Home / Browse projects / Mumbai Suburban, Maharashtra / ROHA VATIKA-ROHA KUMUD

Completed No litigation declared Residential / Group Housing project

ROHA VATIKA-ROHA KUMUD

By Roha Realty Private Limited

RG-MH-29683 · RERA P51800029480 · Last updated on MahaRERA portal: 17 Feb 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
44 of 166Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

ROHA VATIKA-ROHA KUMUD is a Residential / Group Housing project by Roha Realty Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029480 on 4 Jun 2021. The registration is recorded completed; possession was promised by 16 Jun 2025. The completion date has moved by 15 months from the original filing. 122 of the 166 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameROHA VATIKA-ROHA KUMUD
  • TypeResidential / Group Housing
  • Location
    • NEHRU NAGAR
    • KURLA
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800029480
  • ReraGenie IDRG-MH-29683

Builder

  • NameRoha Realty Private Limited
  • Entity typeCompany
  • DirectorHarshvardhan Shrikant Tibrewala
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredJun 2021First promiseMar 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jun 2021
  • Promised completion16 Jun 2025
  • Revised completionRevised to 16 Jun 2025 (originally 31 Mar 2024)
  • Buildings1 building record
  • Documents filed88 files

Current status

73%122 of 166 units booked
100.0%Work done, per cost certificate

Figures as on 17 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROHA VATIKA-ROHA KUMUDNA20181660166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ROHA VATIKA-ROHA KUMUD: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area864 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025
LandownerVillageDistrict
M/S ADVAIT BUILDERS AND DEVELOPERThane (M Corp.)Thane
NAV VISHWA VIHAR CO-OP HSG SOCIETY LTDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI6821.21
Proposed, not sanctioned2,447 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI WEST
Estimated costRs 33.34 cr
Cost incurredRs 33.34 cr
Work done100.0%
BuildingWingEstimatedIncurred
ROHA VATIKA-ROHA KUMUDNARs 33.34 crRs 33.34 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN ARCHITECTS AND INTERIOR DESIGNERS
EngineerMS UNISTEPS CONSULTING PVT LTD
Chartered AccountantB K BARANWAL AND COMPANY
Chartered AccountantANKUR SHAH & ASSOCIATES
PartnerRole in project
Roha Realty Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16092502608Mar 2024 → Jun 2025

Reason as filed by the promoterExtension required till OC date

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000591582ROHA REALTY PRIVATE LIMITEDPRERANA MILIND DHEKLE20/08/2024
CC12504665Mr.Shankar Janne And Mrs.Kyatamma JanneRoha Realty Private Limited29/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC VERIFICATION EMAIL.PDF17 Feb 2026
Occupational CertificateFile: Bldg No 134 Approved OC Plan_1-2.pdf17 Feb 2026
Occupational CertificateFile: Bldg No 134 Approved OC Plan_3-end.pdf17 Feb 2026
Withdrawal Update Form 1File: 134_Architect Certificate_ April 25 to June 25..pdf19 Nov 2025
Withdrawal Update Form 2File: form 2.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3_Kumud_June 2025..pdf19 Nov 2025
Occupational CertificateFile: Bldg no 134 Full OC.PDF19 Nov 2025
Declaration about Commencement CertificateFile: CC Declaration_Kumud_03 06 2025.pdf3 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Kumud _FY 2021-2022.pdf3 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Kumud _FY 2022-2023.pdf3 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Kumud _FY 2023-2024.pdf3 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARch Cert 134 kumud oct 2023 to DEc 2023 (1).pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARch Cert 134 kumud jan 2024 to march 2024 (1).pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 134 kumud April 2024 to June 2024.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARch Cert 134 kumud july 2024 to Sept 2024 (1).pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARch Cert 134 kumud oct 2024 to Dec 2024 (1).pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 134 kumud jan 2025 to March 2025.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 21.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg Jan feb march 2024.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 24.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 24.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 24.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg jan feb march 2023.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg April may june 2023.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg july aug sept c 2023.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg oct nov Dec 2023.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 134 Engg Jan feb march 2024.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form - 5 - Kumud -2021-22.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumud Dec 2023.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumud June 2023.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumud Sept 2023.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate december 134.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate december 134.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Roha Vatika -Kumud - Dec-2022 CA Certificate.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Bldg 134- architect certificate.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate 15-10-2022.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 138 CA certificate.pdf15 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: further CC- 20th October 2022.pdf21 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate august 2022.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate august 2022.pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate- june quarter_compressed (1).pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTTIFICATE 31ST DECEMBER 2022.pdf30 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31ST MARCH 2022.pdf30 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate-29-04-2022.pdf6 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 2.pdf6 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 2.pdf6 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: further CC-10th June 2022.pdf16 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-1.pdf7 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-2.pdf7 May 2022
Disclosure of sold/ booked inventoryFile: 134 inventory list_compressed.pdf10 Mar 2022
Layout approvalFile: plan_1.pdf19 Jan 2022
Layout approvalFile: plan_2.pdf19 Jan 2022
Layout approvalFile: plan_3.pdf19 Jan 2022
Layout approvalFile: plan_4.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: plan_1.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: plan_2.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: plan_3.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: plan_4.pdf19 Jan 2022
Building plan approvalFile: IOD- 134 date 17-01-2022_compressed.pdf17 Jan 2022
Copy of the legal title reportFile: NAV-VISHWA 134 date 17-1-2022_compressed.pdf17 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD- 134 date 17-01-2022_compressed.pdf17 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf6 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate-2.pdf1 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf1 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ROHA KUMUND FORM 2.pdf11 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate KUMUD.pdf11 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate KUMUND.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KUMUD Site Supervisor Certificate Form 2A.pdf6 Aug 2021
Layout approvalFile: roha plan 1 final.pdf2 Jun 2021
Layout approvalFile: roha plan 2 final.pdf2 Jun 2021
Layout approvalFile: roha plan 3 final.pdf2 Jun 2021
Copy of Layout Approval (in case of layout)File: roha plan 1 final.pdf2 Jun 2021
Copy of Layout Approval (in case of layout)File: roha plan 2 final.pdf2 Jun 2021
Copy of Layout Approval (in case of layout)File: roha plan 3 final.pdf2 Jun 2021
Proforma of Allotment letterFile: Agreement for Sale Draft.pdf2 Jun 2021
Proforma of Allotment letterFile: Allotment Letter Draft.pdf2 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE COMP.pdf7 May 2021

How this compares with Mumbai Suburban

73%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROHA VATIKA-ROHA KUMUD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

Builder: Roha Realty Private Limited

Roha Realty Private Limited has 4 registrations on MahaRERA, including ROHA VATIKA-ROHA KUMUD and ROHA VATIKA-ROHA PALASH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ROHA VATIKA-ROHA KUMUD is delayed beyond 16 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROHA VATIKA-ROHA KUMUD?

The registered promoter entity is Roha Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROHA VATIKA-ROHA KUMUD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ROHA VATIKA-ROHA KUMUD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ROHA VATIKA-ROHA KUMUD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROHA VATIKA-ROHA KUMUD?

The professionals named in the filing: Architect: DESIGN ARCHITECTS AND INTERIOR DESIGNERS; Engineer: MS UNISTEPS CONSULTING PVT LTD; Chartered Accountant: B K BARANWAL AND COMPANY; Chartered Accountant: ANKUR SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROHA VATIKA-ROHA KUMUD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROHA VATIKA-ROHA KUMUD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROHA VATIKA-ROHA KUMUD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.