ReraGenieLog inGet a buyer report

Home / Browse projects / SACH VINTAGE

Completed No litigation declared Residential / Group Housing project

SACH VINTAGE

By USHADEVI VIJAYKUMAR CHANDAN

RG-MH-90469 · RERA P51900033147 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
22 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

SACH VINTAGE is a Residential / Group Housing project by USHADEVI VIJAYKUMAR CHANDAN in GIRGAON, 400004, registered with MahaRERA as P51900033147 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 0 of the 22 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSACH VINTAGE
  • TypeResidential / Group Housing
  • Location
    • Khetwadi First Lane
    • GIRGAON
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900033147
  • ReraGenie IDRG-MH-90469

Builder

  • NameUSHADEVI VIJAYKUMAR CHANDAN
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed46 files

Current status

0%0 of 22 units booked
91.5%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SACH VINTAGENA121016622

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SACH VINTAGE: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area408 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2026

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI1664.07
Proposed, not sanctioned1,664 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2nd floor 10/12 Mumbai Samachar Marg Fort Mumbai 400001
Estimated costRs 12.30 cr
Cost incurredRs 11.25 cr
Work done91.49%
BuildingWingEstimatedIncurred
SACH VINTAGENARs 12.30 crRs 11.25 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio changani
EngineerMr. Achyut Watve JW Consultants LLP
EngineerMOHAMMED SHAKIL A GHANCHI
Chartered AccountantM s Monali Mistry & Associates
PartnerRole in project
USHADEVI VIJAYKUMAR CHANDAN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Apr 2025

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (2).pdf22 May 2026
Withdrawal Update Form 1File: Form 1 (2).pdf22 May 2026
Withdrawal Update Form 1File: Form 1 (2).pdf22 May 2026
Withdrawal Update Form 1File: Form 1 (2).pdf22 May 2026
Withdrawal Update Form 2File: Annexure 2 (2).pdf22 May 2026
Withdrawal Update Form 2File: Annexure 2 (2).pdf22 May 2026
Withdrawal Update Form 2File: Annexure 2 (2).pdf22 May 2026
Withdrawal Update Form 2File: Annexure 2 (2).pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Occupational CertificateFile: 2455421_OC_signed.pdf22 May 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RERA FORM 4.pdf8 Apr 2025
Building plan approvalFile: Plan.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure 2 (2).pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021 - 22.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022 - 23.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 APRIL to DEC 2024.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: certificate-1.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: certificate of sach vintage.pdf20 Feb 2023
Proforma of Agreement for saleFile: agreement for sale.pdf3 Feb 2023
Layout approvalFile: DRAWING SACH_1.pdf4 Feb 2022
Building plan approvalFile: DRAWING SACH_1.pdf4 Feb 2022
Copy of Layout Approval (in case of layout)File: DRAWING SACH_1.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: DRAWING SACH_1.pdf4 Feb 2022
Declaration in FORM BFile: form b 1.pdf24 Jan 2022
CERSAI detailsFile: cersai sach realtry.pdf13 Jan 2022
Proforma of Allotment letterFile: agreement for sale.pdf8 Jan 2022
Layout approvalFile: location plan.pdf7 Jan 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT(1).pdf7 Jan 2022
Details of encumbrancesFile: encumbrances.pdf7 Jan 2022
Copy of Layout Approval (in case of layout)File: location plan.pdf7 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: VC Further CC.pdf7 Jan 2022
Declaration about Commencement CertificateFile: Declaration for CC.pdf7 Jan 2022
Declaration in FORM BFile: form b.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate_compressed.pdf7 Jan 2022
Proforma of Allotment letterFile: allotment.pdf7 Jan 2022
PAN CardFile: USHA V CHANDAN pan.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate-RERA form.pdf6 Jan 2022

Keep SACH VINTAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GIRGAON

2 kmSACH VINTAGECompleted 12Lapsed / revoked 24Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: USHADEVI VIJAYKUMAR CHANDAN

USHADEVI VIJAYKUMAR CHANDAN has 1 registration on MahaRERA, including SACH VINTAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if SACH VINTAGE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SACH VINTAGE?

The registered promoter entity is USHADEVI VIJAYKUMAR CHANDAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SACH VINTAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SACH VINTAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SACH VINTAGE?

The professionals named in the filing: Architect: Studio changani; Engineer: Mr. Achyut Watve JW Consultants LLP; Engineer: MOHAMMED SHAKIL A GHANCHI; Chartered Accountant: M s Monali Mistry & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SACH VINTAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SACH VINTAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SACH VINTAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.