Home / Browse projects / Pune, Maharashtra / Saarrthi Skybay III

Registered Litigation declared Residential / Group Housing project

Saarrthi Skybay III

By Siddharth Properties

RG-MH-13053 · RERA P52100022081 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 33 months
  • 1 extension taken
  • Rs 10.00 crore secured on the land, in favour of PRABODH ARTHASANCHAY PVT LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 33 months from the original
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 42%
91 of 318Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

Saarrthi Skybay III is a Residential / Group Housing project by Siddharth Properties in Pune, Maharashtra, registered with MahaRERA as P52100022081 on 25 Aug 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 33 months from the original filing. 227 of the 318 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameSaarrthi Skybay III
  • TypeResidential / Group Housing
  • Location
    • mahalunge
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022081
  • ReraGenie IDRG-MH-13053

Builder

  • NameSiddharth Properties
  • Entity typePartnership
  • GSTIN27AAZFS3607C1ZY
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAbhijeet Vasant Shende, Nilesh Vasant Shende, Swapneel Shashikant Shende
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredAug 2019First promiseMar 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2024)
  • Buildings2 building records
  • Documents filed141 files

Current status

71%227 of 318 units booked
54.4%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA29211620162
Building BNA29201560156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 42%.

Building A58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed298

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots298
Closed/Covered243
Open Space55
BuildingClosed/CoveredOpen SpaceTotal
Building A14030170
Building B10325128

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,102 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofPRABODH ARTHASANCHAY PVT LTD
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on31 Oct 2025
LandownerVillageDistrict
Ramdas Baban KolekarPune (M Corp.)Pune
Tuka Vithu KolekarPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Devlopment Authority Pune
Permissible FSI19585.05
Proposed, not sanctioned19,585 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune
Estimated costRs 86.55 cr
Cost incurredRs 47.05 cr
Work done54.36%
BuildingWingEstimatedIncurred
Building ANARs 46.67 crRs 21.89 cr
Building BNARs 35.34 crRs 22.67 cr
-NARs 4.54 crRs 2.49 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIdeal Design Architects
ArchitectAbhikalpan Architects & planners
EngineerVishal Khopkar
EngineerRAVIRAJ KARANDE
Chartered AccountantCA Saransh Dey
Chartered AccountantH N V & CO
Chartered AccountantNITESH M SHAH & CO
PartnerRole in project
Siddharth Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011133Mar 2024 → Dec 2026

Reason as filed by the promoterDue to lockdown the project when originally registered could not be launched and started work upon. No bookings were taken under the original completion date of 30/03/2024. We have obtained 100% consent of existing allottees to change date to 31/12/2026 as per attached consent u/s 14(2) read with circular 28/2021

Litigation declared1

CaseCourtStatus
RCS/1757/2022Civil judge junior division PuneDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf10 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf10 Jul 2026
Withdrawal Update Form 3File: Form III - Skybay II March 2026.pdf10 Jul 2026
Withdrawal Update Form 1File: Sept 25 Skybay III Architect Cert.pdf8 Dec 2025
Withdrawal Update Form 2File: Engineers Certificate - 30-09-2025 - Skybay III.pdf8 Dec 2025
Withdrawal Update Form 3File: Form 3 - Skybay III - Sept 2025.pdf8 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - FY 24-25 - Skybay 3 (1).pdf29 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf4 Oct 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf4 Oct 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DATED 30-06-2025.pdf4 Oct 2025
Form 1File: Mar 25 Skybay III Architect Cert.pdf30 May 2025
Form 2File: Mar 25 Skybay 3.pdf30 May 2025
Form 3File: C A Certificate - Form 3 - Saarrthi Skybay lll.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Skybay lll sold unsold.pdf30 May 2025
Disclosure of sold/ booked inventoryFile: Skybay lll sold unsold.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 25 Skybay III Architect Cert.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar 25 Skybay 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 24 A B Skybay III Registration E cert.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Saarrthi Skybay III.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 24 Skybay III Architect Cert.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Skybay III Dec 24 Sold Unsold Inventory Certificate.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: skybay iii.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SKYBAY III.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skybay III Sept 2024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 24 Skybay III Architect Cert_page-0001.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Skybay III RERA Sold and Usold.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Saarrthi Skybay III - Siddharth Properties.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Jun 24 SKYBAY III_Sold Unsold Inventory Certificate.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saarrthi Skybay III Form 1 - Arch - June 24.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saarrthi Skybay III Form 2 - Eng - June 24.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saarrthi Skybay-III Form 3 - CA - June 24.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Mar 24 AB Skybay_iii.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: Mar 24 SKYBAY III_Sold Unsold Inventory Certificate.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 24 Skybay III Architect Cert.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar 24 Skybay III_Registration_E cert.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Cretificate - Skybay III.pdf29 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Skybay 3.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 23 Skybay III Architect Cert.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 23 ABSkybay III registration_E cert.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skybay III.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Skybay3_Sept23_compressed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skybay3_Sept23_compressed.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skybay3_Sept23_compressed.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saarrthl Skybay III_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 23_Skybay 3.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Skybay3_compressed.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March23_SKYBAY III.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_M23_Skybay 3.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_M23_Skybay3.pdf18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Saarrthi Skybay 3.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 22_Skybay lII.pdf9 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Skybay3_Dec22_c.pdf9 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No3 Skybay3_Dec22_compressed.pdf7 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22 SkybayIlI_Registration_Q cert.pdf10 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_SkybayIII_March22_c.pdf10 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_SkybayII_Sept22.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_SkybayIII_Sept22_c.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_SkybayIII_Sept22_c.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 22_Skybay III.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate saarrthi skybay lll_compressed.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3 in Saarrthi Skybay 3_compressed.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2_Mar 22 AB_Skybay_Registration_E cert.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No3_Skybay III_March22_c.pdf18 Jul 2022
Proforma of Allotment letterFile: Agreement - RERA- A- - RERA uploaded.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saarrthi Skybay III.pdf28 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar 22 ABSkybay_Registration_Q cert.pdf28 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_March21_Skybay III.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 21 Skybay III Ar Certificate.pdf31 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Dec 21 Skybay III Engg Certificate.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKYBAY-III.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SKYBAY -III_FORM 2A.pdf30 Oct 2021
Declaration in FORM BFile: Affidavit Cum Declaration - Skybay.pdf19 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skybay III Form 3_Sept21.pdf19 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT 21 Skybay III Architect Cert.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: SKYBAY-III_Discloser of Sold Unsold.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKYBAY-III_FORM 2.pdf6 Oct 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SouvenirS.NO 15- 6- 1 MAU MAHALUNGE TAL MULSHI PUNE246CompletedMay 2016Jul 2015
Shimmer and ShineS.NO 19 HINGNE KHURD147CompletedMar 2016Late, Apr 2016
SovereignMARUNJI TAL MULSHI PUNE259CompletedDec 2015Mar 2015
SignorS.NO 273 HINJEWADI TAL MULSHI PUNE.129CompletedSep 2013May 2013
Satin HillsS no 37 Bavdhan BK Pune 411021101CompletedDec 2010Late, Jan 2011

How this compares with Pune

71%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 33 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Saarrthi Skybay III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalunge13,700+ in Pune

2 kmSaarrthi Skybay IIICompleted 94Lapsed / revoked 35Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: Siddharth Properties

Siddharth Properties has 9 registrations on MahaRERA, including Saarrthi Skybay and Success Square. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Saarrthi Skybay III is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Saarrthi Skybay III?

The registered promoter entity is Siddharth Properties, a partnership as per the filing. Its GSTIN 27AAZFS3607C1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Saarrthi Skybay III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Saarrthi Skybay III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Saarrthi Skybay III?

The professionals named in the filing: Architect: Ideal Design Architects; Architect: Abhikalpan Architects & planners; Engineer: Vishal Khopkar; Engineer: RAVIRAJ KARANDE; Chartered Accountant: CA Saransh Dey; Chartered Accountant: H N V & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saarrthi Skybay III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saarrthi Skybay III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saarrthi Skybay III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.