ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Royal Town

Registered No litigation declared Plotted project

Royal Town

By M/S SAHARA BUILDERS

RG-MH-30442 · RERA P50500048526 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedno revision filed
7 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

Royal Town is a Plotted project by M/S SAHARA BUILDERS in Nagpur, Maharashtra, registered with MahaRERA as P50500048526 on 6 Jan 2023. Possession is promised by 31 Dec 2032. 15 of the 22 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRoyal Town
  • TypePlotted
  • Location
    • Nagpur
    • Ghogali Nagpur
    • Ghogali
    • Nagpur (Rural)
    • 440027
  • Pincode440027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500048526
  • ReraGenie IDRG-MH-30442

Builder

  • NameM/S SAHARA BUILDERS
  • Entity typePartnership
  • PartnersRavindra Kawduji Nagpure, Vivek Chirabrata Majumdar
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2023PromisedDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jan 2023
  • Promised completion31 Dec 2032
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed139 files

Current status

68%15 of 22 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes65%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,493 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Sunilkumar RaiNagpur (M Corp.)Nagpur
Ravindra NagpureNagpur (M Corp.)Nagpur
Vivek MajumdarNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityOffice of District Collector , nagpur
Permissible FSI5492.58
Proposed, not sanctioned5,493 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManish Nagar Nagpur

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavindra Nagpure
ArchitectPadole Associates
EngineerVivek Majumdar
Chartered AccountantRishi Lashkare
Chartered AccountantGirish Chandak
Chartered AccountantAPJ & Associates
PartnerRole in project
M/S SAHARA BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE- MARCH 26.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE- MARCH 26.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE-MARCH 26.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-09-25pdf.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-09-25pdf.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-09-25.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-09-25.pdf28 Jan 2026
Withdrawal Update Form 3File: Form3 CA Certificate.pdf28 Jan 2026
Withdrawal Update Form 3File: Form3 CA Certificate.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-09-25pdf.pdf30 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-09-25pdf.pdf30 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-09-25.pdf30 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-09-25.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE-30-09-2025.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE-30-09-2025.pdf30 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-09-25pdf.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-09-25.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE-30-09-2025.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM NO1 ARCHITECT CERTIFICATE.pdf4 Aug 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE (2).pdf4 Aug 2025
Withdrawal Update Form 3File: FORM NO3 CA CERTIFICATE.pdf4 Aug 2025
Withdrawal Update Form 1File: FORM NO1 ARCHITECT CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM NO1 ARCHITECT CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE (2).pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE (2).pdf31 Jul 2025
Withdrawal Update Form 3File: FORM NO3 CA CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM NO3 CA CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM NO1 ARCHITECT CERTIFICATE.pdf23 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE (2).pdf23 Jul 2025
Withdrawal Update Form 3File: FORM NO3 CA CERTIFICATE.pdf23 Jul 2025
Form 3File: Form 3 CA CERTIFICATE 31-03-2023.pdf21 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf21 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold inventory.pdf21 Jul 2025
Form 1File: Architect Certificate 30-06-2023.pdf21 Jul 2025
Form 2File: Engineer certificate 30-06-2023.pdf21 Jul 2025
Form 3File: FORM 3CA CERTIFICATE 30-06-2023.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY.pdf21 Jul 2025
OthersFile: Engineer Certificate for Quality Assurance form 2A.pdf21 Jul 2025
Form 1File: FORM 1, ARCHITECT'S CERTIFICATE 30-09-2023.pdf21 Jul 2025
Form 2File: FORM 2,ENGINEER CERTIFICATE.pdf21 Jul 2025
Form 3File: FORM 3 CA CERTIFICATE 30-09-2023.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY.pdf21 Jul 2025
OthersFile: FORM-2A ENGINEER CERTIFICATE FOR QUALITY ASSURANCE 30-09-2023.pdf21 Jul 2025
Self-declaration of Quarterly ProgressFile: FORM 5 ANNUAL REPORT.pdf21 Jul 2025
Form 1File: Form 1 ARCHITECT CERTIFICATE.pdf21 Jul 2025
Form 2File: FORM 2 ENGINEERS CERTIFICATE.pdf21 Jul 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY.pdf21 Jul 2025
Form 1File: FORM 1 ARCHITECTS CERTIFICATE 31-03-2024.pdf21 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE 31-03-2024.pdf21 Jul 2025
Form 3File: Form 3 CA CERTIFICATE 31-03-2024.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY.pdf21 Jul 2025
Form 1File: Form-1 Architect's Certificate 30-09-2024.pdf21 Jul 2025
Form 2File: Form-2 Engineers Certificate-30-09-2024.pdf21 Jul 2025
Form 3File: Form-3- CA Certificate 30-09-2024.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Inventory 30-09-2024.pdf21 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf21 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf21 Jul 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Inventory 31-03-2025.pdf21 Jul 2025
Form 1File: FORM NO1 ARCHITECT CERTIFICATE 30-06-2024.pdf21 Jul 2025
Form 2File: Form-2 Engineers Certificate 30-06-2024.pdf21 Jul 2025
Form 3File: Form3 C A Certificate.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Inventory 30-06-2024.pdf21 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf21 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf21 Jul 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Inventory 31-12-2024.pdf21 Jul 2025
Withdrawal Update Form 1File: FORM NO1 ARCHITECT CERTIFICATE.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE (2).pdf21 Jul 2025
Withdrawal Update Form 3File: FORM NO3 CA CERTIFICATE.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-unsold Inventory 31-03-2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE (2).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf20 Jan 2025

How this compares with Nagpur

68%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Royal Town on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghogali Nagpur2,800+ in Nagpur

2 kmRoyal TownCompleted 12Lapsed / revoked 14Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: M/S SAHARA BUILDERS

M/S SAHARA BUILDERS has 2 registrations on MahaRERA, including Royal Town and Tulip. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Royal Town is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Royal Town?

The registered promoter entity is M/S SAHARA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Royal Town?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Royal Town?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Royal Town?

The professionals named in the filing: Architect: Ravindra Nagpure; Architect: Padole Associates; Engineer: Vivek Majumdar; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Girish Chandak; Chartered Accountant: APJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Royal Town?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Royal Town. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Royal Town to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.