Home / Browse projects / Thane, Maharashtra / Sai Empire

Registered Litigation declared Residential / Group Housing project

Sai Empire

By M/s Sai Shakti Associates

RG-MH-77202 · RERA P51700052073 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
98 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Sai Empire is a Residential / Group Housing project by M/s Sai Shakti Associates in Thane, Maharashtra, registered with MahaRERA as P51700052073 on 19 Jul 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 16 of the 114 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Empire
  • TypeResidential / Group Housing
  • Location
    • Mira Road East
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700052073
  • ReraGenie IDRG-MH-77202

Builder

  • NameM/s Sai Shakti Associates
  • Entity typePartnership
  • GSTIN27ACDFS4091G1Z0
  • PartnersSirtaj Chaudhary, Shailesh Suthar, Rajendra Singh, Pankaj Suthar, Ramdulare Verma, Shadeep Tamang, Parag Joshi, Sachin Singh

Key dates

this monthRegisteredJul 2023First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed83 files

Current status

14%16 of 114 units booked
32.9%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai EmpireNA1709123114

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

Sai Empire: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed178

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots178
Closed/Covered178

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,556 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Cooperation
Permissible FSI6335.1
Proposed, not sanctioned6,335 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No5/6/7 Balda Bhavan 60Feet 90 Feet Road Junction Near Porwal High School Bhayander West PIN 401101
Estimated costRs 4.94 cr
Cost incurredRs 1.62 cr
Work done32.89%
BuildingWingEstimatedIncurred
-NARs 2.60 crRs 48.00 lakh
Sai EmpireNARs 2.34 crRs 1.15 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB A C Planners & Engineers
ArchitectSunil Mhatre
EngineerPro Tech Consultants
EngineerVivek Singh
Chartered AccountantThar & Co
Chartered AccountantSanjay K Sharma & Co
PartnerRole in project
M/s Sai Shakti Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06062621260Dec 2026 → Dec 2027

Reason as filed by the promoterThe project was originally approved for Ground + 17 floors. Subsequently, the promoter decided to revise the development plan and increase the proposed height of the building to Ground + 21 floors. The necessary statutory approvals and sanctions for the revised proposal are currently under process with the concerned authorities, resulting in delays in the construction schedule. Further, the project has been affected by shortages and limited availability of construction materials, increased procurement timelines These factors have adversely impacted the pace of execution and prevented completio

Litigation declared1

CaseCourtStatus
RCS/514/2022/2022CIVIL COURT S D THANEAppeal against injuction order pending before districy court

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Apr 2023

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FROM2A SSA YEAR 2025.....pdf26 May 2026
Form 2A (FY 2025-2026)File: FORM2A YEAR 2026.....pdf26 May 2026
Withdrawal Update Form 1File: form 1.pdf16 May 2026
Withdrawal Update Form 2File: form 2.pdf16 May 2026
Withdrawal Update Form 3File: form 3.pdf16 May 2026
Form 5 (FY 2025-2026)File: Final Form 5.pdf11 May 2026
Withdrawal Update Form 1File: Form1 SSA 24th October 2025.pdf30 Mar 2026
Withdrawal Update Form 1File: Form1.pdf30 Mar 2026
Withdrawal Update Form 2File: FORM2 SSA UPTO 30th September 2025.pdf30 Mar 2026
Withdrawal Update Form 2File: Form2.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 Final Sai shakti Associate.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 25 of Sai Shakti Associates Signed.pdf30 Mar 2026
Withdrawal Update Form 1File: Form1 SSA 24th October 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: FORM2 SSA UPTO 30th September 2025.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 Sept 25 of Sai Shakti Associates Signed.pdf27 Mar 2026
Withdrawal Update Form 1File: FORM1.pdf1 Aug 2025
Withdrawal Update Form 1File: FORM1.pdf1 Aug 2025
Withdrawal Update Form 2File: Form-2.pdf1 Aug 2025
Withdrawal Update Form 2File: Form-2.pdf1 Aug 2025
Withdrawal Update Form 3File: FROM 3.pdf1 Aug 2025
Withdrawal Update Form 3File: FROM 3.pdf1 Aug 2025
Form 1File: form 1.pdf10 Jun 2025
Form 2File: FORM 2.pdf10 Jun 2025
Form 3File: FORM3.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Inventory.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Self declaration.pdf10 Jun 2025
Withdrawal Update Form 1File: form 1.pdf5 Jun 2025
Withdrawal Update Form 2File: FORM 2.pdf5 Jun 2025
Withdrawal Update Form 3File: FORM3.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sai shakti form-3 upload.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Form-3 Sept-24 signed upload.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Form-3 Dec-24 signed to upload.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold List 30 sept24.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold List Dec2024.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE LIST SOLD UNSOLD JUNE24.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SSA 30-06-2024.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SSA.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SSA Rev.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SSA.pdf7 Apr 2025
Other - LegalFile: SSA ORDER 19-01-2024.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 (SSA).pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 (SSA).pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 (SSA).pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 (SSA).pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 (SSA).pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 (SSA).pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A SSA.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure List SSA.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure List SSA.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure List SSA.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSA.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAI SHAKTI ASSOCIATES FORM 3.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAI SHAKTI ASSOCIATES FORM 3.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 6th July_compressed.pdf10 Jul 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf15 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf15 Jun 2023
Declaration about Commencement CertificateFile: Declaration About CC SSA.pdf15 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SKM_C554e23041213580.pdf13 Apr 2023
Other - TechnicalFile: Affidavit Cum Declaration.pdf13 Apr 2023
Building plan approvalFile: Floor Plan 2.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 2.pdf14 Feb 2023
Proforma of Agreement for saleFile: Agreement for Sale 13 to 24.pdf8 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_compressed.pdf7 Feb 2023
Proforma of Agreement for saleFile: Agreement for Sale SSA 1 to 12.pdf10 Oct 2022
CERSAI detailsFile: CERSAI DECLARATION.pdf21 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf21 Sep 2022
Other - LegalFile: Info About CC.pdf21 Sep 2022
Other - LegalFile: Power of Attorneys Sai Karishma Associates_compressed.pdf21 Sep 2022
Copy of the legal title reportFile: Title search-.pdf12 Sep 2022
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf12 Sep 2022
Details of encumbrances concerned to LegalFile: Encumberance.pdf12 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Sep 2022
Building plan approvalFile: Floor Plan.pdf23 Aug 2022
PAN CardFile: Sai Shakti Associates Pan Card.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: 007.pdf23 Aug 2022
Declaration in FORM BFile: Rera Affidavit SSA.pdf23 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf23 Aug 2022

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Empire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira Road East7,600+ in Thane

Builder: M/s Sai Shakti Associates

M/s Sai Shakti Associates has 1 registration on MahaRERA, including Sai Empire. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sai Empire is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Empire?

The registered promoter entity is M/s Sai Shakti Associates, a partnership as per the filing. Its GSTIN 27ACDFS4091G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Empire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Empire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Empire?

The professionals named in the filing: Architect: B A C Planners & Engineers; Architect: Sunil Mhatre; Engineer: Pro Tech Consultants; Engineer: Vivek Singh; Chartered Accountant: Thar & Co; Chartered Accountant: Sanjay K Sharma & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Empire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Empire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Empire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.