Home / Browse projects / RUPAREL VIVANZA

Registered No litigation declared Residential / Group Housing project

RUPAREL VIVANZA

By R R Builders

RG-MH-26247 · RERA P51900003595 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • 25 complaints at MahaRERA
  • Completion date moved by 21 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2027Possession promisedmoved 21 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 0%
25Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

RUPAREL VIVANZA is a Residential / Group Housing project by R R Builders in 400027, registered with MahaRERA as P51900003595 on 5 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 21 months from the original filing. 25 complaints are on record with the regulator.

At a glance

Project

  • NameRUPAREL VIVANZA
  • TypeResidential / Group Housing
  • Location
    • 400027
  • Pincode400027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003595
  • ReraGenie IDRG-MH-26247

Builder

  • NameR R Builders
  • Entity typePartnership
  • GSTIN27AAAFR8678K2ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAmit Mahendra Ruparel
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ruparel VivanzaNA520000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 0%.

Ruparel Vivanza: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Any Other Club HouseYes0%

Parking filed688

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots688
Closed/Covered688

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,197 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
R R BuildersOthersMumbai City

Approvals and building plan

Permissible FSI27470.28
Proposed, not sanctioned15,352 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch52, Hill Road, Shop No 21 C to 25 C, Natasha, Bandra West, Mumbai

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Kamathi
ArchitectGirish Nerurkar
EngineerAjay Pandurang Gade
EngineerSantosh Shukla
Chartered AccountantShereena Jacob
Chartered AccountantSarveshwar &Co LLP
PartnerRole in project
R R Builders-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013073Jun 2025 → Mar 2027

Reason as filed by the promoterThe project was stalled and derailed due to differences between partners. The same has been resolved and project has been restarted by the new name Ruparel Vivanza. The revised approvals have been obtained. This will also change the timelines of the project hence we have taken the consent of the existing Alottees. We have uploaded the same along with the copy of revised approvals. We have projected 48 months to complete the project hence this request for extension of the project.

Litigation declared1

CaseCourtStatus
4265/2013Bombay City Civil CourtPending in Bombay City Civil Court for filing affidavit

Complaints filed with MahaRERA25

Case no.ComplainantRespondentFiled
CC006000000057374Sohel F. Kazani for Proactive Shipping Co. Pvt. Ltd.RR Builders26/12/2018
CC006000000141110Maneck N HansotiaGodrej Projects Development Pvt.Ltd10/10/2019
CC006000000141140Trupti Kamlesh ParikhGodrej Projects Development Pvt. ltd.10/10/2019
CC006000000151213Rukhshana K. DadachanjiGodrej Projects Development Pvt Ltd10/10/2019
CC006000000151212Hussain A KhanjiGodrej Projects Development Pvt. Ltd.10/10/2019
CC006000000151209MR. BRIJ AGARWALGODREJ PROJECTS DEVELOPMENT LIMITED (FORMERLY KNOWN AS GODREJ PROJECTS DEVELOPMENT PRIVATE LIMITED)01/11/2019
CC006000000151217Bhagwanti Tirathdas KhetwaniGodrej Projects Development Pvt. Ltd.10/10/2019
CC006000000151219Sajjad Hussain KhanjiGodrej Projects Developments Pvt.Ltd10/10/2019
CC006000000193314Mrs. Daulat Hussainali BishunR. R. Builders20/06/2020
CC006000000198355Mr Nandkumar C MulaniR. R. Builders16/09/2021
CC006000000210201Vineesha B RahejaRR Builders24/03/2022
CC006000000210207Mrs Sunita B MehtaniRR Builders25/03/2022
CC006000000210208Manish AolaniRR Builders05/04/2022
CC006000000220971Fakhruddin Hasanbhai BandookwalaRR Builders09/05/2022
CC006000000375000ECHJAY INDUSTRIES PRIVATE LIMITEDR.R.BUILDERS28/03/2023
CC006000000396738Kehkashan Abdul Hamid CoatwalaRR BUILDERS20/07/2023
CC006000000396749Kehkashan Abdul Hamid CoatwalaRR BUILDERS20/07/2023
CC006000000396648Farida Abdul Rashid CoatwalaRR BUILDERS20/07/2023
CC006000000396724Farida Abdul Rashid CoatwalaRR BUILDERS20/07/2023
CC12504699R R BuildersMegharam Ranaji Desai30/12/2025
CC12504700R R BuildersAmit Sudhakar Wadekar30/12/2025
CC12601949R R BuildersMr Nikit suresh jain02/04/2026
CC12601950R R BuildersMr Nikit suresh jain02/04/2026
CC12603712Megharam Ranaji DesaiR R Builders16/06/2026
CC12604385R R BuildersMr Kashif Khan14/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Ruparel Vivanza 31032026.pdf29 May 2026
Form 2File: Form-2 Ruparel Vivanza 31032026.pdf29 May 2026
Form 3File: Form-3 Ruparel Vivanza 31032026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: Ruparel Vivanza Sold Unsold Inventory 31032026.pdf29 May 2026
Form 1File: Form 1 Ruparel Vivanza 30062025.pdf5 Mar 2026
Form 2File: Form 2 Ruparel Vivanza 30062025.pdf5 Mar 2026
Form 3File: Form 3 Ruparel Vivanza 30062025.pdf5 Mar 2026
Disclosure of Sold and Booked InventoryFile: Ruparel Vivanza Sold Unsold Inventory 30062025.pdf5 Mar 2026
Form 1File: Form 1 Ruparel Vivanza 30092025.pdf5 Mar 2026
Form 2File: Form 2 Ruparel Vivanza 30092025.pdf5 Mar 2026
Form 3File: Form 3 Ruparel Vivanza 30092025.pdf5 Mar 2026
Disclosure of Sold and Booked InventoryFile: Ruparel Vivanza Sold Unsold Inventory 30092025.pdf5 Mar 2026
Form 1File: Form 1 Ruparel Vivanza 31122025.pdf24 Feb 2026
Form 2File: Form 2 Ruparel Vivanza 31122025.pdf24 Feb 2026
Form 3File: Form 3 Ruparel Vivanza 31122025.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Ruparel Vivanza Sold Unsold Inventory 31122025.pdf24 Feb 2026
Form 1File: Ruparel Vivanza Form 1 31032025.pdf15 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Ruparel Vivanza FY 24-25.pdf25 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ruparel Vivanza Form 1 31032025.pdf24 Apr 2025
Certificates of CA (Form 3)File: Form 3 Ruparel Vivanza Mar25.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Ruparel Vivanza 31032025.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Mar23.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ruparel Vivanza Form 2A FY 24-25.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mar24.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mar25.pdf24 Apr 2025
Certificates of CA (Form 3)File: Form 3 Ruparel Vivanza.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Ruparel Vivanza.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 Ruparel Vivanza Form 2A Final.pdf15 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Feb 2023
Copy of the legal title reportFile: Annexure 'I'-Title Report.pdf2 Feb 2023
Proforma of Agreement for saleFile: AFS- Ruparel Vivanza.pdf18 Jan 2023
Proforma of Allotment letterFile: Allotment Letter-Ruparel Vivanza.pdf18 Jan 2023
Building plan approvalFile: IOD 13.pdf26 Dec 2022
Building plan approvalFile: IOD 14.pdf26 Dec 2022
Building plan approvalFile: IOD 15.pdf26 Dec 2022
Building plan approvalFile: IOD 16.pdf26 Dec 2022
Building plan approvalFile: IOD 17.pdf26 Dec 2022
Building plan approvalFile: IOD 18.pdf26 Dec 2022
Building plan approvalFile: IOD 19.pdf26 Dec 2022
Building plan approvalFile: IOD 20.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 13.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 14.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 15.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 16.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 17.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 18.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 19.pdf26 Dec 2022
Building Plan Approval (IOD)File: IOD 20.pdf26 Dec 2022
Building plan approvalFile: IOD 1.pdf15 Dec 2022
Building plan approvalFile: IOD.pdf15 Dec 2022
Building plan approvalFile: IOD 2.pdf15 Dec 2022
Building plan approvalFile: IOD 5.pdf15 Dec 2022
Building plan approvalFile: IOD 6.pdf15 Dec 2022
Building plan approvalFile: IOD 7.pdf15 Dec 2022
Building plan approvalFile: IOD 8.pdf15 Dec 2022
Building plan approvalFile: IOD 9.pdf15 Dec 2022
Building plan approvalFile: IOD 10.pdf15 Dec 2022
Building plan approvalFile: IOD 11.pdf15 Dec 2022
Building plan approvalFile: IOD 12.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 1.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 2.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 5.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 6.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 7.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 8.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 9.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 10.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 11.pdf15 Dec 2022
Building Plan Approval (IOD)File: IOD 12.pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGG 2020.pdf18 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGG 2021.pdf18 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGG 2022.pdf18 Nov 2022
Disclosure of sold/ booked inventoryFile: Circ29 inventory details.pdf18 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY 18-19 RERA Form-5.pdf18 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 19-20 RERA Form-5.pdf18 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21 RERA Form-5.pdf18 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 21-22 RERA Form-5.pdf18 Nov 2022
Declaration about Commencement CertificateFile: Form- D.pdf17 Nov 2022

Keep RUPAREL VIVANZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmRUPAREL VIVANZACompleted 4Lapsed / revoked 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: R R Builders

R R Builders has 5 registrations on MahaRERA, including RUPAREL VIVANZA and HILL GALAXY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record.

Frequently asked questions

What are my rights if RUPAREL VIVANZA is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUPAREL VIVANZA?

The registered promoter entity is R R Builders, a partnership as per the filing. Its GSTIN 27AAAFR8678K2ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUPAREL VIVANZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUPAREL VIVANZA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUPAREL VIVANZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUPAREL VIVANZA?

The professionals named in the filing: Architect: Rahul Kamathi; Architect: Girish Nerurkar; Engineer: Ajay Pandurang Gade; Engineer: Santosh Shukla; Chartered Accountant: Shereena Jacob; Chartered Accountant: Sarveshwar &Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUPAREL VIVANZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUPAREL VIVANZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUPAREL VIVANZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.