Home / Browse projects / Mumbai City, Maharashtra / SADHANAA BUILDING

Completed No litigation declared Residential / Group Housing project

SADHANAA BUILDING

By SIDAAN ENTERPRISE

RG-MH-21612 · RERA P51900023932 · Last updated on MahaRERA portal: 11 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 17 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

SADHANAA BUILDING is a Residential / Group Housing project by SIDAAN ENTERPRISE in Mumbai City, Maharashtra, registered with MahaRERA as P51900023932 on 14 Jan 2020. The registration is recorded completed; possession was promised by 18 Oct 2023. The completion date has moved by 17 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSADHANAA BUILDING
  • TypeResidential / Group Housing
  • Location
    • Telang Cross Road no 1
    • Matunga
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900023932
  • ReraGenie IDRG-MH-21612

Builder

  • NameSIDAAN ENTERPRISE
  • Entity typePartnership
  • PartnersSUKEN SUNIL SHAH, DHIRAJ LAKHAMSHI SHAH, RAXIT MOHANLAL PASAD HUF

Key dates

this monthRegisteredJan 2020First promiseMay 2022Revised toOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jan 2020
  • Promised completion18 Oct 2023
  • Revised completionRevised to 18 Oct 2023 (originally 30 May 2022)
  • Buildings1 building record
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SADHANAA BUILDINGNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

SADHANAA BUILDING: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises77%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area487 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SNEHALATA K PALMumbai CityMumbai City
RAXIT MOHAN PASAD (HUF)Mumbai CityMumbai City
DHIRAJ LAKHAMSHI SHAHMumbai CityMumbai City
SUKEN SUNIL SHAHMumbai CityMumbai City

Approvals and building plan

Permissible FSI2535.3
Proposed, not sanctioned2,535 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDADAR EAST BRANCH

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ G KAWA AND ASSOCIATES
EngineerKartik M Chopda
Chartered AccountantVISHESH D SANGOI
PartnerRole in project
SIDAAN ENTERPRISE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013775May 2022 → Aug 2023

Reason as filed by the promoterGrant of additional FSI

EXT51900011845May 2022 → Feb 2023

Reason as filed by the promoterReceived additional FSI

EXT51900027838May 2022 → Oct 2023

Reason as filed by the promoterTo,MahaRERA Subject : As per the order no 24/2021 A (ii) promoter has to apply for an extension which will be valid upto the date upto date of the occupation certificate, post facto extension may be granted. Project Registration No : P51900023932 Respected Sir, This is to inform you that our completion date of the above mentioned project was 30.05.2022. We have completed our project in all aspects and we have also received the occupation certificate for project name SADHANAA BUILDING on 16.10.2023 As per the order no 24/2021 A (ii) promoter has to apply for an extension which will be valid upt

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503852Preet Jayant ChhedaDina Mitul Pal03/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Oct 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: RERA Architect Completeion Form 4 (1).pdf11 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: RERA Architect Completeion Form 4.pdf29 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: RERA Architect Completeion Form 4.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SCAN Form 5-New Format SIGN.pdf18 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed (1).pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCAN FORM 3.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A.pdf1 Mar 2023
Disclosure of sold/ booked inventoryFile: Developer Sale Declaration as on 01-03-2023.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5.pdf1 Mar 2023
Declaration about Commencement CertificateFile: Format D.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance certificate.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf30 Jan 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf19 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certifciate_compressed (1).pdf19 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf19 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21_compressed.pdf19 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf5 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifciate_compressed.pdf5 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1750 FN 31dec21.pdf14 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf16 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf14 Jul 2021
Layout approvalFile: noc for no layout.pdf6 Jan 2020
Copy of Layout Approval (in case of layout)File: noc for no layout.pdf6 Jan 2020
Proforma of Allotment letterFile: Agreement for Sale-Sidaan.pdf25 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERAFORM3.pdf10 Dec 2019
Building plan approvalFile: 5 IOD 12052018.pdf22 Nov 2019
Details of encumbrancesFile: encumbrance certificate.pdf22 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 IOD 12052018.pdf22 Nov 2019
Declaration in FORM BFile: 1.pdf22 Nov 2019
Declaration in FORM BFile: 2.pdf22 Nov 2019
PAN CardFile: 1 PAN Card.pdf14 Nov 2019
Copy of the legal title reportFile: 2 Title Report.pdf14 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 Commencement Certificate.pdf14 Nov 2019
Proforma of Allotment letterFile: 14 Proforma of Allotment Letter.pdf14 Nov 2019

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 17 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SADHANAA BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga780+ in Mumbai City

2 kmSADHANAA BUILDINGCompleted 91Lapsed / revoked 65Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 243 registered projects within 2 km.

Builder: SIDAAN ENTERPRISE

SIDAAN ENTERPRISE has 1 registration on MahaRERA, including SADHANAA BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if SADHANAA BUILDING is delayed beyond 18 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SADHANAA BUILDING?

The registered promoter entity is SIDAAN ENTERPRISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SADHANAA BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SADHANAA BUILDING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SADHANAA BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SADHANAA BUILDING?

The professionals named in the filing: Architect: J G KAWA AND ASSOCIATES; Engineer: Kartik M Chopda; Chartered Accountant: VISHESH D SANGOI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SADHANAA BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SADHANAA BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SADHANAA BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.