Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAGAR HOMES is a Residential / Group Housing project by M/S SAGAR DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700021362 on 24 Jun 2019. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 24 of the 58 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameSAGAR HOMES
- TypeResidential / Group Housing
- Location
- RANJNOLI
- Bhiwandi
- Thane
- 421302
- Pincode421302
- RERA no.P51700021362
- ReraGenie IDRG-MH-03369
Builder
- NameM/S SAGAR DEVELOPERS
- Entity typePartnership
- PartnerVAFEED BARKAT KHAN
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jun 2019
- Promised completion29 Dec 2025
- Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed86 files
Current status
Figures as on 14 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 9 | 7 | 42 | 0 | 42 |
| BUILDING B | NA | 9 | 7 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.
BUILDING A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BUILDING B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities16
As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 33% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Covered Parking | Yes | 100% |
Parking filed41
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING A | 14 | 11 | 25 |
| BUILDING B | 11 | 5 | 16 |
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CHHAGAN DEU BHAGAT | Ranjnoli | Thane |
| SALUBAI DEU BHAGAT | Ranjnoli | Thane |
| MOTIRAM DEU BHAGAT | Ranjnoli | Thane |
| GANESH SHANTARAM BHAGAT | Ranjnoli | Thane |
| SHAILESH SHANTARAM BHAGAT | Ranjnoli | Thane |
| SANGEETA PRAKASH BHOIR | Kalyan | Thane |
| VITHABAI SUDHAKAR PATIL | Dapode | Thane |
| KESARINATH SHANTARAM BHAGAT | Ranjnoli | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | K K AND ASSOCIATES |
| Engineer | K K AND ASSOCIATES |
| Chartered Accountant | C M LAD AND ASSOCIATES |
| Chartered Accountant | D H Purohit & Associates |
| Chartered Accountant | C M LAD & ASSOCIATES |
| Chartered Accountant | DEEPAK PUROHIT |
| Partner | Role in project |
|---|---|
| M/S SAGAR DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby state that our Project as on 30/09/2023 is completed to the tune of 97%, Architect Certificate (Form 1) and Engineer Certificate (Form 2) explaining the stage of Completion is attached herewith as an evidence. The Project got delayed just by a few months because of delay in installation of Transformer, Electric Meter Room. Furthermore, installation of Transformer, Electric Meter Room is in process. Once the above work is completed we will make application for Completion Certificate (CC)/Occupancy Certificate (OC) with the respective Municipal Authority. Obtaining CC/OC will take a fe
Reason as filed by the promoterThe Project got delayed due to an unforeseen shortage of labour caused by health crises, migration of workers, etc. Despite our best efforts to secure adequate labour resources, the unavailability of skilled labour has led to unavoidable setbacks in the progress of the work.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 SD_FINAL.pdf | 14 Mar 2026 |
| Form 1File: form 1.pdf | 4 Mar 2026 |
| Form 2File: form 2.pdf | 4 Mar 2026 |
| Form 3File: FORM 3.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory 29-12-2025.pdf | 4 Mar 2026 |
| Form 1File: form1.pdf | 24 Dec 2025 |
| Form 2File: form2.pdf | 24 Dec 2025 |
| Form 3File: FORM 3 _.pdf | 24 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf | 24 Dec 2025 |
| Form 1File: FORM-1 SAGAR HOMES.pdf | 7 Nov 2025 |
| Form 2File: form 2 sagar developers.pdf | 7 Nov 2025 |
| Form 3File: FORM 3_.pdf | 7 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 7 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 SD.pdf | 1 Sep 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1 sagar developers 31-mar25.pdf | 10 May 2025 |
| Certificates of CA (Form 3)File: FORM 3 SAGAR DEVELOPER.pdf | 10 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2 sagar developers 31-mar-25.pdf | 10 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: sd form 2A.pdf | 27 Mar 2025 |
| Declaration in FORM BFile: sd form B(1).pdf | 8 Mar 2025 |
| Declaration in FORM BFile: form B.pdf | 1 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: from-1 sagar homes sign dec24.pdf | 1 Feb 2025 |
| Certificates of CA (Form 3)File: Final Form 3.pdf | 1 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from-2 sagar homes sign dec24.pdf | 1 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 4 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 4 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 .pdf | 4 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: final form 5 .pdf | 19 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: final form 5 .pdf | 19 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SAGAR HOME 31-03-2024.pdf | 12 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SAGAR HOME 30-06-2024.pdf | 12 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 SAGAR HOME.pdf | 12 Nov 2024 |
| Certificates of CA (Form 3)File: FORM-3.pdf | 12 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SAGAR HOME 31-03-2024.pdf | 12 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SAGAR HOME 30-06-2024.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SD inventory disclosure dec2023 with sign.pdf | 18 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 13 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 as on 31 Dec 2023.pdf | 13 Feb 2024 |
| Declaration in FORM BFile: Form B.pdf | 26 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 26 Dec 2023 |
| Layout approvalFile: New Approved Layout Plan.pdf | 21 Dec 2023 |
| Layout approvalFile: New Approved Building Type-A Plan.pdf | 21 Dec 2023 |
| Layout approvalFile: New Approved Building Type-B Plan.pdf | 21 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: New Approved Layout Plan.pdf | 21 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: New Approved Building Type-A Plan.pdf | 21 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: New Approved Building Type-B Plan.pdf | 21 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended Commencement Certificate.pdf | 21 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form-1 june2023.pdf | 16 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sep2023.pdf | 16 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1sep 2023 Final.pdf | 16 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form-2 june2023.pdf | 16 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form -2 sep2023.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: form-3 SD June2023 Signed.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 SD 30 sept Signed.pdf | 16 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Signed.pdf | 21 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Signed.pdf | 21 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Sagar Developers.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 Signed.pdf | 15 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf | 13 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 13 May 2022 |
| Certificates of CA (Form 3)File: Form 3 New.pdf | 13 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5_.pdf | 8 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_compressed.pdf | 16 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_compressed.pdf | 16 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sagar Developers Form 5.pdf | 13 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 9 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 9 Jul 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 9 Jul 2020 |
| Layout approvalFile: Copy of Approved Plan.pdf | 20 Jun 2019 |
| Layout approvalFile: Copy of Layout Approval Plan.pdf | 20 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Copy of Approved Plan.pdf | 20 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval Plan.pdf | 20 Jun 2019 |
| Declaration in FORM BFile: Notarized Form-B of Sagar Developers.pdf | 20 Jun 2019 |
| Certificates of CA (Form 3)File: Form 3 - Chartered Accountant with annexture.pdf | 20 Jun 2019 |
| Building plan approvalFile: Signed letter of IOD.pdf | 22 May 2019 |
| Details of encumbrancesFile: Signed Letter of Encumbrances.pdf | 22 May 2019 |
| Building Plan Approval (IOD)File: Signed letter of IOD.pdf | 22 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAGAR HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RANJNOLI7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: M/S SAGAR DEVELOPERS
M/S SAGAR DEVELOPERS has 2 registrations on MahaRERA, including SAGAR HOMES and PALACIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SAGAR HOMES shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAGAR HOMES is delayed beyond 29 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAGAR HOMES?
The registered promoter entity is M/S SAGAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAGAR HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAGAR HOMES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAGAR HOMES?
The professionals named in the filing: Architect: K K AND ASSOCIATES; Engineer: K K AND ASSOCIATES; Chartered Accountant: C M LAD AND ASSOCIATES; Chartered Accountant: D H Purohit & Associates; Chartered Accountant: C M LAD & ASSOCIATES; Chartered Accountant: DEEPAK PUROHIT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAGAR HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback