Red flags

  • Litigation declared, 1 case
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Apr 2034Possession promisedmoved 4 months from the original
0 of 11Construction stages donefurthest along: Excavation, 8%
26 of 91Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Godrej Trilogy Seaturf is a Residential / Group Housing project by EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as PR1171012501267 on 20 Oct 2025. Possession is promised by 30 Apr 2034. The completion date has moved by 4 months from the original filing. 65 of the 91 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameGodrej Trilogy Seaturf
  • TypeResidential / Group Housing
  • Location
    • AB. Nair Road
    • Mariamma Nagar
    • Near Nehru Planetarium
    • Worli
    • Others
    • Ward GSouth
    • Mumbai City
    • 400018
  • Pincode400018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1171012501267
  • ReraGenie IDRG-MH-98770

Builder

  • NameEMBELLISH HOUSES PRIVATE LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED
  • Entity typeOthers
  • LLPINAAO-2164
  • Designated PartnersAmitesh Shah, Sanjay Bhagat
  • DirectorsSarjan Shah, Niraj Nirmalkumar Rungta, Jayvardhan Goenka
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2025First promiseDec 2033Revised toApr 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Oct 2025
  • Promised completion30 Apr 2034
  • Revised completionRevised to 30 Apr 2034 (originally 31 Dec 2033)
  • Buildings1 building record
  • Documents filed38 files

Current status

71%65 of 91 units booked
0.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower - ANA473291091

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 8%.

Tower - A: 1% average across the applicable activities

ActivityProgress
Excavation8%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed315

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots315
Podiums / Upper Parking Floor211
Basement104

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Oct 2025
LandownerVillageDistrict
AKSHAY STHAPATYA PRIVATE LIMITEDOthersMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI21228.2
Proposed, not sanctioned21,228 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, AXIS HOUSE,BOMBAY DYEING MILL COMPOUND,PANDURANG BUDHKAR MARG,WORLI, MUMBAI - 400 025
Estimated costRs 576.66 cr
Cost incurredRs 3.06 cr
Work done0.53%
BuildingWingEstimatedIncurred
Tower - ANARs 540.04 crRs 2.68 cr
-NARs 36.62 crRs 37.58 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design architects
EngineerVinyasa Consultants
EngineerSamartha Constro Consultants LLP
Chartered AccountantAKPJ & Associates
Chartered AccountantB S R & Co. LLP
PartnerRole in project
GODREJ PROPERTIES LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1171012501267/WarDec 2033 → Apr 2034

Reason as filed by the promoterNA

Litigation declared1

CaseCourtStatus
8401/2022Bombay High CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2034

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Tower A.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Tower A.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Tower A CA Certificate.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_Godrej Trilogy_Seaturf.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1_TA_Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2_TA Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate_TA_Mar 26.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Tower A Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Tower A Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Tower A Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_TB_Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_TB_Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_TB_Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_TA.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_TA.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_TA.pdf20 Jan 2026
Layout approvalFile: IOD Approval Plan Seaturf.pdf16 Oct 2025
Building plan approvalFile: Section Seaturf.pdf16 Oct 2025
Building plan approvalFile: 9th Podium E-Deck floor plan.pdf14 Oct 2025
Building plan approvalFile: Section (Tower-A).pdf14 Oct 2025
Declaration and undertaking (Annexure A)File: Annexure A - EHLLP - Seaturf.pdf14 Oct 2025
Building plan approvalFile: TA Terrace Amenity.pdf14 Oct 2025
Building plan approvalFile: Ground Floor Plan.pdf14 Oct 2025
Building plan approvalFile: Parking Floors (Basement-1).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (Basement-2).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (Basement-3).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (1st Podium).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (2nd to 5th Podium).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (6th & 7th Podium).pdf11 Oct 2025
Building plan approvalFile: Parking Floors (8th Podium).pdf11 Oct 2025
Building plan approvalFile: 10th, 11th to 14th & 18th to 21st Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 15th & 22nd Below Refuge Floor Plan & 17th Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 16th & 23th Refuge Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 24th to 28th, 31st to 35th & 38th Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 29th & 36th Below Refuge Floor Plan, 30th & 37th Refuge Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 39th to 41st Floor Plan.pdf11 Oct 2025
Building plan approvalFile: 42nd Floor Plan (amenity floor).pdf11 Oct 2025
Layout approvalFile: Layout Seaturf - First Sheet.pdf10 Oct 2025

How this compares with Mumbai City

71%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 4 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Trilogy Seaturf on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mariamma Nagar, Near Nehru Planetarium, Worli780+ in Mumbai City

2 kmGodrej Trilogy SeaturfCompleted 10Lapsed / revoked 12Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED

EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED has 2 registrations on MahaRERA, including Godrej Trilogy Seaturf and Godrej Trilogy Seafront. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Godrej Trilogy Seaturf is delayed beyond 30 Apr 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Trilogy Seaturf?

The registered promoter entity is EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY STHAPATYA PRIVATE LIMITED, an others as per the filing. Its LLPIN AAO-2164 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Trilogy Seaturf?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Godrej Trilogy Seaturf?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Trilogy Seaturf?

The professionals named in the filing: Architect: R Design architects; Engineer: Vinyasa Consultants; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: AKPJ & Associates; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Trilogy Seaturf?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Trilogy Seaturf. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Trilogy Seaturf to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.