RR LAKSHMI ORCHID
By Shree Rajarajeshwari Constructions
RG-KA-99532 · RERA PRM/KA/RERA/1273/320/PR/281125/008286 · Last updated on RERA Karnataka portal: 14 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
RR LAKSHMI ORCHID is a Residential/Group Housing project by Shree Rajarajeshwari Constructions in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/320/PR/281125/008286 on 28 Nov 2025. Possession is promised by 30 Sep 2027. 2 of the 50 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.
At a glance
Project
- NameRR LAKSHMI ORCHID
- TypeResidential/Group Housing
- Location
- Kundapura
- Udupi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1273/320/PR/281125/008286
- ReraGenie IDRG-KA-99532
Builder
- NameShree Rajarajeshwari Constructions
- Entity typeProprietorship
- GSTIN29ACWPR8251Q1Z6
- Authorized SignatoryRavi R.,
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Nov 2025
- Promised completion30 Sep 2027
- Revised completionNone
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 14 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RR LAKHSMI ORCHID | - | - | - | 50 | 0 | 50 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 76%.
Building: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 76% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 20% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| C Udaya Rao | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 17.19 cr | Rs 76.52 lakh |
| - | NA | Rs 2.00 cr | - |
| - | NA | Rs 35.00 lakh | - |
| - | NA | Rs 25.00 lakh | - |
| - | NA | Rs 10.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bhanumathy G |
| Engineer | Arun Kumar S R |
| Chartered Accountant | B Mallaiah |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed69
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/320/PR/281125/008286 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: From 6.pdf | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4_CA Q4.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Jan 2026 |
| Current RTCFile: RTC.pdf | 24 Nov 2025 |
| MR Showing Flow of Title to Current OwnerFile: Mutation Registrar.pdf | 24 Nov 2025 |
| Will DeedFile: Will Deed.pdf | 24 Nov 2025 |
| Latest EC to till dateFile: EC.pdf | 24 Nov 2025 |
| Single layout Plan & Order CopyFile: Single layout Plan & Order Copy.pdf | 24 Nov 2025 |
| Approved Master Plan with Proposed Site AreaFile: Master Plan_Proposed Site.png | 24 Nov 2025 |
| Village MAP with Proposed Site AreaFile: Village MAP_Proposed Site.jpg | 24 Nov 2025 |
| KSPCB NOCFile: KSPCB NOC.pdf | 24 Nov 2025 |
| Engineer licence with self attestedFile: Eng License.pdf | 24 Nov 2025 |
| Form 6 - Eng Certificate for ongoing projectFile: Form 6.pdf | 24 Nov 2025 |
| Affidavit for NOCsFile: Affidavit for NOCs.pdf | 24 Nov 2025 |
| STP Drawing - Eng certifiedFile: STP Drawing.pdf | 24 Nov 2025 |
| Certified Estimated Cost of ConstructionFile: Estimation Cost Construction Sheet.pdf | 24 Nov 2025 |
| Building LicenseFile: Building License.pdf | 24 Nov 2025 |
| RTC, survey 120/2B1;120/1B2 | - |
| Mutation, survey 120/2B1;120/1B2 | - |
| Encumbrance Certificate, survey 120/2B1;120/1B2 | - |
| Conversion/Alienation Order, survey 120/2B1;120/1B2 | - |
| JDA, survey 120/2B1;120/1B2 | - |
| Khatha, survey 120/2B1;120/1B2 | - |
| Registration CertificateFile: GST Certificate.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Certificate issued by CA Form 1File: Form 4 CA Reg.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 - Arch Reg.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 - Eng Reg.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation.pdf | - |
| Balance Sheet 2023 - 2024File: BS 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: BS 2022-23.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: P&L 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: P&L 22-23.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR ACK 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR 22-23.pdf | - |
| Building License | - |
| Plan | - |
| Plan | - |
| Structural Stability Certificate | - |
| Project Specs | - |
| Proforma Agreement of Sale | - |
| Proforma of Allotment Letter | - |
| Form B | - |
| Violation | - |
| JD Cum Declaration | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Estimation Sheet | - |
| single layout Plan | - |
| Will Deed | - |
| Survey Sketch | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep RR LAKSHMI ORCHID on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
GRASSLANDS - LAKESIDE
GRAZLANZ PROPERTIES LLP
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
KIRTHI PALMVILLE PHASE II
KIRTHI CONSTRUCTION
RAINTREE
VINIT S AMIN
MANDAVI ROYAL GARDEN
MANDAVI INFRASTRUCTURES
Mandavi Casa Grande
J J Builders and Developers
See every Udupi project, with the district possession charts
Builder: Shree Rajarajeshwari Constructions
Shree Rajarajeshwari Constructions has 1 registration on RERA Karnataka, including RR LAKSHMI ORCHID. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if RR LAKSHMI ORCHID is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of RR LAKSHMI ORCHID?
The registered promoter entity is Shree Rajarajeshwari Constructions, a proprietorship as per the filing. Its GSTIN 29ACWPR8251Q1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in RR LAKSHMI ORCHID?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at RR LAKSHMI ORCHID?
The professionals named in the filing: Architect: Bhanumathy G; Engineer: Arun Kumar S R; Chartered Accountant: B Mallaiah. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RR LAKSHMI ORCHID?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.