Home / Browse projects / Thane, Maharashtra / SAI GANGAT APARTMENT
SAI GANGAT APARTMENT
RG-MH-23874 · RERA P51700004455 · Last updated on MahaRERA portal: 17 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 48 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI GANGAT APARTMENT is a Residential / Group Housing project by MNR DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700004455 on 9 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameSAI GANGAT APARTMENT
- TypeResidential / Group Housing
- Location
- KASAR VADAVALI
- VADAVALI VILLAGE
- Thane (M Corp.)
- Thane
- 400601
- Pincode400601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700004455
- ReraGenie IDRG-MH-23874
Builder
- NameMNR DEVELOPERS
- Entity typePartnership
- PartnersNAVIN DEVIDAS PATIL, RITESH LAXMAN TANDEL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed80 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI GANGAT APARTMENT | NA | 9 | 0 | 0 | 0 | 0 |
| ROW HOUSE | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
SAI GANGAT APARTMENT91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SAI GANGAT APARTMENT | 32 | 2 | 34 |
| ROW HOUSE | 2 | 0 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VISHNU GANGADHAR PATIL | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | WADHE ARCHITECTS INTERIOR DESIGNERS |
| Architect | VINAY PATIL & ASSOCIATES |
| Engineer | PRO TECH CONSULTANTS |
| Partner | Role in project |
|---|---|
| MNR DEVELOPERS | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. COVID-19 (Corona Virus) Pandemic has adversely affected the completion of our project. 2. Due to Nationwide lockdown from March 2020, many of our labourers had migrated to their native places and therefore it was very difficult to arrange labourers to carry out pending construction & other activities of our project during the period. 3. Sir, you will also appreciate that there was a long break in supply chain of building and other related materials & services, which has severely impacted our project. 4. It was difficult to carry out pending construction and other amenities activities due to
Reason as filed by the promoterABC
Reason as filed by the promoter1. We have completed 100% work of the Project. 2. We are in the process of procuring the Occupancy Certificate and Form 4 - Architect’s Certificate on Completion of Project. 3. We have also taken consent for extension from more than 51% of allottees. 4. The remaining process of procuring the Occupancy Certificate will be completed by 31/12/2023 5. Our previous project Architect was not co-operating since long time and therefore there is a delay in compliance. Now we have appointed new Architect for our project.
Reason as filed by the promoter1. We have completed 100% work of the Project. 2. We are in the process of procuring the Occupancy Certificate and Form 4 - Architect’s Certificate on Completion of Project. 3. We have also taken consent for extension from more than 51% of allottees. 4. The remaining process of procuring the Occupancy Certificate will be completed by 30/06/2025.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf | 17 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 17 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 17 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked.pdf | 17 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf | 17 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf | 24 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 25 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 25 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_1nd Quarter.pdf | 25 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_2nd Quarter.pdf | 25 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_3nd Quarter.pdf | 25 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf | 25 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 NEW.pdf | 25 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_Scan_0001.pdf | 10 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf | 26 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4 Form 2A Quality Ass 11072022.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 Form 2A Quality Ass 07102022.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6 Form 2A Quality Ass 10012023.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 7 Form 2A Quality Ass 12042023.pdf | 22 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf | 9 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances concern to legal.pdf | 19 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances concern to legal.pdf | 19 May 2023 |
| Declaration about Commencement CertificateFile: Declaration abt Commencement Certificate_0001.pdf | 19 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert.pdf | 19 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Form 2A Quality Ass 08102021.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Form 2A Quality Ass 11012022.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3 Form 2A Quality Ass 12042022.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4 Form 2A Quality Ass 11072022.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5 Form 2A Quality Ass 07102022.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 6 Form 2A Quality Ass 10012023.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 7 Form 2A Quality Ass 12042023.pdf | 19 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf | 19 May 2023 |
| CERSAI detailsFile: CERSAI Report.pdf | 19 May 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 19 May 2023 |
| Certificates of CA (Form 3)File: Form 3 CA (2).pdf | 19 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Mehul.pdf | 19 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Navin.pdf | 19 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Ritesh.pdf | 19 May 2023 |
| Proforma of Agreement for saleFile: Proforma of Sale Agreement Part 1.pdf | 19 May 2023 |
| Proforma of Agreement for saleFile: Proforma of Sale Agreement Part 2.pdf | 19 May 2023 |
| Proforma of Agreement for saleFile: Proforma of Sale Agreement Part 3.pdf | 19 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abt Separate Bank (Format A)_0001.pdf | 19 May 2023 |
| Deviation Report with respect to Allotment letterFile: Declaration abt Deviation Report (Allotment letter)_0001.pdf | 19 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Declaration abt Deviation Report (Agreement for Sale)_0001.pdf | 19 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Form 5 March 2022.pdf | 14 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf | 29 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 AY 21-22.pdf | 25 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Termination Notice.pdf | 24 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 24 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 24 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked.pdf | 24 Sep 2021 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 24 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 30 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 29 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory.pdf | 29 Jun 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 29 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 March 20 NEW.pdf | 23 Feb 2021 |
| Certificates of CA (Form 5)File: MNR DEVELOPERS ANNUAL REPORT form 5 2019.pdf | 28 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MNR DEVELOPERS ANNUAL REPORT form 5 2019.pdf | 28 Oct 2019 |
| Certificates of CA (Form 5)File: MNR FROM 5.pdf | 17 Oct 2018 |
| Layout approvalFile: PLAN COPY.pdf | 28 Jul 2017 |
| Building plan approvalFile: Declaration IOD.pdf | 28 Jul 2017 |
| PAN CardFile: Pan Card.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: PLAN COPY.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Declaration IOD.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B - promoter.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 28 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Letter of Allotment Proforma.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of Sale Agreement Part 1.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of Sale Agreement Part 2.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of Sale Agreement Part 3.pdf | 28 Jul 2017 |
| OtherFile: Declaration regards part possession.pdf | 28 Jul 2017 |
| OtherFile: Plinth Certificate.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SAI GANGAT APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VADAVALI VILLAGE7,600+ in Thane
Filed coordinates, straight-line distance. 463 registered projects within 2 km.
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
Bliss
Kapstone Constructions Private Limited
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
See every Thane project, with the district possession charts
Builder: MNR DEVELOPERS
MNR DEVELOPERS has 1 registration on MahaRERA, including SAI GANGAT APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SAI GANGAT APARTMENT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAI GANGAT APARTMENT is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI GANGAT APARTMENT?
The registered promoter entity is MNR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI GANGAT APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI GANGAT APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI GANGAT APARTMENT?
The professionals named in the filing: Architect: WADHE ARCHITECTS INTERIOR DESIGNERS; Architect: VINAY PATIL & ASSOCIATES; Engineer: PRO TECH CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI GANGAT APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback