Registered No litigation declared Commercial project

Runwal Nexus

By Asmira Ventures Private Limited

RG-MH-17724 · RERA P51800055982 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
14 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Runwal Nexus is a Commercial project by Asmira Ventures Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055982 on 2 May 2024. Possession is promised by 30 Dec 2026. 11 of the 25 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameRunwal Nexus
  • TypeCommercial
  • Location
    • LINK ROAD
    • MALAD
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800055982
  • ReraGenie IDRG-MH-17724

Builder

  • NameAsmira Ventures Private Limited
  • Entity typeCompany
  • GSTIN27ABCCA6873F1ZJ
  • DirectorsJitendra Natwarlal Sheth, Kirti Kediya
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

44%11 of 25 units booked
0.0%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURIS NEXUS TOWER 4 COMMERCIAL -SALE BLDG NO1 WING D COMMERCIALNA5502525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

AURIS NEXUS TOWER 4 COMMERCIAL -SALE BLDG NO1 WING D COMMERCIAL: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered35

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area344 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Feb 2026
LandownerVillageDistrict
Transcon Seth Creators Private Limited-Mumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI1822.15
Proposed, not sanctioned1,751 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 9, 10, Mary Land Corner, Beside Next Show Room, Eastern Express High Way, Near Sion Circle, Sion, Mumabi Maharashtra.400022
Estimated costRs 11.01 cr
Work done0.0%
BuildingWingEstimatedIncurred
AURIS NEXUS TOWER 4 COMMERCIAL -SALE BLDG NO1 WING D COMMERCIALNARs 9.69 cr-
-NARs 1.32 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMrArun Gurav
ArchitectNinad
EngineerMr Shrikhant Bhanje
EngineerSanjay Singh
Chartered AccountantNihar Atul Mehta
Chartered AccountantS P Gunjal & Associates
PartnerRole in project
Asmira Ventures Private Limited-

Litigation declared30

CaseCourtStatus
SC NO 3849 OF 2004 461 of 462 of 2015/2004CITY CIVILPENDING
3849 OF 2004 COUNTER CLAIM 10 OF 2014/2004CITY CIVILPENDING
SC NO 846 OF 2013/2013CITY CIVILPENDING
SC NO 545 OF 2007/2007CITY CIVILPENDING
5074 OF 2013/2013HIGH COURTPENDING
261 OF 2013/2013SLUM TRIBUNAL MUMBAIPENDING
2847 OF 2011/2011HIGH COURTPENDING
10725 OF 2015/2015HIGH COURTPENDING
1346 OF 2019/2019HIGH COURTPENDING
1305 OF 2019 WP 31508 OF 2018/2019HIGH COURTPENDING
2947 OF 2017/2017HIGH COURTPENDING
2948 OF 2017/2017HIGH COURTPENDING
11710 OF 2016/2016HIGH COURTPENDING
8035 OF 2009/2009CITY CIVILPENDING
1456 OF 2020/2020CITY CIVILPENDING
1400 OF 2020/2020HIGH COURTPENDING
1387 OF 2019/2019HIGH COURTPENDING
193 OF 2014/2014HIGH COURTPENDING
3773 OF 2017/2017CITY CIVILPENDING
3201 OF 2016/2016CITY CIVILPENDING
353 OF 2005/2005CITY CIVILPENDING
2484 OF 2012/2012CITY CIVILPENDING
2842 OF 2015/2015CITY CIVILPENDING
3447 OF 2015/2015CITY CIVILPENDING
8640 OF 1990/1990CITY CIVILPENDING
2331 OF 2004/2004CITY CIVILPENDING
2067 OF 2019/2019CITY CIVILPENDING
2068 OF 2019/2019CITY CIVILPENDING
24464 OF 2021/2021HIGH COURTPENDING
2239 OF 2014/2014CITY CIVILPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plan with Highlight.pdf29 May 2026
Layout approvalFile: Floor Plan.pdf27 May 2026
Layout approvalFile: Car Parking Commercial.pdf14 May 2026
Layout approvalFile: Plan Commercial.pdf14 May 2026
Declaration and undertaking (Annexure A)File: Annexure A.pdf13 May 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 2File: Form 2.pdf4 May 2026
Withdrawal Update Form 3File: Form 3.pdf4 May 2026
Withdrawal Update Form 1File: Form - 1 Nexus.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2-Nexus.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3 Nexus.pdf19 Feb 2026
Form 1File: Form - 1 Nexus.pdf16 Feb 2026
Form 2File: Form 2 for Nexus.pdf16 Feb 2026
Form 3File: Form 3 Nexus.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Auris Nexus.pdf16 Feb 2026
Form 1File: Form 1.pdf30 Jan 2026
Form 2File: Form 2.pdf30 Jan 2026
Form 3File: FORM 03.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Inventory Sept 2025.pdf30 Jan 2026
Form 1File: Form 1 Auris Nexus Tower 4 June 2024.pdf9 Sep 2025
Form 2File: Form 2 Auris Nexus Tower 4 June 2024.pdf9 Sep 2025
Form 3File: Form 3 Auris Nexus Tower 4 June 2024.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure june 24.pdf9 Sep 2025
Form 1File: Form 1 Auris Nexus Tower 4 Sept 2024.pdf9 Sep 2025
Form 2File: Form 2 Auris Nexus Tower 4 Sep 2024.pdf9 Sep 2025
Form 3File: Form 3 Auris Nexus Tower 4 Sep 2024.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure Sep 24.pdf9 Sep 2025
Form 1File: Form 1 Auris Nexus Tower 4 Dec 2024.pdf9 Sep 2025
Form 2File: Form 2 Auris Nexus Tower 4 Dec 2024.pdf9 Sep 2025
Form 3File: Form 3 Auris Nexus Tower 4 Dec 2024.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure Dec 24.pdf9 Sep 2025
Form 1File: Form 1 Auris Nexus Tower 4 March 2025.pdf9 Sep 2025
Form 2File: Form 2 Auris Nexus Tower 4 March 2025.pdf9 Sep 2025
Form 3File: Form 3 Auris Nexus Tower 4 March 2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure March 25.pdf9 Sep 2025
Form 1File: Form 1 Auris Nexus Tower 4 June 2025.pdf9 Sep 2025
Form 2File: Form 2 Auris Nexus Tower 4 June 2025.pdf9 Sep 2025
Form 3File: Form 3 Auris Nexus Tower 4 June 2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure june 25.pdf9 Sep 2025
CERSAI detailsFile: doc28405120240422162646.pdf24 Apr 2024
Declaration about Commencement CertificateFile: cc decl.pdf20 Apr 2024
CERSAI detailsFile: cersai 300.pdf20 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_18_03_2024_17_58_18_674.pdf20 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_18_03_2024_17_51_35_987 copy.pdf20 Apr 2024
CERSAI detailsFile: cersai report.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf20 Apr 2024
Building plan approvalFile: IOA.pdf2 Apr 2024
Layout approvalFile: Plans 1 .pdf2 Apr 2024
Layout approvalFile: Plans 2.pdf2 Apr 2024
Layout approvalFile: Plans 3.pdf2 Apr 2024
Layout approvalFile: Plans 4.pdf2 Apr 2024
Layout approvalFile: Plans 5.pdf2 Apr 2024
Layout approvalFile: Plans 6.pdf2 Apr 2024
Layout approvalFile: Plans 7.pdf2 Apr 2024
Layout approvalFile: Plans 8.pdf2 Apr 2024
Layout approvalFile: Plans 9.pdf2 Apr 2024
Layout approvalFile: Plans 10.pdf2 Apr 2024
Layout approvalFile: Plans 11.pdf2 Apr 2024
Layout approvalFile: Plans 12.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 1 .pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 2.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 3.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 4.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 5.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 6.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 7.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 8.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 9.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 10.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 11.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Plans 12.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf2 Apr 2024
Proforma of Allotment letterFile: Allotment Letter- commercial.pdf19 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter Auris Nexus Tower 04 Commercial.pdf19 Mar 2024
Other - TechnicalFile: Declaration about Plot Area Aruris Nexus Tower 04 Commercial.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance fianancial Tower 04 Commecial R1.pdf6 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance legal R1 Commecial.pdf6 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance fianancial Tower 04 Commecial R1.pdf6 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance legal R1 Commecial.pdf6 Mar 2024
Other - LegalFile: Auris Conveyance -I (5550-07) PART - II.pdf6 Mar 2024

How this compares with Mumbai Suburban

44%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal Nexus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD6,700+ in Mumbai Suburban

Builder: Asmira Ventures Private Limited

Asmira Ventures Private Limited has 2 registrations on MahaRERA, including AURIS SERENITY TOWER 4 RESIDENTIAL and Runwal Nexus. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Runwal Nexus is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal Nexus?

The registered promoter entity is Asmira Ventures Private Limited, a company as per the filing. Its GSTIN 27ABCCA6873F1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal Nexus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Runwal Nexus?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal Nexus?

The professionals named in the filing: Architect: MrArun Gurav; Architect: Ninad; Engineer: Mr Shrikhant Bhanje; Engineer: Sanjay Singh; Chartered Accountant: Nihar Atul Mehta; Chartered Accountant: S P Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal Nexus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal Nexus. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal Nexus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.