Home / Browse projects / Thane, Maharashtra / Rutu Heights

Registered No litigation declared Others project

Rutu Heights

By HARASIDDH DEVELOPERS

RG-MH-05158 · RERA P51700050215 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
30 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

Rutu Heights is a Others project by HARASIDDH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700050215 on 27 Mar 2023. Possession is promised by 30 Jun 2027. 77 of the 107 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRutu Heights
  • TypeOthers
  • Location
    • Kolivali
    • Kalyan West
    • Chavindra
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700050215
  • ReraGenie IDRG-MH-05158

Builder

  • NameHARASIDDH DEVELOPERS
  • Entity typePartnership
  • PartnersMukul Patel, Mukund Patel, Pratapchandra Patel, Rushi Patel
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed132 files

Current status

72%77 of 107 units booked
69.4%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rutu HeightsNA22229017107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Rutu Heights: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered42
Open Space33

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,070 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI8753.6
Proposed, not sanctioned8,754 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAJIWADE, THANE WEST
Estimated costRs 35.04 cr
Cost incurredRs 24.33 cr
Work done69.42%
BuildingWingEstimatedIncurred
Rutu HeightsNARs 31.54 crRs 23.11 cr
-NARs 3.50 crRs 1.22 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCreation architect & interior designer
ArchitectCreations Architects & Interior Designers
EngineerMr. Kishor Kene
EngineerSandeep V Patil
Chartered AccountantD THAKKAR & CO
Chartered AccountantPooja V Jain & Co
PartnerRole in project
HARASIDDH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RH Form 1 Q4 QPR.pdf23 Apr 2026
Withdrawal Update Form 2File: RH Form 2 Q4 QPR.pdf23 Apr 2026
Withdrawal Update Form 3File: RH Form 3 Q4 QPR compressed.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Rutu Heights Withdrawal Application Form3.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf24 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE DTD 07-10-2025 - RH.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: Rutu heights.pdf30 Sep 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disc.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024 Rutu heights_compressed (1).pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RH ARCH UPTO 31122024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RH ENG UPTO 31122024.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RUTU HEIGHTS - ARCH CERT TILL MARCH 2024.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RUTU HEIGHTS - ENGINEER CERT TILL MARCH 2024.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RUTU HEIGHTS - CA CERT TILL MARCH 2024.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RUTU HEIGHTS 2022-23.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT- Rutu Heights New.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architec Certificate DEC23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate DEC23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate DEC 23.pdf12 Jan 2024
Layout approvalFile: Plan Rutu Height_1-1.pdf2 Nov 2023
Layout approvalFile: Plan Rutu Height_2-3.pdf2 Nov 2023
Layout approvalFile: Plan Rutu Height_4-end.pdf2 Nov 2023
Building plan approvalFile: Plan Rutu Height_1-1.pdf2 Nov 2023
Building plan approvalFile: Plan Rutu Height_2-3.pdf2 Nov 2023
Building plan approvalFile: Plan Rutu Height_4-end.pdf2 Nov 2023
Copy of Layout Approval (in case of layout)File: Plan Rutu Height_1-1.pdf2 Nov 2023
Copy of Layout Approval (in case of layout)File: Plan Rutu Height_2-3.pdf2 Nov 2023
Copy of Layout Approval (in case of layout)File: Plan Rutu Height_4-end.pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Rutu Height_1-1.pdf2 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Building No A Richmond of Rutu CIty ComplexNear Sanghvi Hill Behind D mart Kavesar G B road Thane West 400615232CompletedJun 2022Jun 2021

How this compares with Thane

72%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rutu Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan West7,600+ in Thane

Builder: HARASIDDH DEVELOPERS

HARASIDDH DEVELOPERS has 3 registrations on MahaRERA, including Building No. A, Richmond of Rutu City Complex and Rutu Heights. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Rutu Heights is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rutu Heights?

The registered promoter entity is HARASIDDH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rutu Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rutu Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rutu Heights?

The professionals named in the filing: Architect: Creation architect & interior designer; Architect: Creations Architects & Interior Designers; Engineer: Mr. Kishor Kene; Engineer: Sandeep V Patil; Chartered Accountant: D THAKKAR & CO; Chartered Accountant: Pooja V Jain & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rutu Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rutu Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rutu Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.