ROYALPARK
RG-MH-77705 · RERA P52100018814 · Last updated on MahaRERA portal: 5 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 55 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ROYALPARK is a Residential / Group Housing project by BANKAR DUGANE ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100018814 on 5 Dec 2018. Possession was promised by 15 Mar 2022 and is now 55 months past that date. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameROYALPARK
- TypeResidential / Group Housing
- Location
- Mhalunge Road
- Varulwadi
- Junnar
- Pune
- 410504
- Pincode410504
- RERA no.P52100018814
- ReraGenie IDRG-MH-77705
Builder
- NameBANKAR DUGANE ASSOCIATES
- Entity typePartnership
- PartnersRohit Ramakant Bankar, Satish Ramakant Bankar
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Dec 2018
- Promised completion15 Mar 2022
- Revised completionRevised to 15 Mar 2022 (originally 31 Mar 2019)
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A-B | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
Wing A-B: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 5 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY GENU BAGADE |
| Partner | Role in project |
|---|---|
| BANKAR DUGANE ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdue this century's biggest disaster COVID-19 we have totally collapsed in every aspects. we have almost completed 90% work. after the lockdown clearance we are managing funds for remaining work, govt compliance , taxes, etc. we need at least 6 to 8 months to recover fron all the things. kindly give us an extension till 15 th march 2022.
Reason as filed by the promoterDelay in Construction
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601521 | Vinayak Keshav Deshpande | BANKAR DUGANE ASSOCIATES | 19/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Nov 2024
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 5 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 12 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA Form 5 FY 21-22.pdf | 12 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA Form 5 FY 2022-23.pdf | 12 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 12 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA FORM 5 FY 2023-24.pdf | 12 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY A And B.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: Certificates of CA Form - 3.pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY A.pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY B.pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY A.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY B.pdf | 23 Dec 2024 |
| Declaration in FORM BFile: FROM B.pdf | 16 Dec 2024 |
| Declaration in FORM BFile: FROM B.pdf | 14 Dec 2024 |
| Declaration in FORM BFile: FROM B.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY A.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY B.pdf | 14 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4) (2).pdf | 3 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf | 2 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4) (2).pdf | 2 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf | 30 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA Designated Bank Accounts (Format B).pdf | 30 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf | 19 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA Form 5 FY 21-22.pdf | 19 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA Form 5 FY 2022-23.pdf | 19 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA FORM 5 FY 2023-24.pdf | 19 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect's Occupancy Certificate.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Annual Audit Report of Statutory CA Form 5 FY 2017-18.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer' s Certificate on Quality Assurance Form 2024.pdf | 16 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of legal entity SocietyCo Op etc.pdf | 16 Nov 2024 |
| Status of ConveyanceFile: Status of Conveyance 2024.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: BDA RERA FORM 2A.pdf | 16 Nov 2024 |
| Other - FinanceFile: other finance.pdf | 16 Nov 2024 |
| Other - TechnicalFile: HPSCANNER1753.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance Form 2A.pdf | 16 Nov 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Home Buyer Allottee Grievance redressal cell 2024.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance Form 2A.pdf | 16 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured Unsecured finance availed for the project 2024.pdf | 16 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: DECLERATION RERA Affidavit.pdf | 28 Apr 2023 |
| Details of encumbrances concerned to LegalFile: DECLERATION RERA Affidavit.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf | 28 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer certificate on Quality Assurance Form 2A FY 2019-20.pdf | 28 Apr 2023 |
| CERSAI detailsFile: FORM D RERA.pdf | 28 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rera.pdf | 28 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rera.pdf | 28 Apr 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf | 28 Apr 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf | 28 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT.pdf | 28 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ANNEXTURE 1 RERA.pdf | 28 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT ANNEXTURE 1 RERA.pdf | 28 Apr 2023 |
| PAN CardFile: BDA PAN Card.pdf | 24 Aug 2021 |
| Declaration about Commencement CertificateFile: BDA RERA Under Circular 32.pdf | 24 Aug 2021 |
| Declaration in FORM BFile: BDA Rera Form B.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: BDA RERA FORM 2A (1).pdf | 24 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold booked inventory B.pdf | 24 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold booked inventory A.pdf | 24 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: BDA RERA FORM 5 -2018-2019.pdf | 24 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BDA RERA FORM 5 -2019-2020.pdf | 24 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: BDA RERA FORM 5 -2020-2021.pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (1).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (17).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (22).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (24).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (25).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (26).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (27).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (29).pdf | 24 Aug 2021 |
| OtherFile: PHOTO-2021-08-24-10-36-41 (16).pdf | 24 Aug 2021 |
| Layout approvalFile: HPSCANNER1755-ilovepdf-compressed (1)-compressed.pdf | 28 Nov 2018 |
| Building plan approvalFile: HPSCANNER1753-ilovepdf-compressed (1) (1).pdf | 28 Nov 2018 |
| Copy of the legal title reportFile: BDA-Title-Report-compressed.pdf | 28 Nov 2018 |
| Details of encumbrancesFile: BDA SANCTION LETTER.pdf | 28 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: HPSCANNER1755-ilovepdf-compressed (1)-compressed.pdf | 28 Nov 2018 |
| Building Plan Approval (IOD)File: HPSCANNER1753-ilovepdf-compressed (1) (1).pdf | 28 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COmmencement Certificate-ilovepdf-compressed.pdf | 28 Nov 2018 |
| Declaration in FORM BFile: Form B_0001.pdf | 28 Nov 2018 |
| Certificates of CA (Form 3)File: CA Form3-ilovepdf-compressed.pdf | 28 Nov 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ROYALPARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Varulwadi13,700+ in Pune
SUYOG SAMRAJYA
ASHIRWAD INFRASTRUCTURES
Vizion Bliss
VIZION CONSTRUCTION
Crystal Tower Phase 2
Jadhav Civil Project
Vaishnavi Vastu A and B
VAISHNAVI PROMOTERS AND DEVELOPERS
FLORINA RESIDENCY
DEEPALI BUILDCON
FLORINA PHASE II
DEEPALI BUILDCON
Builder: BANKAR DUGANE ASSOCIATES
BANKAR DUGANE ASSOCIATES has 1 registration on MahaRERA, including ROYALPARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that ROYALPARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ROYALPARK is delayed beyond 15 Mar 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ROYALPARK?
The registered promoter entity is BANKAR DUGANE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ROYALPARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ROYALPARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ROYALPARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ROYALPARK?
The professionals named in the filing: Architect: SANJAY GENU BAGADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ROYALPARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback