Corp.)Thane

Approvals and building plan

Permissible FSI8840.13
Proposed, not sanctioned8,840 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN E
Estimated costRs 27.00 cr
Cost incurredRs 4.56 cr
Work done16.89%
BuildingWingEstimatedIncurred
Building no 28 - Sai HeavenNARs 24.00 crRs 4.56 cr
-NARs 3.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRACHNA SHILP
EngineerR A THAKRE
Chartered AccountantGAYAKWAD & ARRACKEN
Chartered AccountantK NARAYAN
Chartered AccountantManali J Godse
PartnerRole in project
MORYA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: MORYA ENT ARCHITECTS CERTIFICATE 31-03-2026.pdf25 May 2026
Withdrawal Update Form 1File: MORYA ENT ARCHITECTS CERTIFICATE 31-03-2026.pdf25 May 2026
Withdrawal Update Form 2File: MORYA ENT FROM 2 ENGINEERS CERTIFICAT 31-03-2026.pdf25 May 2026
Withdrawal Update Form 2File: MORYA ENT FROM 2 ENGINEERS CERTIFICAT 31-03-2026.pdf25 May 2026
Withdrawal Update Form 3File: ab f3m26.pdf25 May 2026
Withdrawal Update Form 3File: ab f3m26.pdf25 May 2026
Building plan approvalFile: HIGHLIGHT 1.pdf2 Apr 2026
Form 1File: MOURYA ENT ARCHITECT S CERTIFICATE 31-12-2025.pdf5 Feb 2026
Form 2File: MOURYA ENT ENGINEERS CERTIFICATE 31-12-2025.pdf5 Feb 2026
Form 3File: MORYA ENTERPRISES FORM NO 3 AS ON 31-12-2025.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: MOURYA ENT SAI HEAVEN SOLD UNSOLD 31-12-2025.pdf5 Feb 2026
Form 1File: MOURYA ENT ARCHITECT S CERTIFICATE 30-09-2025.pdf4 Dec 2025
Form 2File: MOURYA ENT ENGINEER S CERTIFICATE 30-09-2025.pdf4 Dec 2025
Form 3File: MORYA ENTERPRISES FORM -03 03-12-25.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: MORYA ENTERPRISES SOLD & UNSOLD 30-09-25.pdf4 Dec 2025
Form 1File: MOURYA ENTERPRISES ARCHITECT CERTIFICATE 1-8-25.pdf19 Aug 2025
Form 2File: MOURYA ENTERPRISES ARCHITECT CERTIFICATE 1-8-25.pdf19 Aug 2025
Form 3File: MPRYA ENTERPRISES FORM-3 30-06-2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: MPRYA ENTERPRISES SAI HEAVEN SOLD UNSOLD 30-06-2025.pdf19 Aug 2025
Form 5 (FY 2024-2025)File: MORYA ENT 26-05-2025.pdf4 Jun 2025
Form 2A (FY 2024-2025)File: MOURYA ENTERPRISES SAI HEAVEN FORM-2A 31-03-2025.pdf3 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MOURYA ENTEPRISES ARCHITECT S CERTIFICATE 13-05-2025.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES SAI HEAVEN FORM 3 31-03-2025.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MOURYA ENTEPRISES ENGINEER S CERTIFICATE 31-03-2025.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ENT FORM1 DEC24.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENT FORM 3 DEC24.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENT FORM2 DEC24.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 10-10-2023.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 12-01-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 11-04-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 01-07-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ENT ARCHITECH CERTIFICATE 25-10-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 30-09-2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 31-12-2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 31-03-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 30-06-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENT ENGINEERING CERTIFICATE 30-09-2024.pdf18 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MORYA ENT 2A 31-03-2024.pdf18 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: MORYA ENTERPRISES SOLD UNSILD.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: MORYA ENTERPRISES SOLD UNSILD.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MORYA 31-03-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 30-09-2023.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 31-12-2023.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 31-03-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 30-06-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES CA CERTIFICATE 30-09-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 10-10-2023.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 12-01-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 11-04-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ARCHITECT SCERTIFICATE 01-07-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORYA ENT ARCHITECH CERTIFICATE 25-10-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES CA CERTIFICATE 30-09-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 30-06-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 31-03-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 31-12-2023.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MORYA ENTERPRISES 30-09-2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 30-09-2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 31-12-2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 31-03-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENGINEERS CERTIFICATE 30-06-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORYA ENT ENGINEERING CERTIFICATE 30-09-2024.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: MORYA ENTERPRISES SOLD UNSILD.pdf18 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MORYA ENT 2A 31-03-2024.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MORYA 31-03-2024.pdf18 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: MORYA ENTERPRISES SOLD UNSILD.pdf18 Nov 2024
CERSAI detailsFile: CERSAI MORYA NW.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final MORYA FRM 3.pdf22 Aug 2023
Building plan approvalFile: PLN M.pdf10 Aug 2023
Details of encumbrances concerned to FinanceFile: FIN ENC MOR.pdf10 Aug 2023
Details of encumbrances concerned to LegalFile: FIN ENC MOR.pdf10 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: PLN M.pdf10 Aug 2023
Proforma of Agreement for saleFile: Model AFS MORYA.pdf30 Jul 2023
Layout approvalFile: LAY 1.PDF11 Jul 2023
Layout approvalFile: LAY 2.PDF11 Jul 2023
Layout approvalFile: LAY 3.PDF11 Jul 2023
Copy of the legal title reportFile: TITL MO.pdf11 Jul 2023
Copy of Layout Approval (in case of layout)File: LAY 1.PDF11 Jul 2023
Copy of Layout Approval (in case of layout)File: LAY 2.PDF11 Jul 2023
Copy of Layout Approval (in case of layout)File: LAY 3.PDF11 Jul 2023
Declaration in FORM BFile: form B declaration Morya.pdf29 May 2023

How this compares with Thane

1%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI HEAVEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVILI E7,600+ in Thane

2 kmSAI HEAVENCompleted 32Lapsed / revoked 26Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: MORYA ENTERPRISES

MORYA ENTERPRISES has 2 registrations on MahaRERA, including SADGURU HEIGHTS and SAI HEAVEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI HEAVEN is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI HEAVEN?

The registered promoter entity is MORYA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI HEAVEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI HEAVEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI HEAVEN?

The professionals named in the filing: Architect: RACHNA SHILP; Engineer: R A THAKRE; Chartered Accountant: GAYAKWAD & ARRACKEN; Chartered Accountant: K NARAYAN; Chartered Accountant: Manali J Godse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI HEAVEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI HEAVEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI HEAVEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.