Registration lapsed No litigation declared Residential / Group Housing project

RUSTOMJEE CROWN - PHASE I

By Realgem Buildtech Private Limited

RG-MH-11591 · RERA P51900003268 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 65 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken
  • Rs 2,190.00 crore secured on the land, in favour of Axis Bank Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2024Possession promised22 months past this date
19 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 99%
65Complaints at MahaRERAon this registration
Jump to the 194 documents Report an error

RUSTOMJEE CROWN - PHASE I is a Residential / Group Housing project by Realgem Buildtech Private Limited in prabhadevi, 400025, registered with MahaRERA as P51900003268 on 5 Aug 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. The completion date has moved by 24 months from the original filing. 65 complaints are on record with the regulator.

At a glance

Project

  • NameRUSTOMJEE CROWN - PHASE I
  • TypeResidential / Group Housing
  • Location
    • Gokhale road
    • prabhadevi
    • 400025
  • Pincode400025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003268
  • ReraGenie IDRG-MH-11591

Builder

  • NameRealgem Buildtech Private Limited
  • Entity typeCompany
  • DirectorZubin Patel

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed194 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA710000
Tower BNA710000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 99%.

Tower A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities28

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Outdoor Swimming PoolYes0%
Jacuzzi Steam and SaunaYes0%
Indoor Lap PoolYes0%
In common with Phase IIYes0%
Children Play AreaYes0%
Welfare CentreYes0%
Changing RoomsYes0%
Sports and Recreation Activity AreaYes0%
Double Height Sports CourtYes0%
Society OfficeYes0%
Society Amusement AreaYes0%
Fitness CentreYes0%
Massage RoomYes0%

Parking filed929

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots929
Closed/Covered929
BuildingClosed/CoveredTotal
Tower A465465
Tower B464464

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area14,459 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAxis Bank Limited
Secured amountRs 2,190.00 crore
CERSAI search filedYes
Declared on9 Nov 2025
LandownerVillageDistrict
Bhishma Realty LimitedMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI78007.93
Proposed, not sanctioned76,658 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA/12, 1st Floor, A Wing, 210, Mittal Tower, Nariman Point, Baristar Rajni Patel Marg, Mumbai- 400021

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantV A Shimpi and Associates
PartnerRole in project
Realgem Buildtech Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900018220Dec 2022 → Dec 2024

Reason as filed by the promoter(1) On account of Covid-19 pandemic, the supply chains and logistics were adversely affected due to which there was extreme shortage of construction material and availability of equipment, mass labour shortage, import shipment delays which impacted the projected timelines for construction. (2) Geopolitical tensions have impacted supply of goods, equipment and materials to the said Real Estate Project. (3) The said Real Estate Project being of a very large scale is dependent upon overseas supplies which have taken a hit right from 2020. Several vendors have delayed in delivery of goods or attem

EXT51900011040Dec 2022 → Dec 2023

Reason as filed by the promoterDue to the several difficulties encountered by our project contractors owing to the difficulties posed due to the covid - 19 pandemic situation including restrictions on travel , transport and delivery of material and goods, curfew related restrictions that impacted the working hours of various industries and commute to work places , they may not be able to meet the previously estimated timelines for completing work of Facade, internal furnishing and lift installation, which is likely to affect the project completion timelines. In view thereof, we are estimating that we will not be able to com

Litigation declared14

CaseCourtStatus
SC Suit No 424 of 2011/2011City Civil Courtsuit is filed for executing AFS now the matter is pending before HC suit is stayed
SC Suit No 423 of 2011/2011City Civil Courtsuit is filed for executing AFS now the matter is pending before HC suit is stayed
CC No 4107409/SS/2017/2017Magistrate Court Shindewadidispossed off
Suit No 141 of 2017/2017High Court Bombaysuit is filed for executing AFS now the matter is kept for hearing on Notice of Motion
Suit No 840 of 2016/2016High Court Bombaysuit is filed for executing AFS now the matter is kept for hearing on Notice of Motion
Suit No 4064 of 2013/2013High Court BombayMotion pending for delay condonation in filing WS
WP 62 of 2016/2016High Court BombayThis WP is disposed of
CC 1426 of 2018/2018Delhi NCDRCMatter kept for hearing
WP No 5446 of 2017/2017High Court BombayMatter pending
CC No 2491/2018Delhi NCDRCmatter pending for hearing
4544/2019NCLTMatter Disposed off
4544/2019NCLTMatter Disposed off
4544/2019NCLTMatter Disposed off
4544/2019NCLTMater Disposed off

Complaints filed with MahaRERA65

Case no.ComplainantRespondentFiled
CC006000000000411PRADEEP BANKAREALGEM BUILDTECH PRIVATE LIMITED08/09/2017
CC006000000193924JAIKUMAR GUPTA HUFREAL GEM BUILDTECH PVT LTD10/09/2020
CC006000000195172JAIKUMAR GUPTA HUFREAL GEM BUILDTECH PVT LTD07/12/2020
CC006000000023635Bhavesh Gandhi HUFRealgem Buildtech Private Limited (DB Group)09/03/2018
CC006000000023654Nikhil Gandhi HUFRealgem Buildtech Private Limited (DB Group)09/03/2018
CC006000000043990Anshul GuptaReal Gem Buildtech Private Limited12/04/2018
CC006000000055089Anshul GuptaReal GEm Buildtech Pvt. Ltd.26/06/2018
CC006000000068165Anshul GuptaReal Gem Buildtech Pvt. Ltd20/02/2019
CC006000000044305RADHAKRISHNA SHETTYREALGEM BUILDTECH PVTLTD27/04/2018
CC006000000057156MR. SANDEEP SHASHIDHAR PHANASGAONKAR AND MRS. AISHWARYA SANDEEP PHANASGAONKARREAL GEM BUILDTECH PRIVATE LIMITED24/12/2018
CC006000000209961SUDARSHAN PROPERTIES PRIVATE LIMITEDBHISHMA REALTY LIMITED09/02/2022
CC006000000057404KRISH VASWANIREAL GEM BUILDTECH PVT LTD04/01/2019
CC006000000057395MOHIT VASWANIREAL GEM BUILDTECH PVT LTD04/01/2019
CC006000000057394VARUN WASWANIREAL GEM BUILDTECH PVT LTD18/01/2019
CC006000000057506Crimson Interactive Pvt LtdRealgm Buildtech Pvt Ltd09/01/2019
CC006000000078497Kapil TrikhaBhishma Realty Limited15/03/2019
CC006000000078571Rajesh BalkrishnanRealgem Build-Tech Private Limited25/03/2019
CC006000000078578Umesh Shishupal PuniaKingmaker Developes Pvt Ltd25/03/2019
CC006000000078638Kingmaker Developers Pvt LtdVArun and Gehena Vaswani26/03/2019
CC006000000078640Kingmaker Developers Pvt LtdKrish and Ravi Vaswani26/03/2019
CC006000000078641Kingmaker Developers Pvt LtdMohit and Janak Vaswani26/03/2019
CC006000000078645Kingmaker Developers Pvt LtdCrimson Interactive Pvt Ltd26/03/2019
CC006000000078773NITYA BUXANIREAL GEM BUILDTECH PVT LTD05/04/2019
CC006000000199191Mr. Suresh KolhapureReal Gem Buildtech Pvt. Ltd10/01/2022
CC006000000079173PANKAJ KISHORE AGRAWALREAL GEM BUILDTECH PRIVATE LIMITED07/05/2019
CC006000000079251Julia Maria Aisha De SequeiraReal Gem Buildtech Private Limited11/05/2019
CC006000000171633Realgem Buildtech Pvt Ltd and OrsAkhil Jindal and Anr19/12/2019
CC006000000171634RealGem Buildtech Pvt Ltd and OrsViraang Shah22/11/2019
CC006000000171945Realgem Buildtech Pvt Ltd and OrsKheraj Chavvda and Anr23/12/2019
CC006000000171948Realgem Buildtech Pvt Ltd and OrsKarnail Singh Cheema and Anr24/12/2019
CC006000000192265Realgem Buildtech Pvt Ltd and AnrChandraprakash Agarwal22/01/2020
CC006000000192337Realgem Buildtech and OrsBlooming Mining Pvt Ltd29/01/2020
CC006000000192805VINOD S PASARIREAL GEM BUILDTECH PVT LTD03/03/2020
CC006000000192808VINOD S PASARIBHISHMA REALTY LTD03/03/2020
CC006000000193132Kashyap K MehtaBhishma Realty Limited03/04/2020
CC006000000193606KASHYAP K MEHTABhishma Realty Limited28/07/2020
CC006000000193603Tushar RaulReal Gem Builders Private Limited28/07/2020
CC006000000197954Opera Clothing Private LimitedReal Gem Buildtech Private Limited11/08/2021
CC006000000198108Bhavesh Jayantilal JainReal Gem Buildtech Pvt Ltd26/08/2021
CC006000000194894M/s Jhawar Trade and Investment Pvt. Ltd.Bhishma Realty Limited09/12/2020
CC006000000209990Chandraprakash AgarwalReal Gem Buildtech Private Limited10/02/2022
CC006000000197918Dr. Priyadarshini SanyalRealGem Buildtech Private Limited25/08/2021
CC006000000198377Bhavesh Gnadhi HUFReal Gem Build Tech Pvt. Ltd18/09/2021
CC006000000209851Nikhil Gandhi HUFReal Gem Build Tech Pvt. Ltd28/01/2022
CC006000000198965K R PradeepBhishma Realty Limited14/11/2021
CC006000000199180KRISHNAKUMAR TAORIREALGEM BUILDTECH PVT. LTD29/11/2021
CC006000000292852Anil Kumar DattaniRealgem Buildtech Private Limited27/09/2022
CC006000000333943Karnail Singh CheemaREAL GEM BUILDTECH PVT LTD13/01/2023
CC006000000364754Beekaylon Synthetics Private LimitedRealgem Buildtech Private Limited10/03/2023
CC006000000374883SUSHIL RAMSWAROOP GADIAREAL GEM BUILDTECH PRIVATE LIMITED23/03/2023
CC006000000374880SURESH MAHAVEER PANSARIREAL GEM BUILDTECH PRIVATE LIMITED23/03/2023
CC006000000374892MANJU SURESH PANSARIREAL GEM BUILDTECH PVT. LTD.23/03/2023
CC006000000395674R. C. REALTORS PRIVATE LIMITEDREAL GEM BUILDTECH PRIVATE LIMITED09/05/2023
CC006000000395754keyur manoj dalalReal Gem Buildtech pvt ltd11/05/2023
CC006000000396026Jatin Harish ShahReal Gem Buildtech Private Limited02/06/2023
CC006000000396829BALKRISHNA DOKANIAREAL GEM BUILDTECH PRIVATE LIMITED26/07/2023
CC006000000396823PRAJITA INVESTMENTS PVT. LTD.REAL GEM BUILDTECH PRIVATE LIMITED26/07/2023
CC006000000396824BALKRISHNA DOKANIAREAL GEM BUILDTECH PRIVATE LIMITED26/07/2023
CC006000000209733Avinash PahujaReal Gem Buildtech Private Limited27/01/2022
CC006000000209717Ravish Mahesh PahujaReal Gem Buildtech Private Limited & Anr.27/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Feb 2025

Documents filed194

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 194 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Crown Wing A&B.pdf30 Sep 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 Architect Certificate Wing A and B.pdf25 Feb 2025
Certificates of CA (Form 3)File: 2025 01 23 RG RGBTPL CROWN FORM 3- DEC 24 WING AB.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Dec 2024.pdf20 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Architect Certificate Wing A and B.pdf1 Feb 2025
Certificates of CA (Form 3)File: 2024 10 20 RG RGBTPL CROWN AB FORM 3 SEPT 2024.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Sep'2024.pdf22 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2445318_OC_signed.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-RGBPL - Crown Phase I Mar 24 Signed.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Jun'2024.pdf13 Aug 2024
Certificates of CA (Form 3)File: 2024 07 20 RG RGBTPL CROWN RERA JUNE 2024 WING AB R1_11zon.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION LETTER VALID UPTO 17022025.pdf25 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Mar'2024.pdf25 Apr 2024
Certificates of CA (Form 3)File: fORM 3 RG RGBTPL CROWN RERA MAR 2024 WING AB.pdf25 Apr 2024
Details of encumbrancesFile: Details of encumbrances - Crown Phase 1.pdf12 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC LETTER ( TOWER A 63RD FLOOR PART ).pdf12 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2401103_OC_signed.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Dec'2023.pdf6 Mar 2024
Certificates of CA (Form 3)File: 2024 01 20 RG RGBTPL RERA FORM 3 DEC 23 CROWN WING AB compressed.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 7 - Form 5 FY 2022-23.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 - FORM 1 wing A B up to December 2023.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Dec'2022.pdf17 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Mar'2023.pdf17 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Jun'2023 (1).pdf17 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Sep'2023 (1).pdf17 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Engineer's Certificate for Quality Assurance - Phase 1 - FY 22-23.pdf14 Dec 2023
Certificates of CA (Form 3)File: Form 3 Crown Phase I March 2023_11zon.pdf3 Dec 2023
Certificates of CA (Form 3)File: Form 3 Crown Phase I June 2023.pdf3 Dec 2023
Certificates of CA (Form 3)File: Form 3 Crown Phase I September 2023_11zon.pdf3 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20231019 FORM 1 PHASE I.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20231019 FORM 1 PHASE II.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 RGBPL Crown Phase I Mar 23 compressed.pdf30 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2354058 OC signed.pdf9 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20221231 Phase I.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230331 FORM 1.pdf22 May 2023
Certificates of CA (Form 5)File: 20221231 FORM P1.pdf22 May 2023
Certificates of CA (Form 5)File: 20221231 FORM P2.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210930 FORM 1.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20211231 FORM 1.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20220630 FORM 1.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20220930 FORM 1.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase-1 Panora March'20.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Enginner Certificate Mar'2021 - Phase 1.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Enginner Certificate Sep'2021 - Phase 1.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 MAHA RERA FORM 1 wing A B 26102018.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20181231 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20190331 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20190630 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20190930 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20191231 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200331 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200630 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200930 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20201231 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210331 FORM 1.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAHA RERA FORM 1 Architect Certificate wing A B up to 30092022.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAHA RERA FORM 1 Architect Certificate wing A B up to 30062022.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAHA RERA FORM 1 Architect Certificate wing A B up to 25092021.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAHA RERA FORM 1 Architect Certificate wing A B up to 30122021.pdf10 Feb 2023
Certificates of CA (Form 3)File: 20220331 FORM 3 P1.pdf11 Jan 2023
Certificates of CA (Form 3)File: 20220331 FORM 3 P2.pdf11 Jan 2023
Certificates of CA (Form 3)File: 20220331 FORM 3 P3.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20221231 Phase I.pdf10 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer certificate- Phase 1 - Sep'2022.pdf29 Dec 2022
Certificates of CA (Form 3)File: 01.pdf29 Dec 2022
Certificates of CA (Form 3)File: 02.pdf29 Dec 2022
Certificates of CA (Form 3)File: 03.pdf29 Dec 2022
Certificates of CA (Form 3)File: 04.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf29 Dec 2022
Certificates of CA (Form 5)File: Form 5 CROWN PHASE I.pdf30 Sep 2022
CERSAI detailsFile: Cersai Report.pdf8 Sep 2022
Details of encumbrancesFile: 20220616 Encumbrance Certificate.pdf10 Aug 2022
Details of encumbrancesFile: 20220112 Crown Encumbrances Certificate.pdf14 Jul 2022
Details of encumbrancesFile: 20220614 Crown Encumbrances Certificate.pdf14 Jul 2022
CERSAI detailsFile: CERSAI Search Report.pdf2 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202203 Phase I architect certificate_compressed.pdf21 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 202203 Crown Phase I form 2A.pdf21 May 2022
Details of encumbrancesFile: 20211224 Encumbrance Certificate.pdf4 Apr 2022

Keep RUSTOMJEE CROWN - PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near prabhadevi

2 kmRUSTOMJEE CROWN - PHASE Completed 10Lapsed / revoked 9Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Realgem Buildtech Private Limited

Realgem Buildtech Private Limited has 1 registration on MahaRERA, including RUSTOMJEE CROWN - PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that RUSTOMJEE CROWN - PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RUSTOMJEE CROWN - PHASE I is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUSTOMJEE CROWN - PHASE I?

The registered promoter entity is Realgem Buildtech Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUSTOMJEE CROWN - PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUSTOMJEE CROWN - PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUSTOMJEE CROWN - PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUSTOMJEE CROWN - PHASE I?

The professionals named in the filing: Chartered Accountant: V A Shimpi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUSTOMJEE CROWN - PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUSTOMJEE CROWN - PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUSTOMJEE CROWN - PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.