ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Rudraksh Vantage

Registered No litigation declared Residential / Group Housing project

Rudraksh Vantage

By GURUDATTA DEVELOPERS

RG-MH-66027 · RERA P52100054830 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 30Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
63 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

Rudraksh Vantage is a Residential / Group Housing project by GURUDATTA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054830 on 15 Feb 2024. Possession is promised by 31 Dec 2027. 59 of the 122 units on this registration are recorded sold or booked, and 8 of 30 construction stages are filed complete.

At a glance

Project

  • NameRudraksh Vantage
  • TypeResidential / Group Housing
  • Location
    • Punawale-Jambe Road
    • Opp PCMC School Malwadi
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054830
  • ReraGenie IDRG-MH-66027

Builder

  • NameGURUDATTA DEVELOPERS
  • Entity typePartnership
  • PartnersRajendra Vishnu Khade, Savita Baban Garje
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed137 files

Current status

48%59 of 122 units booked
57.0%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A-1NA161352052
Building A-2NA161352052
MHADANA5518018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

Building A-150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises62%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A-250%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises62%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MHADA0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered160
BuildingClosed/CoveredTotal
Building A-18080
Building A-28080

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,800 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025
LandownerVillageDistrict
Mr. Shivaji Ramhari KudalePunawalePune
Mrs. Gangubai Balasaheb KudalePunawalePune
Mr. Navnath Balasaheb KudalePunawalePune
Mr. Amit Balasaheb KudalePunawalePune
Miss. Priyanka Balasaheb KudalePunawalePune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation, Pimpri
Permissible FSI11806.42
Proposed, not sanctioned11,806 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Ground Floor and Mezzanine Floor Shop No 3 To 6 Bhumi Siddhi Plot No 1/4, Pune Maharashtra
Estimated costRs 51.86 cr
Cost incurredRs 29.53 cr
Work done56.96%
BuildingWingEstimatedIncurred
Building A-1NARs 17.29 crRs 9.84 cr
Building A-2NARs 17.29 crRs 9.84 cr
MHADANARs 17.29 crRs 9.84 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSudhir Surdi
EngineerSuPa Associates
EngineerKishor Vitthal Ingale
Chartered AccountantCA Amogh Ghule
Chartered AccountantGanesh Khatavkar & Associates
Chartered AccountantVishnu Salunkhe And Co
Chartered AccountantRanjit Shivthare & Co
PartnerRole in project
GURUDATTA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_Jun 26.pdf16 Jul 2026
Withdrawal Update Form 2File: FORM 2_Jun 26.pdf16 Jul 2026
Withdrawal Update Form 3File: FORM 3_Jun 26.pdf16 Jul 2026
Withdrawal Update Form 1File: FORM 1_March 26.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2_March 26.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3-March 26.pdf21 Apr 2026
Withdrawal Update Form 1File: FORM 1-DECEMBER 2025.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2-DECEMBER 2025.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3-DECEMBER 2025.pdf14 Jan 2026
Withdrawal Update Form 1File: FORM 1-SEPTEMBER 2025 (1).pdf21 Nov 2025
Withdrawal Update Form 2File: FORM 2-SEPTEMBER 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: FORM 3-SEPTEMBER 2025_compressed.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5-SEPTEMBER 2025.pdf21 Nov 2025
Withdrawal Update Form 1File: Architech Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 2_June 25.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Form 1File: Form 1_March 25.pdf19 Jul 2025
Form 2File: Form 2_March 25.pdf19 Jul 2025
Form 3File: Form 3_March 25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory_March 25.pdf19 Jul 2025
Form 1File: AR Certificate- Dec 24.pdf19 Jul 2025
Form 2File: Engineers Certificate- Dec 24.pdf19 Jul 2025
Form 3File: CA Certificate- Dec 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf19 Jul 2025
Form 1File: AR Certificates- Sep 2024.pdf19 Jul 2025
Form 2File: ER Certificates- Sep 2024.pdf19 Jul 2025
Form 3File: CA Certificates- Sep 2024.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf19 Jul 2025
Form 1File: Architech Certificate.pdf19 Jul 2025
Form 2File: Engineers Certificate.pdf19 Jul 2025
Form 3File: CA Certificate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf19 Jul 2025
Form 1File: Form 1_March 24.pdf19 Jul 2025
Form 2File: Form 2_March 24.pdf19 Jul 2025
Form 3File: Form 3_March 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf19 Jul 2025
Building plan approvalFile: Revised Plan 01.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 02.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 03.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 04.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 05.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 06.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 07.pdf3 Jul 2025
Building plan approvalFile: Revised Plan 08.pdf3 Jul 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY.pdf9 May 2025
Building plan approvalFile: AREA STATEMENT -1.pdf25 Apr 2025
Building plan approvalFile: BASEMENT 1 AND BASEMENT 2 -2.pdf25 Apr 2025
Building plan approvalFile: GROUND FLOOR-3.pdf25 Apr 2025
Building plan approvalFile: 4.pdf25 Apr 2025
Building plan approvalFile: 5.pdf25 Apr 2025
Building plan approvalFile: ELEVATION B-6.pdf25 Apr 2025
Building plan approvalFile: 7.pdf25 Apr 2025
Building plan approvalFile: -8.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT OF COSTRUCTION REVISED-09-04-2025.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: AREA STATEMENT -1.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: BASEMENT 1 AND BASEMENT 2 -2.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: GROUND FLOOR-3.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: ELEVATION B-6.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: -8.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECHTS CERTIFICATE 09-04-2025.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 9-4-2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate- Dec 24.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Dec 24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Dec 24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificates- Sep 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificates - Sep 2024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificates- Sep 2024.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Jul 2024
Building plan approvalFile: R Building Plan_Sheet No-1.pdf13 May 2024
Building plan approvalFile: R Building Plan_Sheet No-2.pdf13 May 2024
Building plan approvalFile: R Building Plan_Sheet No-3.pdf13 May 2024
Building plan approvalFile: R Building Plan_Sheet No-4.pdf13 May 2024

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rudraksh Vantage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp PCMC School Malwadi13,700+ in Pune

2 kmRudraksh VantageCompleted 72Lapsed / revoked 25Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 193 registered projects within 2 km.

Builder: GURUDATTA DEVELOPERS

GURUDATTA DEVELOPERS has 7 registrations on MahaRERA, including ELITE DREAM and GURUDATTA RESIDENCY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rudraksh Vantage is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rudraksh Vantage?

The registered promoter entity is GURUDATTA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rudraksh Vantage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rudraksh Vantage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rudraksh Vantage?

The professionals named in the filing: Architect: Sudhir Surdi; Engineer: SuPa Associates; Engineer: Kishor Vitthal Ingale; Chartered Accountant: CA Amogh Ghule; Chartered Accountant: Ganesh Khatavkar & Associates; Chartered Accountant: Vishnu Salunkhe And Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rudraksh Vantage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rudraksh Vantage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rudraksh Vantage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.