Home / Browse projects / Mumbai City, Maharashtra / RUNWAL RESERVE

Completed No litigation declared Residential / Group Housing project

RUNWAL RESERVE

By RUNWAL DEVELOPERS PVT LTD

RG-MH-08661 · RERA P51900000383 · Last updated on MahaRERA portal: 30 Oct 2023

Source: official MahaRERA filing

Red flags

  • 60 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
60Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

RUNWAL RESERVE is a Residential / Group Housing project by RUNWAL DEVELOPERS PVT LTD in Mumbai City, Maharashtra, registered with MahaRERA as P51900000383 on 15 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 60 complaints are on record with the regulator.

At a glance

Project

  • NameRUNWAL RESERVE
  • TypeResidential / Group Housing
  • Location
    • Manjrekar Lane
    • Lower Parel
    • Mumbai City
    • 400018
  • Pincode400018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000383
  • ReraGenie IDRG-MH-08661

Builder

  • NameRUNWAL DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU70100MH1988PTC046631
  • GSTIN27AAACR0395J1Z8
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorPallavi Matkari
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUNWAL RESERVENA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

RUNWAL RESERVE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,394 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13909.38
Proposed, not sanctioned11,381 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRUPAM CENTRE, CINE PLANET, SION CIRCLE, SION EAST MUMBAI 400022

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPALLAVI GANESH MATKARI
PartnerRole in project
RUNWAL DEVELOPERS LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900000931Dec 2018 → Dec 2019

Reason as filed by the promoterWe have registered our project “Runwal Reserve” (“hereinafter referred to as the said Project”) on the RERA Website bearing Registration No.51900000383 on 15th July 2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2018 . We submit that we acted diligently and have completed the major construction work of the Building and obtained the Part Occupation Certificate dated 7th November 2017 in respect of all flats that are sold upto 24th floors within the Date of Completion as disclosed on the RERA Website. We have not sold any

Complaints filed with MahaRERA60

Case no.ComplainantRespondentFiled
CC006000000110747Nita Harshad JoshiRunwal Realty Private Limited29/08/2019
CC006000000089737RAVINDRA TUKARAM SURVERUNWAL REALTY PRIVATE LIMITED14/06/2019
CC006000000056528prashant shekhar dalmiaRunwal Realty Pvt.Ltd20/10/2018
CC006000000198673Sumit Sablok (through POA Holder, Mr. Harinder Singh)Runwal Developers Private Limited14/10/2021
CC006000000161330Runwal RealtyRavindra Tukaram Surve24/10/2019
CC006000000171534Manish KumarRunwal Realty Private Limited13/11/2019
CC006000000197897Antara AshraSandeep Runwal05/08/2021
CC006000000198404Abha LadhaRunwal Realty Private Limited25/10/2021
CC006000000198391The Reserve By Runwal CHS LtdRunwal Developers Pvt Ltd30/09/2021
CC006000000251571Runwal Developers Pvt LtdAditya Sanjay Shah and Ors05/07/2022
CC006000000251572Runwal Developers Pvt LtdDeepa Kejriwal05/07/2022
CC006000000251574Runwal Developers Pvt LtdNeeraj Akhoury and Ors05/07/2022
CC006000000251575Runwal Developers Pvt LtdPriyanka Dabriwala and Ors05/07/2022
CC006000000251576Runwal Developers Pvt LtdKumudini Sheth and Ors05/07/2022
CC006000000251577Runwal Developers Pvt LtdSara Padaria and Ors05/07/2022
CC006000000251578Runwal Developers Pvt LtdSitadevi Solanki and Ors05/07/2022
CC006000000251579Runwal Developers Pvt LtdWindmere India Pvt Ltd and Anr05/07/2022
CC006000000396389Runwal Developers Pvt LtdAntara Gautam Ashra and Ors25/09/2023
CC006000000429529Runwal Developers Pvt LtdPravin Jain, Anukta Mohit Jain and Ors15/03/2024
CC006000000479866Runwal Developers Pvt LtdShabbir Taher Muchhala and Ors31/03/2024
CC006000000479874Runwal Developers Pvt LtdAsghar Adam Ali Ibrahim and Ors31/03/2024
CC006000000479875Runwal Developers Pvt LtdShabbir Taher Muchhala and Ors31/03/2024
CC006000000479876Runwal Developers Pvt LtdSudesh Saboo and Anr31/03/2024
CC006000000479877Runwal Developers Pvt LtdPooja Jhunjhunwala and Anr31/03/2024
CC006000000479878Runwal Developers Pvt LtdDaulat Adnani and Ors31/03/2024
CC006000000333826Runwal Developers Pvt. Ltd.Mr. Ghanshyam Gupta20/02/2023
CC006000000333827Runwal Developers Pvt. Ltd.Mr. Rishiraj Khajanchi20/02/2023
CC006000000333837Runwal Developers Pvt. Ltd.Mr. Amit Lalchand Parekh20/02/2023
CC006000000333842Runwal Developers Pvt. Ltd.Mrs. Sharda Devi Taparia20/02/2023
CC006000000333845Runwal Developers Pvt. Ltd.Mr. Ashish Vijay Rajgarhia20/02/2023
CC006000000333853Runwal Developers Pvt. Ltd.Mr. Dinesh Sharma20/02/2023
CC006000000333855Runwal Developers Pvt. Ltd.Mr. Vipul R. Shah20/02/2023
CC006000000333856Runwal Developers Pvt. Ltd.Mr. Ketan Dalal20/02/2023
CC006000000333857Runwal Developers Pvt. Ltd.Mr. Dilip B Raja20/02/2023
CC006000000429265Runwal Developers Pvt. Ltd.Akshay Kulkarni17/02/2024
CC006000000429269Runwal Developers Pvt. Ltd.Mr. Harshvardhan Singh17/02/2024
CC006000000429287Runwal Developers Pvt. Ltd.Mr. Vishal Premchaand Bothra, Mrs. Sonal Vishal Bothra, and Mrs. Usha Premchand Bothra17/02/2024
CC006000000429288Runwal Developers Pvt. Ltd.Mr. Prashant Kumar Ghose, Mrs. Shreya Ghose17/02/2024
CC006000000429290Runwal Developers Pvt. Ltd.Mrs. Kalpana Paresh Mehta17/02/2024
CC006000000429291Runwal Developers Pvt. Ltd.Mr. Bhaskar B Sanghvi, Mr. Hitesh Bhaskar Sanghvi17/02/2024
CC006000000429292Runwal Developers Pvt. Ltd.Mr. Aliasger Kumail Khorakiwala17/02/2024
CC006000000429294Runwal Developers Pvt. Ltd.Mrs. Veena A Dhawan, Mr. Arjun H Dhawan17/02/2024
CC006000000429295Runwal Developers Pvt. Ltd.Mr. Maninder Singh Juneja and Mrs. Aparna Juneja17/02/2024
CC006000000429300Runwal Developers Pvt. Ltd.Mr. Krishna Jalan17/02/2024
CC006000000429302Runwal Developers Pvt. Ltd.Mr. Jagdish Shetty, Mrs. Bhakti Shetty, Mr. Abhishek Shetty17/02/2024
CC006000000479806Runwal Developers Pvt. Ltd.Manish Sinha & Payal Sinha30/03/2024
CC006000000479807Runwal Developers Pvt. Ltd.Sunil Kumar Mishra30/03/2024
CC006000000479808Runwal Developers Pvt. Ltd.Devesh Navinbhai Shah & Smita Devesh Shah30/03/2024
CC006000000479809Runwal Developers Pvt. Ltd.Deepak Rattan and Shalini Rattan30/03/2024
CC006000000479810Runwal Developers Pvt. Ltd.Aljai Baitheja and Calibre Consultants Pvt.Ltd.30/03/2024
CC006000000479811Runwal Developers Pvt. Ltd.Pravin Agarwal and Smita Agarwal30/03/2024
CC006000000479821Runwal Developers Pvt. Ltd.Vikas Choudhary and Kajal Choudhary30/03/2024
CC006000000479823Runwal Developers Pvt. Ltd.Mr. Rajiv C. Sanghavi and Beena R Sanghavi30/03/2024
CC006000000479824Runwal Developers Pvt. Ltd.Priyanka V. Malhotra30/03/2024
CC006000000479825Runwal Developers Pvt. Ltd.Mr. Viral Rajarshi Mehta30/03/2024
CC006000000479826Runwal Developers Pvt. Ltd.Mr. Manish S. Kedia and Mr. Atishay M Kedia30/03/2024
CC006000000479838Runwal Developers Pvt. Ltd.Mahendra Nath Khandelwal and Anjili Khandelwal30/03/2024
CC006000000479840Runwal Developers Pvt. Ltd.Jay Shah30/03/2024
CC006000000479844Runwal Developers Pvt. Ltd.Mrs. Sunita Mansukhani30/03/2024
CC006000000428755Sanya Runwal Family Trust TrustThe Reserve by Runwal CHS Ltd.06/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Dec 2021

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Home Buyer /Allottee Grievance Redressal CellFile: Declaration Runwal Reserve.pdf30 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Runwal Reserve Form 2A Year 2020.pdf21 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Runwal Reserve Form 2A Year 2021.pdf21 Jun 2022
Details of encumbrancesFile: RUNWAL RESERVE Encumbrance Certificate 11 05 2022.pdf12 May 2022
CERSAI detailsFile: Runwal Reserve Cersai Report.pdf10 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupation Certificate 16 12 2021.pdf27 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: RESERVE FORM 4 ARCHITECT CERTIFICATE 23 12 2021 FOR RERA.pdf27 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE ARCHITECT CERTIFICATE FOR RERA 30 09 2021.pdf13 Oct 2021
Declaration about Commencement CertificateFile: Reserve Form D 2 9 2021.pdf13 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE ARCHITECT CERTIFICATE FOR RERA 30 06 2021.pdf4 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Reserve.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31032020.pdf18 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31122019.pdf18 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31122020.pdf18 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_30-06-2019.pdf1 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_30-09-2019.pdf1 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_30-06-2020.pdf1 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_30-09-2020.pdf1 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_31-03-2021.pdf1 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Reserve Form5 10 03 2021.pdf15 Mar 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC 09 03 2020 The Reserve.pdf7 Aug 2020
Architect’s Certificate on Completion of Project (Form 4)File: RESERVE ARCHITECT CERTIFICATE 06 08 2020 FOR RERA.pdf7 Aug 2020
Certificates of CA (Form 3)File: FORM -3 The Reserve 2020.pdf16 Jul 2020
Certificates of CA (Form 5)File: FORM 5_ RDPL -Reserve.pdf29 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Worli Part-2 OC-Signed.pdf26 Nov 2019
OtherFile: Declaration for updation of Amalgamation - Reserve.pdf26 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: 2189119_FurtherCC_signed.pdf20 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf20 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_31-07-2018.pdf17 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RESERVE_ARCHITECT CERTIFICATE_FOR RERA_31-03-2019.pdf17 May 2019
Certificates of CA (Form 3)File: Reserve - Form 3 July 2018.pdf26 Apr 2019
Certificates of CA (Form 5)File: Signed Form 5- Reserve.pdf16 Nov 2018
OtherFile: Part OC.pdf21 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Mar 2018
Proforma of Allotment letterFile: RESERVE AFS.pdf4 Nov 2017
Proforma of Allotment letterFile: RESERVE AFS with Allotment Letters.pdf4 Oct 2017
Certificates of CA (Form 3)File: CA-CERTIFICATE--RESERVE.pdf7 Jul 2017
Proforma of Allotment letterFile: Allotment letter Agmt for Sale Self Declaration .pdf7 Jul 2017
Layout approvalFile: APPROVAL-1.pdf23 Jun 2017
Layout approvalFile: APPROVAL-2.pdf23 Jun 2017
Layout approvalFile: APPROVAL-3.pdf23 Jun 2017
Layout approvalFile: APPROVAL-4.pdf23 Jun 2017
Building plan approvalFile: IOD.pdf23 Jun 2017
Building plan approvalFile: IOD-PLANS.pdf23 Jun 2017
PAN CardFile: PAN Card RRPL.pdf23 Jun 2017
Copy of the legal title reportFile: TITLE REPORT-KANGA-18-04-2013.pdf23 Jun 2017
Details of encumbrancesFile: Encumbrances.pdf23 Jun 2017
Copy of Layout Approval (in case of layout)File: APPROVAL-1.pdf23 Jun 2017
Copy of Layout Approval (in case of layout)File: APPROVAL-2.pdf23 Jun 2017
Copy of Layout Approval (in case of layout)File: APPROVAL-3.pdf23 Jun 2017
Copy of Layout Approval (in case of layout)File: APPROVAL-4.pdf23 Jun 2017
Building Plan Approval (IOD)File: IOD.pdf23 Jun 2017
Building Plan Approval (IOD)File: IOD-PLANS.pdf23 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Jun 2017
Declaration in FORM BFile: Form B.pdf23 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate-23-06-2017-1.pdf23 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf23 Jun 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUNWAL RESERVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lower Parel780+ in Mumbai City

2 kmRUNWAL RESERVECompleted 12Lapsed / revoked 16Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: RUNWAL DEVELOPERS PVT LTD

RUNWAL DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including RUNWAL RESERVE and Runwal Elegante - Tower A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if RUNWAL RESERVE is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUNWAL RESERVE?

The registered promoter entity is RUNWAL DEVELOPERS PVT LTD, a company as per the filing. Its CIN U70100MH1988PTC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUNWAL RESERVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUNWAL RESERVE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUNWAL RESERVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUNWAL RESERVE?

The professionals named in the filing: Architect: PALLAVI GANESH MATKARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUNWAL RESERVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUNWAL RESERVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUNWAL RESERVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.