Home / Browse projects / Kolhapur, Maharashtra / S.B. HEIGHTS
S.B. HEIGHTS
RG-MH-48205 · RERA P53000018982 · Last updated on MahaRERA portal: 31 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 43 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
S.B. HEIGHTS is a Residential / Group Housing project by SIDRA DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000018982 on 28 Dec 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 43 months from the original filing.
At a glance
Project
- NameS.B. HEIGHTS
- TypeResidential / Group Housing
- Location
- shahapur road
- sangli naka
- Ichalkaranji (M Cl)
- Hatkanangle
- Kolhapur
- 416115
- Pincode416115
- RERA no.P53000018982
- ReraGenie IDRG-MH-48205
Builder
- NameSIDRA DEVELOPERS
- Entity typePartnership
- PartnersSabiha Firoj Shikalagar, samir shabbir shaikh, Shirin Samir Shaikh
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Dec 2018
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 14 May 2022)
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SBHEIGHTS | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
SBHEIGHTS: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Varsha A Shinde |
| Architect | Rahul R Shreshthi |
| Engineer | Amar Dhumal |
| Partner | Role in project |
|---|---|
| SIDRA DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to covid 19 second layer and probability of third layer scope of work was not completed.
Reason as filed by the promoterDue to manpower shortages in our area, the completion of project is delayed. now we have arranged such team and calculated the total time required for completion. kindly sanction such extension for the project.
Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority (MAHARERA) Subject: Request for Extension of MAHARERA Project Completion Deadline by 31/07/2024 Respected Sir/Madam, We,SIDRA DEVELOPER, the promoters of the project S B HIGHTS registered under MAHARERA with registration number P53000018982, hereby submit this formal request for an extension of the project completion deadline. The unforeseen and unavoidable challenges listed below have significantly impacted the project's progress and completion timeline: 1. Worker Problem: The project has faced severe labour shortages due to various reasons
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Nov 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Nov 2024
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 01.pdf | 31 Jul 2025 |
| Form 2File: FORM 02.pdf | 31 Jul 2025 |
| Form 3File: FORM 3 C0001.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 31 Jul 2025 |
| Declaration in FORM BFile: 3 NOTARY.pdf | 28 Jun 2025 |
| Certificates of CA (Form 3)File: FORM 3_compressed.pdf | 28 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure sold unsold.pdf | 28 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 28 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest (1).pdf | 28 Jun 2025 |
| Declaration in FORM BFile: 3 NOTARY.pdf | 21 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1A FORM 1.pdf | 21 Jun 2025 |
| Certificates of CA (Form 3)File: 1D FORM 3 CA.pdf | 21 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1B FORM 2.pdf | 21 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 2 SOLD UNSOLD INVENTORY.pdf | 21 Jun 2025 |
| CERSAI detailsFile: 4 CERSAI details.pdf | 21 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 6 SEPEARATE BANK DESCLOSURE.pdf | 21 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5A Annexure A samir shaikh.pdf | 21 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5B Annexure A shirin samir shaikh.pdf | 21 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5C Annexure A Firoj B shikalgar.pdf | 21 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5D Annexure A sabiha firoj shikalgar.pdf | 21 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1C A FORM -2A QUALITY ASSURANCE.pdf | 21 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1E FORM 5 2022 -23.pdf | 21 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1C A FORM -2A QUALITY ASSURANCE.pdf | 21 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1E FORM 5 2023 - 24.pdf | 21 Jun 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECH CERTIFICATE.pdf | 4 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECH CERTIFICATE.pdf | 14 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf | 14 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEW Form 2.pdf | 18 Feb 2023 |
| Certificates of CA (Form 3)File: NEW FORM 3.pdf | 18 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDFGallery_20230216_223314_compressed (1).pdf | 16 Feb 2023 |
| Proforma of Agreement for saleFile: agreement to sale.pdf | 5 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA 2021 22.pdf | 22 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA 2021 22.pdf | 22 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: declaration of encumbrance.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to LegalFile: declaration of encumbrance.pdf | 19 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2019 to 2021.pdf | 19 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE 2.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: Re upload Form 3.pdf | 19 Jan 2023 |
| Certificates of CA (Form 5)File: Re upload Form 5.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019 to 2021.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020 to 2021.pdf | 19 Jan 2023 |
| Certificates of CA (Form 5)File: CA 1.pdf | 9 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: 11zon_JPEG-to-PDF.pdf | 30 May 2022 |
| Proforma of Allotment letterFile: allotment letter s b heights.pdf | 7 May 2022 |
| Proforma of Allotment letterFile: consent 1-converted.pdf | 5 May 2022 |
| Details of encumbrancesFile: declaration of encumbrance.pdf | 25 Apr 2022 |
| Declaration about Commencement CertificateFile: declaration of commencement.pdf | 25 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE 2.pdf | 25 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE 2.pdf | 25 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER A-converted_11zon.pdf | 25 Apr 2022 |
| CERSAI detailsFile: CERSAI.pdf | 25 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19 ANUAL REPORT.pdf | 25 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20 ANUAL REPORT.pdf | 25 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021-21 ANUAL REPORT.pdf | 25 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy part completion.pdf | 25 Apr 2022 |
| CERSAI detailsFile: Original final sanction drawing-compressed_11zon.pdf | 9 Mar 2022 |
| Declaration about Commencement CertificateFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 11 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecture Certificate.pdf | 26 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architecture Certificate.pdf | 26 Nov 2018 |
| Layout approvalFile: LAYOUT PLAN.pdf | 24 Nov 2018 |
| Building plan approvalFile: AMAL COMMISSION PLAN sanction drg.pdf | 24 Nov 2018 |
| PAN CardFile: pancard 4.pdf | 24 Nov 2018 |
| Copy of the legal title reportFile: search report.pdf | 24 Nov 2018 |
| Details of encumbrancesFile: 7-12 encumb.pdf | 24 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 24 Nov 2018 |
| Building Plan Approval (IOD)File: AMAL COMMISSION PLAN sanction drg.pdf | 24 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: nakasha manjuri patra.pdf | 24 Nov 2018 |
| Declaration in FORM BFile: Form B3.pdf | 24 Nov 2018 |
| Certificates of CA (Form 3)File: CA form 3 5.pdf | 24 Nov 2018 |
| Certificates of CA (Form 5)File: CA form 3 5.pdf | 24 Nov 2018 |
| Proforma of Allotment letterFile: d-1.pdf | 24 Nov 2018 |
| Declaration in FORM BFile: Form B1.pdf | 23 Nov 2018 |
| Declaration in FORM BFile: Form B.pdf | 23 Nov 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep S.B. HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near sangli naka880+ in Kolhapur
Gajalaxmi Park
Amit Yashwant Singh and Others
Vrindavan Paradise
HBD DEVELOPERS
Vihanga Residency
INDO BUILDCON DEVELOPERS
CHOUNDESHWARI PLANET
VIJAY VIRUPAKSHA GALGALE
VATHARE ELITES
JAHIR CHANDSAB SOUDAGAR
NISARGAYAN
SIDRA DEVELOPERS
See every Kolhapur project, with the district possession charts
Builder: SIDRA DEVELOPERS
SIDRA DEVELOPERS has 2 registrations on MahaRERA, including S.B. HEIGHTS and NISARGAYAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that S.B. HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if S.B. HEIGHTS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of S.B. HEIGHTS?
The registered promoter entity is SIDRA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in S.B. HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for S.B. HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at S.B. HEIGHTS?
The professionals named in the filing: Architect: Varsha A Shinde; Architect: Rahul R Shreshthi; Engineer: Amar Dhumal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in S.B. HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback