Home / Browse projects / Thane, Maharashtra / RUHAAN AVENUE

Registered No litigation declared Others project

RUHAAN AVENUE

By RUHAAN CONSTRUCTION

RG-MH-17797 · RERA P51700055700 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 83%
23 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

RUHAAN AVENUE is a Others project by RUHAAN CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700055700 on 15 Apr 2024. Possession is promised by 30 Sep 2028. 7 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRUHAAN AVENUE
  • TypeOthers
  • Location
    • GEETA NAGAR
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700055700
  • ReraGenie IDRG-MH-17797

Builder

  • NameRUHAAN CONSTRUCTION
  • Entity typePartnership
  • PartnersIMITIAZ DINMOHAMMED RATNANI, MUSTAK UMEDALI HAMID, NIZARLI UMEDALI HAMID

Key dates

this monthRegisteredApr 2024PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2024
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

23%7 of 30 units booked
96.2%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1 GANGANA9724630

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 83%.

A-1 GANGA: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,290 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025
LandownerVillageDistrict
ANTHONY DUMBING PERREIRAMira-Bhayandar (M Corp.)Thane
JOSEPH DUMBING PERREIRAMira-Bhayandar (M Corp.)Thane
PAUL DUMBING PERREIRAMira-Bhayandar (M Corp.)Thane
STANY DUMBING PERREIRAMira-Bhayandar (M Corp.)Thane
BENETA WILFRED FARIYAMira-Bhayandar (M Corp.)Thane
AMIR GAFAR SHAIKHBHAYANDARThane

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI5157.34
Proposed, not sanctioned2,157 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1, Neera Complex, Silent Park, ICICI Bank Ltd 2 3, Bhayandar East, Mumbai, Maharashtra 40110
Estimated costRs 8.60 cr
Cost incurredRs 8.27 cr
Work done96.16%
BuildingWingEstimatedIncurred
A-1 GANGANARs 8.35 crRs 8.27 cr
-NARs 25.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAZIM MUSHTAQ SHAIKH
EngineerAMAN HAMID
EngineerER ABHIJIT PHATARPEKAR
Chartered AccountantNIZAMUDDIN SHAIKH
PartnerRole in project
RUHAAN CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: REVISED CC.pdf6 May 2026
Building plan approvalFile: REVISED PLAN.pdf6 May 2026
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ RUHAAN AVENUE.pdf6 May 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ RUHAAN AVENUE.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ RUHAAN AVENUE.pdf6 May 2026
Withdrawal Update Form 1File: FORM 1_DEC 25_ RUHAAN EVENUE.pdf11 Feb 2026
Withdrawal Update Form 2File: FORM 2_DEC 25_ RUHAAN EVENUE.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3_DEC 25_ RUHAAN EVENUE.pdf11 Feb 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ RUHAAN AVENUE.pdf3 Oct 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ RUHAAN AVENUE.pdf3 Oct 2025
Withdrawal Update Form 3File: FORM 3_ SEP 35_ RUHAAN AVENUE.pdf3 Oct 2025
Form 1File: FORM 1_JUNE 25_RUHAAN AVENUE.pdf8 Aug 2025
Form 2File: FORM 2_JUNE 25_RUHAAN AVENUE.pdf8 Aug 2025
Form 3File: FORM 3_JUNE 25_RUHAAN AVENUE.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_JUNE 25_RUHAAN AVENUE.pdf8 Aug 2025
Form 1File: FORM 1_ JUNE 24.pdf4 Aug 2025
Form 2File: FORM 2_ JUNE 24.pdf4 Aug 2025
Form 3File: FORM 3_ JUNE 24.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 24.pdf4 Aug 2025
Form 1File: FORM 1_ SEP 24.pdf4 Aug 2025
Form 2File: FORM 2_ SEP 24.pdf4 Aug 2025
Form 3File: FORM 3_ SEP 24.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 24_ RUHAAN AVENUE.pdf4 Aug 2025
Form 1File: FORM 1_ DEC 24_ RUHAAN AVENUE.pdf4 Aug 2025
Form 2File: FORM 2_ DEC 24_ RUHAAN AVENUE.pdf4 Aug 2025
Form 3File: FORM 3_ DEC 24_ RUHAAN AVENUE.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_RUHAAN AVENUE.pdf4 Aug 2025
Form 1File: FORM 1_ MARCH 25_ RUHAAN AVENUE.pdf4 Aug 2025
Form 2File: FORM 2_ MARCH 25_ RUHAAN AVENUE.pdf4 Aug 2025
Form 3File: FORM 3_ MARCH 25_ RUHAAN AVENUE.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD _ MARCH 25_ RUHAAN AVENUE.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Aug 2024
Copy of the legal title reportFile: TITLE.pdf3 Apr 2024
Copy of the legal title reportFile: Consent Term (1)_compressed.pdf3 Apr 2024
Copy of the legal title reportFile: EINOC252 2010 (1).pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf3 Apr 2024
Copy of the legal title reportFile: Ruhaan Format A.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf28 Mar 2024
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf28 Mar 2024
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf28 Mar 2024
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf28 Mar 2024
Declaration about Commencement CertificateFile: 8 Declaration about Commencement Certificate.pdf28 Mar 2024
CERSAI detailsFile: 12 CERSAI details.pdf28 Mar 2024
Proforma of Agreement for saleFile: 15 Proforma of Agreement for sale.pdf28 Mar 2024
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf28 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 23 Separate Bank Account details including no encumbrances on the Bank Account or no escro28 Mar 2024
Deviation Report with respect to Allotment letterFile: 24 Deviation Report with respect to Allotment letter.pdf28 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 25 Deviation Report with respect to model copy of Agreement.pdf28 Mar 2024
Other - LegalFile: 18 Legal Other- 7-12.pdf28 Mar 2024
Other - TechnicalFile: 22 Technical - Annexure A.pdf28 Mar 2024
Other - FinanceFile: 1 Other - Legal.pdf23 Mar 2024
Other - TechnicalFile: 1 Other - Legal.pdf23 Mar 2024
Other - LegalFile: PARTNERSHIP DEED.pdf20 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT IN OTHER PROJECTS - PARTNER.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances.pdf29 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances.pdf29 Feb 2024
Declaration in FORM BFile: FORM B.pdf29 Feb 2024
Layout approvalFile: FINAL CC DRAWING.pdf24 Feb 2024
Building plan approvalFile: FINAL CC DRAWING.pdf24 Feb 2024
PAN CardFile: RUHAAN CONSTRUCTION FIRM PAN.pdf24 Feb 2024
Copy of Layout Approval (in case of layout)File: FINAL CC DRAWING.pdf24 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: FINAL CC DRAWING.pdf24 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: C C CERTIFICATE.pdf24 Feb 2024

How this compares with Thane

23%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUHAAN AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

Builder: RUHAAN CONSTRUCTION

RUHAAN CONSTRUCTION has 1 registration on MahaRERA, including RUHAAN AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RUHAAN AVENUE is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUHAAN AVENUE?

The registered promoter entity is RUHAAN CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUHAAN AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUHAAN AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUHAAN AVENUE?

The professionals named in the filing: Architect: NAZIM MUSHTAQ SHAIKH; Engineer: AMAN HAMID; Engineer: ER ABHIJIT PHATARPEKAR; Chartered Accountant: NIZAMUDDIN SHAIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUHAAN AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUHAAN AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUHAAN AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.