Home / Browse projects / Thane, Maharashtra / SAHYADRI ELITE
SAHYADRI ELITE
By SIKERIA SHELTER PRIVATE LIMITED
RG-MH-17900 · RERA P51700056156 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 19.00 crore secured on the land, in favour of MOTILAL OSWAL HOME FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAHYADRI ELITE is a Others project by SIKERIA SHELTER PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700056156 on 16 May 2024. Possession is promised by 31 Mar 2028. 15 of the 290 units on this registration are recorded sold or booked, and 6 of 44 construction stages are filed complete.
At a glance
Project
- NameSAHYADRI ELITE
- TypeOthers
- Location
- SURVEY NUMBER 18
- HISSA NO 2
- 9 AND 10
- PISAVALI
- Kalyan
- Thane
- 421306
- Pincode421306
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700056156
- ReraGenie IDRG-MH-17900
Builder
- NameSIKERIA SHELTER PRIVATE LIMITED
- Entity typeCompany
- DirectorsRAVINDRA OMPRAKASH AGRAWAL, VIVEK MISHRILAL AGRAWAL, SACHIN MISHRILAL AGRAWAL, NITIN MISHRILAL AGRAWAL, SANKET SACHIN AGRAWAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings4 building records
- Documents filed72 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NUBMER 1, A WING, SHIVAM | NA | 3 | 3 | 0 | 28 | 28 |
| BUILDING NUMBER 1, B WING, SHUBHAM | NA | 3 | 3 | 0 | 26 | 26 |
| BUILDING NUMBER 2, A WING, DURGA | NA | 17 | 15 | 118 | 0 | 118 |
| BUILDING NUMBER 2, B WING, VYANKATESH | NA | 17 | 15 | 118 | 0 | 118 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 85%.
BUILDING NUBMER 1, A WING, SHIVAM5%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NUMBER 1, B WING, SHUBHAM5%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NUMBER 2, A WING, DURGA49%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 82% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NUMBER 2, B WING, VYANKATESH50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed404
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NUBMER 1, A WING, SHIVAM | 95 | 51 | 146 |
| BUILDING NUMBER 1, B WING, SHUBHAM | 94 | 52 | 146 |
| BUILDING NUMBER 2, A WING, DURGA | 56 | 0 | 56 |
| BUILDING NUMBER 2, B WING, VYANKATESH | 56 | 0 | 56 |
Land and ownership5
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| MORESHWAR SHRIRAM BHOIR | PISAVALI | Thane |
| ANKUSH GOVIND SHISHVE | Pisawali | Thane |
| RUKIMINBAI GOVIND SHISHVE | Pisawali | Thane |
| SULOCHANA ROHIDAS BHOIR | Pisawali | Thane |
| SANIDAS DASHRATH KALAN | Pisawali | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NUMBER 2, A WING, DURGA | NA | Rs 25.00 cr | Rs 6.38 cr |
| BUILDING NUMBER 2, B WING, VYANKATESH | NA | Rs 25.00 cr | Rs 6.38 cr |
| - | NA | Rs 7.50 cr | - |
| BUILDING NUBMER 1, A WING, SHIVAM | NA | Rs 3.75 cr | - |
| BUILDING NUMBER 1, B WING, SHUBHAM | NA | Rs 3.75 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NIRMAL ARTS |
| Engineer | RAJESH THAKARE |
| Chartered Accountant | ASHOK CHANDANSHIVE |
| Chartered Accountant | SANDESH MAHESH AGRAWAL |
| Partner | Role in project |
|---|---|
| SIKERIA SHELTER PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: KDMC REVISE PLAN 25APRIL2025.pdf | 5 Jun 2026 |
| Form 1File: FORM1 Q1 FY 24-25.pdf | 17 Dec 2025 |
| Form 2File: FORM 2 Q1 FY 24-25.pdf | 17 Dec 2025 |
| Form 3File: FORM 3 Q1 FY 24-25_11zon.pdf | 17 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: FORM 3 Q1 FY 24-25_11zon.pdf | 17 Dec 2025 |
| Form 1File: FORM 1 Q2 FY 24-25.pdf | 17 Dec 2025 |
| Form 2File: FORM 2 Q2 FY 24-25 (2).pdf | 17 Dec 2025 |
| Form 3File: FORM 3 Q2 FY 24-25_11zon.pdf | 17 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: FORM 3 Q2 FY 24-25_11zon.pdf | 17 Dec 2025 |
| Form 1File: FORM 1_31-12-2024.pdf | 17 Dec 2025 |
| Form 2File: FORM 2_31-12-2024.pdf | 17 Dec 2025 |
| Form 3File: FORM 3_31-12-2024_11zon.pdf | 17 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: FORM 3_31-12-2024_11zon.pdf | 17 Dec 2025 |
| Form 1File: FORM 1_31032025.pdf | 17 Dec 2025 |
| Form 2File: FORM-2_31-03-2025.pdf | 17 Dec 2025 |
| Form 3File: FORM 3_31032025.pdf | 17 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: FORM 3_31032025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 Q1 FY 25-26.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 Q2 FY 25-26.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 25-26.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 Q2 FY 25-26.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 Q2 FY 25-26.pdf | 17 Dec 2025 |
| Form 2A (FY 2024-2025)File: 24-25 Form2A 31.3.25 _compressed.pdf | 17 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5_31032025_11zon.pdf | 27 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_31032025.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_31032025_11zon.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_31-03-2025.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (144) NA-KD-144-24(FORM-1).pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_31-12-2024.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 engineer.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 24-25_compressed.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 FY 24-25.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q1 FY 24-25_11zon.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 24-25_11zon.pdf | 28 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1 FY 24-25.pdf | 28 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 FY 24-25 (2).pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 10 May 2024 |
| Layout approvalFile: LAYOUT PLAN_1_11zon.pdf | 8 May 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_1_11zon.pdf | 8 May 2024 |
| Building plan approvalFile: SANCTIONED PLAN_01.PDF | 23 Apr 2024 |
| Building plan approvalFile: SANCTIONED PLAN_2.PDF | 23 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN_01.PDF | 23 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN_2.PDF | 23 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN_3.PDF | 23 Apr 2024 |
| Other - TechnicalFile: ANNEXURE A SIGNED.pdf | 23 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCE.pdf | 9 Apr 2024 |
| Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCE.pdf | 9 Apr 2024 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 9 Apr 2024 |
| Other - LegalFile: ANNEXURE A SIGNED.pdf | 9 Apr 2024 |
| Proforma of Allotment letterFile: UPDATED ALLOTMENT LETTER.pdf | 2 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: nitin agrawal.pdf | 16 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ravindra Agrawal.pdf | 16 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin Agrawal.pdf | 16 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SANKET AGRAWAL.pdf | 16 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: VIVEK AGRAWAL (2).pdf | 16 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf | 15 Mar 2024 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf | 15 Mar 2024 |
| Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE DECLARATION.pdf | 15 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Special Bank Account Declaration.pdf | 15 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER DEVIATION.pdf | 15 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: SALE AGREEMENT DIVIATION.pdf | 15 Mar 2024 |
| PAN CardFile: PAN CARD.pdf | 12 Mar 2024 |
| Copy of the legal title reportFile: LEGAL TITTLE REPORT-ANNEX A.pdf | 12 Mar 2024 |
| Copy of the legal title reportFile: legal tittle report-form A.pdf | 12 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate .pdf | 12 Mar 2024 |
| Declaration in FORM BFile: RAVINDRA.pdf | 12 Mar 2024 |
| Declaration in FORM BFile: form B nitin sir.pdf | 12 Mar 2024 |
| Declaration in FORM BFile: form B sachin sir.pdf | 12 Mar 2024 |
| Declaration in FORM BFile: form B sanket.pdf | 12 Mar 2024 |
| Declaration in FORM BFile: VIVEK AGRAWAL.pdf | 12 Mar 2024 |
| Proforma of Agreement for saleFile: SALE AGREEMENT DRAFT.pdf | 12 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAHYADRI ELITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PISAVALI7,600+ in Thane
Filed coordinates, straight-line distance. 152 registered projects within 2 km.
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: SIKERIA SHELTER PRIVATE LIMITED
SIKERIA SHELTER PRIVATE LIMITED has 1 registration on MahaRERA, including SAHYADRI ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SAHYADRI ELITE is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAHYADRI ELITE?
The registered promoter entity is SIKERIA SHELTER PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAHYADRI ELITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAHYADRI ELITE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAHYADRI ELITE?
The professionals named in the filing: Architect: NIRMAL ARTS; Engineer: RAJESH THAKARE; Chartered Accountant: ASHOK CHANDANSHIVE; Chartered Accountant: SANDESH MAHESH AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAHYADRI ELITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback