Home / Browse projects / Raigarh, Maharashtra / SAI BHAKTI

Registration lapsed No litigation declared Others project

SAI BHAKTI

By SAI ENTERPRISES

RG-MH-96614 · RERA P52000048727 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SAI BHAKTI is a Others project by SAI ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000048727 on 17 Jan 2023. Possession was promised by 31 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameSAI BHAKTI
  • TypeOthers
  • Location
    • SECTOR 20
    • NODE ULWE
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000048727
  • ReraGenie IDRG-MH-96614

Builder

  • NameSAI ENTERPRISES
  • Entity typePartnership
  • PartnersRATANSHI KHIMJI PATEL, SHYAM VASTA PATEL, HARESH PRAVIN GAMI, SANJAY KUNDANMAL JAIN
  • Other registrations13 more →
  • Completed4 of 14
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredJan 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI BHAKTINA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SAI BHAKTI: 81% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area339 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2024

Approvals and building plan

Permissible FSI1019.76
Proposed, not sanctioned1,020 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNERUL-WEST

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerS R CONSULTANTS
EngineerSUBRAMANYA RAO
Chartered AccountantDHAVAL MEHTA
Chartered AccountantSAHIL RAVRIYA
PartnerRole in project
SAI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 -1.pdf17 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC SAI BHAKTI-1.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_compressed.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM5.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIGNED.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 SIGNED.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q1 SIGNED.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 SIGNED.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q1 SIGNED.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 SIGNED.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 SIGNED.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 UPDATED_compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q3 SIGNED_compressed (1).pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf22 Dec 2023
Building plan approvalFile: 173-APPROVED PLAN_compressed.pdf16 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 173-APPROVED PLAN_compressed.pdf16 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC 173-AC.pdf16 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.PDF2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1_compressed.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 COMPRESSED.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.PDF20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_compressed.pdf20 Nov 2023
Copy of the legal title reportFile: TRIPARTIE AGREEMENT.pdf12 Jan 2023
Copy of the legal title reportFile: LEASE AGREEMENT WITH CIDCO.pdf12 Jan 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT TO SALE.pdf7 Jan 2023
Other - LegalFile: TRIPARTIE AGREEMENT.pdf7 Jan 2023
Other - LegalFile: LEASE AGREEMENT WITH CIDCO.pdf7 Jan 2023
Layout approvalFile: LAY OUT.pdf2 Jan 2023
Building plan approvalFile: APPROVED PLAN.pdf2 Jan 2023
PAN CardFile: PAN CARD.pdf2 Jan 2023
Copy of the legal title reportFile: LEGAL TITLE.pdf2 Jan 2023
Details of encumbrances concerned to FinanceFile: DECELERATION CONCERNED TO FINANCE AND LEGAL.pdf2 Jan 2023
Details of encumbrances concerned to LegalFile: DECELERATION CONCERNED TO FINANCE AND LEGAL.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: LAY OUT.pdf2 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf2 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Jan 2023
Declaration about Commencement CertificateFile: DECELRATION OF CC.pdf2 Jan 2023
Declaration in FORM BFile: FORM B.pdf2 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Jan 2023
CERSAI detailsFile: CERSAI REPORT.pdf2 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DECLARATION PARTNERS (INTEREST IN OTHER ORG).pdf2 Jan 2023
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf2 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLERATION OF SEPRATE BANK ACCOUNT.pdf2 Jan 2023
Deviation Report with respect to Allotment letterFile: DECLERATION OF ALLOTMENT LETTER.pdf2 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DECLERATION OF MODEL COPY AGREEMENT.pdf2 Jan 2023
Other - LegalFile: DECELERATION CONCERNED TO LEGAL.pdf2 Jan 2023
Other - FinanceFile: DECELERATION OF CONCERNED TO FINANCE.pdf2 Jan 2023

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI BHAKTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NODE ULWE5,900+ in Raigarh

Builder: SAI ENTERPRISES

SAI ENTERPRISES has 14 registrations on MahaRERA, including SAI SANSKRUTI and SAI HARMONY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SAI BHAKTI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI BHAKTI is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI BHAKTI?

The registered promoter entity is SAI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI BHAKTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI BHAKTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI BHAKTI?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: S R CONSULTANTS; Engineer: SUBRAMANYA RAO; Chartered Accountant: DHAVAL MEHTA; Chartered Accountant: SAHIL RAVRIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI BHAKTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI BHAKTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI BHAKTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.