Home / Browse projects / Aurangabad, Maharashtra / SAFFRON TRANQUIL LANDSCAPE

Completed No litigation declared Residential / Group Housing project

SAFFRON TRANQUIL LANDSCAPE

By Saffron Associates

RG-MH-00981 · RERA P51500002740 · Last updated on MahaRERA portal: 1 Feb 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
25 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SAFFRON TRANQUIL LANDSCAPE is a Residential / Group Housing project by Saffron Associates in Aurangabad, Maharashtra, registered with MahaRERA as P51500002740 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Jan 2021. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSAFFRON TRANQUIL LANDSCAPE
  • TypeResidential / Group Housing
  • Location
    • Beed Bypass
    • Satara
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431010
  • Pincode431010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500002740
  • ReraGenie IDRG-MH-00981

Builder

  • NameSaffron Associates
  • Entity typePartnership
  • PartnersUMESH POPATLAL MUNOT, YOGESH BALIRAM VARGANTWAR, MANOJ KAPURCHND KALA, VITHAL GANPATRAO LABHSHETWAR, LALIT MANSUKH ZAMBAD, MANDAKINI NARAYANRAO MAHAJAN, MANISH DALICHAND PARAKH, BHARAT MULCHAND JAIN
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Jan 2021
  • Revised completionRevised to 30 Jan 2021 (originally 31 Jul 2019)
  • Buildings6 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING TYPE B1NA30000
BUILDING TYPE B3NA30000
BUILDING TYPE B4NA30000
BUILDING TYPE B5NA30000
HALLNA20000
BUILDING TYPE B2NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 1 Feb 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.

BUILDING TYPE B187%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
BUILDING TYPE B387%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
BUILDING TYPE B487%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
BUILDING TYPE B587%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
HALL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING TYPE B287%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 1 Feb 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes75%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntYes10%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Open Space12
BuildingOpen SpaceTotal
BUILDING TYPE B122
BUILDING TYPE B322
BUILDING TYPE B422
BUILDING TYPE B522
HALL22
BUILDING TYPE B222

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,948 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8591.0
Proposed, not sanctioned8,091 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR KRANTI CHOWK,JALANA ROAD AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ KAPURCHAND KALA
EngineerRajesh Baliram Vargantwar
PartnerRole in project
Saffron Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500002275Jul 2019 → Jul 2020

Reason as filed by the promoterOur project is registered vide Registration No. P51500002740, as per original application for registration we have requested time line for completion of project till 31st July 2019. We have started construction work, however we have received Environmental Clearance from State Level Environment Impact Assessment Authority on 20th May 2019 and present stage of construction of the project is -85%. Hence, we request you to allow extension for completion of the project till 31st July 2020, further we undertake that all requisite approvals are now in place and we will complete the said project befor

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Feb 2021

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion (1).pdf1 Feb 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf1 Feb 2021
Certificates of CA (Form 3)File: saffron Tranquil landscapes.pdf16 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate 2740 31-03-2019.pdf11 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate 2740 30-06-2019.pdf11 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate 2740 30-09-2019.pdf11 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saffron tranquil Landscape 2740 05-04-19.pdf11 Dec 2019
Certificates of CA (Form 3)File: Saffron Tranquil Landscapes 31-3-2019.pdf11 Dec 2019
Certificates of CA (Form 3)File: saffron Tranquil Landscapes 30-6-2019.pdf11 Dec 2019
Certificates of CA (Form 3)File: saffron tranquil landscapes 30-9-2019.pdf11 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5_Saffron Tranquil Landscape_FY 1819_ uploaded.pdf30 Nov 2019
OtherFile: Saffron EC.pdf3 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Tranquil Landscapes Architects Certificate 30-06-2018.pdf30 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Tranquil Landscapes Architects Certificate 30-09-2018.pdf30 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Tranquil Landscapes Architects Certificate 30-12-2018.pdf30 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saffron tranquil landscapes engineers certificate Date 05-01-2019.pdf30 Mar 2019
Certificates of CA (Form 3)File: Saffron tranquil landscapes As on 30-12-2018.pdf20 Mar 2019
Certificates of CA (Form 3)File: Saffron tranquil landscapes.pdf16 Feb 2019
Certificates of CA (Form 3)File: Saffron tranquil landscapes Date 20-10-18.pdf16 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saffron tranquil landscapes 2740.pdf2 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saffron tranquil landscapes 2740 date 05072018.pdf2 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saffron tranquil landscapes 2740 date 05102018.pdf2 Feb 2019
Certificates of CA (Form 5)File: SARRRON TRANQ LANDSCAPA.pdf5 Nov 2018
Certificates of CA (Form 3)File: Saffron Tranquil CA Certificate 1.pdf24 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sffron tranquil landscape - architect certificate.pdf31 May 2018
Certificates of CA (Form 3)File: Saffron Tranquil Landscapes.pdf2 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saffron Associates 3 (1).pdf7 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Tranquil Landscape (1).PDF5 Dec 2017
Certificates of CA (Form 3)File: Saffron Tranquil Landscapes.pdf9 Nov 2017
Layout approvalFile: safron all approved drawings compressed.pdf29 Jul 2017
Building plan approvalFile: safron all approved drawings compressed.pdf29 Jul 2017
PAN CardFile: PANCARD OF SAFFRON ASSOCIATES.pdf29 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT FOR SAFFRON ASSOCIATES.pdf29 Jul 2017
Details of encumbrancesFile: LETTER OF ENCUMBRANCE FINAL.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: safron all approved drawings compressed.pdf29 Jul 2017
Building Plan Approval (IOD)File: safron all approved drawings compressed.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement letter for saffron associates.pdf29 Jul 2017
Declaration in FORM BFile: FORM B SAFFRON TRANQUIL LANDSCAPES.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCCHITECT CERTIFICATE SAFFRON TRANQUIL LANDSCAPES.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE FOR SAFFRON TRANQUIL LANDSCAPES(1).pdf29 Jul 2017
Certificates of CA (Form 3)File: Saffron traquil landscapes-fORM 3.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement to sale saffron tranquil Landscapes.pdf29 Jul 2017

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 18 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SAFFRON TRANQUIL LANDSCAPE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara1,400+ in Aurangabad

2 kmSAFFRON TRANQUIL LANDSCACompleted 18Lapsed / revoked 14Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: Saffron Associates

Saffron Associates has 5 registrations on MahaRERA, including SAFFRON TRANQUIL LANDSCAPE and SAFFRON LANDSCAPES. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SAFFRON TRANQUIL LANDSCAPE is delayed beyond 30 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAFFRON TRANQUIL LANDSCAPE?

The registered promoter entity is Saffron Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAFFRON TRANQUIL LANDSCAPE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAFFRON TRANQUIL LANDSCAPE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAFFRON TRANQUIL LANDSCAPE?

The professionals named in the filing: Architect: MANOJ KAPURCHAND KALA; Engineer: Rajesh Baliram Vargantwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAFFRON TRANQUIL LANDSCAPE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAFFRON TRANQUIL LANDSCAPE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAFFRON TRANQUIL LANDSCAPE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.