Home / Browse projects / Thane, Maharashtra / Sadguru Symphony - Wing - A, D, E, F and G of Phase-II
Sadguru Symphony - Wing - A, D, E, F and G of Phase-II
RG-MH-29463 · RERA P51700029442 · Last updated on MahaRERA portal: 25 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 30 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sadguru Symphony - Wing - A, D, E, F and G of Phase-II is a Residential / Group Housing project by SADGURU INFRA in Thane, Maharashtra, registered with MahaRERA as P51700029442 on 29 May 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing.
At a glance
Project
- NameSadguru Symphony - Wing - A, D, E, F and G of Phase-II
- TypeResidential / Group Housing
- Location
- Valivali
- Badlapur West
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700029442
- ReraGenie IDRG-MH-29463
Builder
- NameSADGURU INFRA
- Entity typePartnership
- GSTIN27ACEFS3590H3ZT
- PartnersKiritkumar Rannchhodbhai Patel, Jyoti Kirit patel, Sanjay Narsinh Patel, Anil Narsinh Patel, Pravin Maganbhai Patel, Piyush Dhansukhbhai Patel, Rameshbhai Devjibhai Patel, Vijaykumar Somalal Patel
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
- Buildings5 building records
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 8 | 8 | 0 | 0 | 0 |
| Wing D | NA | 8 | 8 | 0 | 0 | 0 |
| Wing E | NA | 5 | 5 | 0 | 0 | 0 |
| Wing F | NA | 5 | 5 | 0 | 0 | 0 |
| Wing G | NA | 2 | 2 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 25 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 75%.
Wing A45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing E53%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing F45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Vilas V Chaudhari | Badlapur (M Cl) | Thane |
| Dnyaneshwar M Gawali | Badlapur (M Cl) | Thane |
| Arun M Gawali | Badlapur (M Cl) | Thane |
| Parmod V Chaudhari | Badlapur (M Cl) | Thane |
| Praveen D Gawali | Badlapur (M Cl) | Thane |
| Prasad D Gawali | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Raj Associates |
| Engineer | K R PATEL & ASSOCIATES |
| Engineer | KAMLESHKUMAR R PATEL |
| Chartered Accountant | H V PATEL & ASSOCIATES |
| Chartered Accountant | HARESHKUMAR V PATEL |
| Chartered Accountant | SVSV AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SADGURU INFRA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 59 % allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sadguru Symphony Form - 1.pdf | 25 Mar 2025 |
| Other - TechnicalFile: Sadguru Symphony Form - 4.pdf | 25 Mar 2025 |
| Declaration in FORM BFile: RERA EXTENSION NOTARY.pdf | 7 Oct 2024 |
| Declaration in FORM BFile: RERA EXTENSION NOTARY.pdf | 7 Oct 2024 |
| Declaration in FORM BFile: RERA EXTENSION NOTARY.pdf | 7 Oct 2024 |
| Declaration in FORM BFile: RERA EXTENSION NOTARY.pdf | 7 Oct 2024 |
| Layout approvalFile: 1Building Layout_compressed.pdf | 16 Aug 2024 |
| Building plan approvalFile: A A1.pdf | 16 Aug 2024 |
| Building plan approvalFile: D E F Builtup.pdf | 16 Aug 2024 |
| Building plan approvalFile: D E F G carpet.pdf | 16 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: 1Building Layout_compressed.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: A A1.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: D E F Builtup.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: D E F G carpet.pdf | 16 Aug 2024 |
| Declaration in FORM BFile: KIRITKUMAR R PATEL.pdf | 16 Aug 2024 |
| Declaration in FORM BFile: ALL-Landowner Form B.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 ( 31-03-24 ).pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 ( 30-06-24 ).pdf | 16 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 ( 31-03-24 ).pdf | 16 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 ( 30-06-24 ).pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - 21-22.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - 22-23.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - 23-24.pdf | 16 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Infra - Sold Unsold Inventory ( 31-03-24 ).pdf | 16 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Infra - Sold Unsold Inventory ( 30-06-24 ).pdf | 16 Aug 2024 |
| CERSAI detailsFile: CERSAI -SADGURU INFRA.pdf | 16 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 ( 31-03-24 ).pdf | 16 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 ( 30-06-24 ).pdf | 16 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Partner Declaration.pdf | 16 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SADGURU INFRA FORM 5 - 31-03-2022.pdf | 16 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SADGURU INFRA FORM 5 - 31-03-2023.pdf | 16 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SADGURU INFRA FORM 5 - 31-03-2024.pdf | 16 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: BANK ACCOUNT - SADGURU INFRA.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 18 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 18 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 18 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 18 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_compressed.pdf | 2 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGEENIER.pdf | 2 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed.pdf | 2 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sadguru Infra - Form 1_compressed.pdf | 31 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sadguru Infra Form - 2.pdf | 31 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sadguru Infra Form - 3_compressed.pdf | 31 May 2022 |
| Copy of the legal title reportFile: Title_Gut No17_RERA.pdf | 22 May 2021 |
| Copy of the legal title reportFile: Title_Gut No124_RERA.pdf | 22 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 1 May 2021 |
| Layout approvalFile: 1 Building Layout-converted-compressed.pdf | 23 Feb 2021 |
| Building plan approvalFile: 2 A A1-converted-compressed.pdf | 23 Feb 2021 |
| Building plan approvalFile: 3 D E F G_Carpet-converted-compressed.pdf | 23 Feb 2021 |
| Building plan approvalFile: 4 D E F_Built Up-converted-compressed.pdf | 23 Feb 2021 |
| PAN CardFile: Sadguru Infra_Pan.pdf | 23 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: 1 Building Layout-converted-compressed.pdf | 23 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 A A1-converted-compressed.pdf | 23 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 D E F G_Carpet-converted-compressed.pdf | 23 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 D E F_Built Up-converted-compressed.pdf | 23 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 02-03-2020.pdf | 23 Feb 2021 |
| Declaration in FORM BFile: Form_B Sadguru Infra.pdf | 23 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Updated-compressed 1MB.pdf | 23 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Feb 2021 |
| Proforma of Allotment letterFile: Draft sale Deed_Symphony.pdf | 23 Feb 2021 |
| Details of encumbrancesFile: Sadguru infra-Non Encumbrances Certificate.pdf | 22 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Sadguru Symphony - Wing - A, D, E, F and G o on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Badlapur West7,600+ in Thane
Filed coordinates, straight-line distance. 307 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: SADGURU INFRA
SADGURU INFRA has 3 registrations on MahaRERA, including Sadguru Residency and Sadguru Symphony, Wing - D of Phase - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Sadguru Symphony - Wing - A, D, E, F and G of Phase-II is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sadguru Symphony - Wing - A, D, E, F and G of Phase-II?
The registered promoter entity is SADGURU INFRA, a partnership as per the filing. Its GSTIN 27ACEFS3590H3ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sadguru Symphony - Wing - A, D, E, F and G of Phase-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sadguru Symphony - Wing - A, D, E, F and G of Phase-II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sadguru Symphony - Wing - A, D, E, F and G of Phase-II?
The professionals named in the filing: Architect: Raj Associates; Engineer: K R PATEL & ASSOCIATES; Engineer: KAMLESHKUMAR R PATEL; Chartered Accountant: H V PATEL & ASSOCIATES; Chartered Accountant: HARESHKUMAR V PATEL; Chartered Accountant: SVSV AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sadguru Symphony - Wing - A, D, E, F and G of Phase-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback