Saarrthi Swadesh
RG-MH-09581 · RERA P52100003849 · Last updated on MahaRERA portal: 10 Feb 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 70 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Saarrthi Swadesh is a Residential / Group Housing project by Siddharth Properties in Pune, Maharashtra, registered with MahaRERA as P52100003849 on 6 Aug 2017. The registration is recorded completed; possession was promised by 19 Jul 2024. The completion date has moved by 70 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameSaarrthi Swadesh
- TypeResidential / Group Housing
- Location
- Jambhul
- Mawal
- Pune
- 412106
- Pincode412106
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100003849
- ReraGenie IDRG-MH-09581
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Aug 2017
- Promised completion19 Jul 2024
- Revised completionRevised to 19 Jul 2024 (originally 30 Sep 2018)
- Buildings4 building records
- Documents filed99 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Arya A | NA | 9 | 0 | 0 | 0 | 0 |
| Arya B | NA | 9 | 0 | 0 | 0 | 0 |
| Arya C | NA | 9 | 0 | 0 | 0 | 0 |
| Arya D | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 10 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
Arya A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Arya B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Arya C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Arya D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed314
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Arya A | 32 | 45 | 77 |
| Arya B | 28 | 55 | 83 |
| Arya C | 32 | 45 | 77 |
| Arya D | 32 | 45 | 77 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shivaji Pandhurang Bhagwat | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhikalpan Architects & planners |
| Architect | Gohad Architect |
| Engineer | Hansal Parikh & Associates |
| Chartered Accountant | H N V & Co |
| Chartered Accountant | CA Saransh Dey |
| Partner | Role in project |
|---|---|
| Siddharth Properties | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe state that we have submitted 30th Sep 2018 as the date of possession of the Said Buildings before RERA authority. However due to force majeure conditions like unavailability of steel, cement, sand and situation beyond the control of the Promoter a revised date of possession is being declared
Reason as filed by the promoterForce majeure conditions like torrential rains leading to water accumulating at site resulting on ground becoming inaccessible, stoppage of work due to heavy rainfall, damage to material and works.
Reason as filed by the promoterWe have received Full Occupancy Certificate dated 19/07/2024. We want to apply for extension ispo facto till the date of Occupancy Certificate.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000023079 | Gulabchand Tiwari | Siddharth Properties | 29/05/2019 |
| CC005000000054111 | KIshor Parashuram Bartakke | Saarrthi Swadesh | 04/03/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Jan 2025
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 10 Feb 2025 |
| Declaration in FORM BFile: Form B - Affidavit.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 24 Swadesh_Registration_E cert.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A - Revised format_Swadesh.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 24 Swadesh Architect Cert.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Swadesh_Dec 24 Sold Unsold Inventory Certificate.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA 5 Certificate - Saarrthi Swadesh.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate 01-10-2021 - A,C and D Wing.pdf | 14 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate 19-07-2024 - B Wing.pdf | 14 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Saarrthi Swadesh.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Swadesh.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 24 Swadesh Architect Cert.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Swadesh RERA Sold and Unsold.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Jun 24 SWADESH 1_Sold Unsold Inventory Certificate.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Swadesh Form 1 - June 24 Arch.pdf | 29 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Swadesh Form 2 - June 24 Eng.pdf | 29 Jul 2024 |
| Certificates of CA (Form 3)File: Swadesh Form 3 - June 24 CA.pdf | 29 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 24 Swadesh Architect Cert.pdf | 4 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 24 Swadesh_Registration_E cert.pdf | 4 May 2024 |
| Form 2AFile: Mar 24 Swadesh registration_Q cert.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: Mar 24 SWADESH_Sold Unsold Inventory Certificate.pdf | 4 May 2024 |
| Certificates of CA (Form 3)File: C A Cretificate - Swadesh.pdf | 4 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 23 Swadesh Architect Cert.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 23 Swadesh form 2.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Swadesh.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Swadesh_compressed.pdf | 24 Jul 2023 |
| Certificates of CA (Form 3)File: Saarrthi Swadesh_compressed.pdf | 24 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Jun 23_Swadesh.pdf | 19 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_M23_Swadesh.pdf | 18 Apr 2023 |
| Certificates of CA (Form 3)File: Form 03 Saarrthi Swadesh_compressed.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_M23_Swadesh.pdf | 17 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_March23_Saarrthi Swadesh_C.pdf | 15 Apr 2023 |
| Certificates of CA (Form 5)File: Form5_Swadesh_March22 .pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_Swadesh_March22 .pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No2 Savvy2_Dec22_c.pdf | 11 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No2 Swadesh_Dec22.pdf | 11 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 22_Saarrthi Swadesh_c.pdf | 7 Feb 2023 |
| Certificates of CA (Form 3)File: Form No3 Swadesh_Dec22_compressed.pdf | 7 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22 Swadesh registration_Q cert.pdf | 10 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No1 Saarrthi Swadesh_Sept22_c.pdf | 5 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No2 Saarrthi Swadesh_Sept22_c.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: Form No3 Saarrthi Swadesh_Sept22_c.pdf | 5 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Swadesh_June22_compressed.pdf | 19 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Jun 22_Saarrthi Swadesh.pdf | 10 Aug 2022 |
| Certificates of CA (Form 3)File: Form3_Jun 22_Saarrthi Swadesh_compressed.pdf | 10 Aug 2022 |
| Certificates of CA (Form 3)File: Form3_March 22_Saarrthi Swadesh_c.pdf | 27 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saarrthi Swadesh -2.pdf | 28 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 22 Swadesh_Registration_E cert.pdf | 28 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar 22 Swadesh registration_Q cert.pdf | 28 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_March21_Saarrthi Swadesh.pdf | 28 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 21 Swadesh Ar Certificate.pdf | 31 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 21 Swadesh Engg Certificate.pdf | 31 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SWADESH_FORM 2A.pdf | 11 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf | 11 Nov 2021 |
| Certificates of CA (Form 3)File: SWADESH.pdf | 3 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SAARRTHI SWADESH.pdf | 3 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Swades_Discloser of Sold Unsold.pdf | 12 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Swades_Discloser of Sold Unsold.pdf | 12 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Swadesh_Ar Certificate_Sept (1).pdf | 6 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SWADESH_FORM 2.pdf | 6 Oct 2021 |
| Form 2AFile: SWADESH_FORM 2A.pdf | 6 Oct 2021 |
| Declaration about Commencement CertificateFile: Swadesh.pdf | 18 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Swadesh.pdf | 18 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SWADESH ARCHITECT CERTIFICATE FORM 1.pdf | 15 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SWADESH ARCHITECT CERTIFICATE FORM 1.pdf | 15 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SWADESH ENGINEER CERTIFICATE FORM 2.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Form3-Swadesh.pdf | 15 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer Swadesh.pdf | 26 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Saarrthi Swadesh.pdf | 26 Jul 2021 |
| Form 2AFile: Saarrthi Swadesh - Form 2A.pdf | 26 Jul 2021 |
| Certificates of CA (Form 5)File: SAARRTHI SWADESH.pdf | 21 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Swadesh-compressed.pdf | 9 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Swadesh.pdf | 9 Feb 2021 |
| Form 2AFile: Swadesh.pdf | 9 Feb 2021 |
| Certificates of CA (Form 5)File: Form 5- Swadesh- Scanned.pdf | 13 Dec 2019 |
| Form 2AFile: Engineers Certificate - Saarrthi Swadesh - Form - 2A 31-03-2019.pdf | 15 Apr 2019 |
| Certificates of CA (Form 5)File: Form 5 - Saarrthi Swadesh.pdf | 2 Jan 2019 |
| Declaration in FORM BFile: Promoter form B.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: FORM - 3 - C A LETTER - SWADESH.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: ATS_Proforma_swadesh.pdf | 29 Jul 2017 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Souvenir | S.NO 15- 6- 1 MAU MAHALUNGE TAL MULSHI PUNE | 246 | Completed | May 2016 | Jul 2015 |
| Shimmer and Shine | S NO 19 HINGNE KHURD | 147 | Completed | Mar 2016 | Late, Apr 2016 |
| Sovereign | MARUNJI TAL MULSHI PUNE | 259 | Completed | Dec 2015 | Mar 2015 |
| Signor | S NO 273 HINJEWADI TAL MULSHI PUNE | 129 | Completed | Sep 2013 | May 2013 |
| Satin Hills | S NO 37 BAVDHAN BK PUNE 411021 | 101 | Completed | Dec 2010 | Late, Jan 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
Keep Saarrthi Swadesh on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jambhul13,700+ in Pune
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
Residential Building on CTS No 107/1P -GIRIVAR
SHRIVAR BUILDERS LLP
Aranya
Naiknavare Township LLP.
Land of Dreams
Krisala Buildscape LLP
Mount Vista
Tirupati Lands and Building Constructions
Osian LifeLands 2
Planet-i Realty
RKL INDRAYANI CITY
R K LUNKAD HOUSING COMPANY
Builder: Siddharth Properties
Siddharth Properties has 9 registrations on MahaRERA, including Saarrthi Skybay and Success Square. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Saarrthi Swadesh is delayed beyond 19 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Saarrthi Swadesh?
The registered promoter entity is Siddharth Properties, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Saarrthi Swadesh?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Saarrthi Swadesh?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Saarrthi Swadesh?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Saarrthi Swadesh?
The professionals named in the filing: Architect: Abhikalpan Architects & planners; Architect: Gohad Architect; Engineer: Hansal Parikh & Associates; Chartered Accountant: H N V & Co; Chartered Accountant: CA Saransh Dey. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Saarrthi Swadesh?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback